Putzmeister Concrete Technology

Putzmeister Concrete Technology Putzmeister Concrete Technology

<strong>Putzmeister</strong><br />

<strong>Concrete</strong> <strong>Technology</strong><br />

Our solutions for<br />

economic concrete placing<br />

1<br />

2<br />

3<br />

4<br />

5<br />

BP 4200 GB


<strong>Putzmeister</strong><br />

<strong>Concrete</strong> <strong>Technology</strong><br />

We are specialists in<br />

pumping and placing<br />

of concrete – worldwide<br />

Whether in construction, underground<br />

work or civil engineering projects, on a<br />

small building site or as part of a large<br />

project – <strong>Putzmeister</strong> concrete pumps<br />

and placing systems can be found on<br />

construction sites throughout the world.<br />

Truck-mounted concrete pumps with fl exible<br />

booms and a wide range of equipment<br />

options, high-pressure concrete<br />

pumps for extreme applications conveying<br />

to great heights and over long distances,<br />

as well as placing booms and<br />

system accessories are able to cope with<br />

every kind of demand.<br />

Technical innovations and the very highest<br />

quality standards in manufacturing<br />

and service are at the heart of what we<br />

do.<br />

Today, <strong>Putzmeister</strong> offers a broad product<br />

range across the world, featuring<br />

machines innovative functions. And, with<br />

more than fi ve decades of experience in<br />

conveying and placing concrete, our customers<br />

can rely on us as experts for assistance<br />

with their challenging projects.<br />

8<br />

innovative<br />

We offer a broad range of pumps and<br />

placing booms to optimise your fl eet<br />

We use the highest quality materials<br />

and specially designed components<br />

We implement strict quality assurance,<br />

economic<br />

We lead the way in innovation<br />

from development right through to production<br />

qualitative<br />

Our machines undergo the harshest tests and<br />

fulfi l the high statutory safety standards<br />

We supply a comprehensive range of equipment<br />

and options for practical operations<br />

Our service network is very accessible to customers – worldwide<br />

Our machine technology pays for itself<br />

We provide systems engineering and<br />

advice for economical complete solutions<br />

future-oriented<br />

2 BP 4200 GB BP 4200 GB<br />

3


Machines and service…<br />

„I must be able to work<br />

effi ciently and safely.“<br />

„My job is to place concrete,<br />

quickly and to the satisfaction of<br />

my customers. That’s why I use a<br />

<strong>Putzmeister</strong> pump.“<br />

The Ergonic ® Pump System (EPS) provides<br />

optimum control for pumping<br />

operations. The Ergonic ® Boom Control<br />

(EBC) provides, among other things,<br />

for the precise, easy control of the<br />

end hose. The Ergonic ® Graphic Display<br />

(EGD) shows the current information<br />

about the machine.<br />

10<br />

Assistance systems for supporting the<br />

truck-mounted concrete pump, such as<br />

OSS (One-Side Support) ensure greater<br />

safety during operations and take<br />

up less space on the construction site.<br />

The variable-position telescopic support<br />

(on large booms) greatly increases its<br />

useful working range.<br />

Practical equipment and a comprehensive<br />

range of accessories, e.g. a powerful<br />

high-pressure cleaner helps with<br />

work on the construction site.<br />

„Burj Khalifa, Dubai 2007: A<br />

new high-rise world record with a<br />

pumping height of 606 m. 165,000<br />

cubic metres of high-performance<br />

concrete. 400 bar concrete pressure<br />

with an average pumping output<br />

of 40 cubic metres per hour.“<br />

A project like this demands a truly reliable<br />

technology: high-quality system<br />

components, made by leading manufacturers<br />

to the high <strong>Putzmeister</strong> quality<br />

standards. Extensive tests to which<br />

<strong>Putzmeister</strong> machines are subjected<br />

beforehand. Top quality parts reduce<br />

wear and increase the service life.<br />

Good accessibility, e.g. of cylinders, and<br />

functions such as the centralized gauge<br />

ports make maintenance and servicing<br />

easier.<br />

„I expect reliability. At all times.“<br />

9<br />

„The operating costs must be<br />

low and readily calculated.“<br />

„Because I don’t want any<br />

unpleasant surprises on the construction<br />

site, I have taken precautions:<br />

with <strong>Putzmeister</strong>.“<br />

<strong>Putzmeister</strong> has well-conceived solutions<br />

for minimising operating costs: The<br />

EPS intelligent pump control system,<br />

and components that reduce wear<br />

and fuel consumption, such as the<br />

HLS core pump or a weight-optimised<br />

design.<br />

A range of packages through to a full<br />

service contract ensure that costs can<br />

be readily calculated. Competent<br />

advice, planning and training are<br />

important for successful projects. The<br />

i-Daisy fl eet management system ensures<br />

transparency and keeps costs<br />

to a minimum.<br />

„What makes good service?<br />

Competent, fast help without the<br />

need to go far. Full stop.“<br />

<strong>Putzmeister</strong> has a comprehensive<br />

service network, with qualifi ed service<br />

technicians in over 150 countries all<br />

over the world. Tested spare parts are<br />

used, even in machines that have been<br />

used for 20 years.<br />

„I want good service<br />

when it’s needed.“<br />

Comprehensive machine documentation<br />

means that the correct spare part can<br />

be located quickly. Fault diagnosis<br />

on the machine provides rapid assistance<br />

during servicing. Manufacturer inspections<br />

increase the service life. Certifi<br />

ed training and further education<br />

at the <strong>Putzmeister</strong> Academy ensures<br />

greater competence and safety.<br />

…from <strong>Putzmeister</strong><br />

4 BP 4200 GB BP 4200 GB<br />

5<br />

12<br />

11


1<br />

BP 4200 GB BP 4200 GB<br />

13<br />

Truck-mounted<br />

concrete pumps<br />

<strong>Putzmeister</strong> truck-mounted concrete<br />

pumps are available for diverse applications<br />

and feature placing booms with a<br />

vertical reach from 20 m to 0 m, delivery<br />

rates of up to 200 m 3 /h and concrete<br />

pressures of up to 130 bar.<br />

Our pumps have proven to be resilient<br />

and reliable workhorses in long-term<br />

usage throughout the world. This is<br />

based on 50 years of experience in the<br />

development of pumps, booms and<br />

base structures. Only through the optimum<br />

combination of boom length (load<br />

torque), boom kinematics, standing<br />

weight and support measures is it possible<br />

to continuously create successful<br />

concrete pumps such as the almost<br />

legendary <strong>Putzmeister</strong> M 3 .<br />

<strong>Putzmeister</strong> offers one of the<br />

widest ranges of truck-mounted<br />

concrete pumps in the world<br />

Stay ahead of the game with<br />

<strong>Putzmeister</strong> truck-mounted<br />

concrete pumps<br />

n<br />

n<br />

n<br />

Our comprehensive product range includes<br />

suitable machines for meeting<br />

country-specific licensing regulations<br />

(permitted total weight, axle loads,<br />

safety regulations, etc.)<br />

Low operating costs due to low-wear<br />

materials and intelligent control systems<br />

for reducing fuel consumption<br />

User-friendly and safe due to ergonomic<br />

design and assistance systems<br />

for individual functions<br />

The type of folding, number of boom<br />

arms and joint angles are optimally<br />

aligned for specific applications<br />

Maximum stability and net reach with<br />

flexible supports<br />

Highest quality thanks to professional<br />

processing of the best available<br />

materials and high-strength steel up<br />

to S 9 0<br />

CE marking: more than just a label!<br />

At <strong>Putzmeister</strong>, EU Directives and<br />

harmonised standards such as EN<br />

12001 form the basis of development<br />

and are applied right the way through<br />

to commissioning.<br />

Used on construction sites all over the world: <strong>Putzmeister</strong> truck-mounted concrete pumps with a vertical reach from 20 to 0 m<br />

14 15<br />

n<br />

n<br />

n<br />

n


1<br />

1<br />

Stationary concrete pumps<br />

and booms<br />

Stationary concrete pumps of different<br />

output classes get the work done economically<br />

and reliably. They are equally<br />

at home with world record projects<br />

– such as the Burj Khalifa – and normal<br />

construction and civil engineering projects,<br />

or as specialists in tunnelling or<br />

power plant construction.<br />

<strong>Putzmeister</strong> pumps, placing booms, systems<br />

engineering and service combine to<br />

give an economic, comprehensive solution.<br />

u Large <strong>Putzmeister</strong> placing booms with<br />

reaches of 38 – 50 m<br />

t A BSA 1408 pumps concrete over 150 m to<br />

a stationary boom during the construction of<br />

the KOPS II pumped storage power plant in the<br />

Montafon, Austria<br />

BP 4200 GB<br />

For the highest demands<br />

and economic solutions<br />

n<br />

High-output concrete pumps for a variety<br />

of applications – from compact<br />

trailer concrete pumps for e.g. fine<br />

concrete, liquid screed or shotcrete,<br />

through to super-high pressure<br />

pumps for extreme delivery rates and<br />

distances<br />

Modern placing booms on freestanding<br />

or auto-climbing tubular<br />

columns or on lattice towers, together<br />

with proven systems engineering,<br />

accessories and components for<br />

efficient concrete distribution<br />

Optimised pump control – Ergonic<br />

q Last but not least, our reliable systems<br />

engineering with delivery lines, transfer tubes and<br />

cleaning gallows, guaranteed record high-rise<br />

q A compact stationary concrete pump at work pumping at the Burj Khalifa site, Dubai<br />

®<br />

n<br />

n Comprehensive advice, economic<br />

design and capacity advice, planning<br />

Pump System fitted as standard – for and assistance<br />

economic operation<br />

18 19<br />

n<br />

20<br />

9


„Eine Betonpumpe sollte meine<br />

tägliche Arbeit erleichtern“<br />

10 BP 4200 GB<br />

21<br />

PUMI ®<br />

truck-mixer concrete pumps<br />

BP 4200 GB<br />

22<br />

The PUMI ® –<br />

the original by <strong>Putzmeister</strong><br />

Flexibility with a capital F: Transporting,<br />

pumping, placing – all with one machine<br />

and just one machine operator. This saves<br />

time and money.<br />

Since 19 , increasing numbers of customers<br />

have been satisfied with the advantages<br />

offered by a PUMI ® . It is an addition<br />

to the fleet of truck-mixers held by<br />

service and customer-oriented suppliers<br />

Economic concreting on small construction sites<br />

– with the PUMI ®<br />

23<br />

of ready-mixed concrete and significantly<br />

extends the range of jobs they can take<br />

on. In particular, it can be operated efficiently<br />

and quickly in small construction<br />

sites up to approximately 20 m 3 .<br />

And wherever there is not much space, it<br />

comes into its own due to its narrow setup<br />

dimensions. That is, it can be used on<br />

cramped construction sites, in cities and<br />

in crowded residential areas.<br />

n<br />

n<br />

PUMI ® s come with flexible placing<br />

booms from 21 to 31 m vertical reach<br />

Three different pumping systems<br />

for every requirement: rotor pump,<br />

CS piston pump and S transfer tube<br />

piston pump<br />

Rotor pump<br />

S transfer tube<br />

piston pump<br />

CS<br />

piston pump<br />

24<br />

25<br />

2<br />

11


„Eine Betonpumpe sollte meine<br />

tägliche Arbeit erleichtern“<br />

2 28<br />

29 30<br />

12 BP 4200 GB<br />

31<br />

Economic solutions for the<br />

precast parts industry<br />

BP 4200 GB<br />

Autocor ® – quick, clean and fully-<br />

automatic concrete placement<br />

Autocor ® covers systems for the pumping<br />

and distribution of concrete in precast<br />

parts works. Autocor ® is particularly<br />

useful in works which use pumpable or<br />

self-compacting concrete to produce<br />

precast parts.<br />

Autocor ® solutions can be rail-mounted,<br />

mobile or stationary within the factory<br />

shed. Autocor ® systems can be made<br />

up of different combinations of placing<br />

booms (1 – 28 m) and concrete pumps<br />

(rotor and piston pumps) to suit your requirements.<br />

32<br />

Autocor ® benefits at a glance:<br />

n<br />

n<br />

n<br />

n<br />

n<br />

n<br />

n<br />

Ideal for precast concrete parts plants<br />

which produce medium or large<br />

structural parts and use pumpable<br />

normal concrete or self-compacting<br />

concrete<br />

Increases the production volume by<br />

up to 0 %<br />

Higher quality of parts thanks to<br />

continuous concrete placement<br />

Cleaner process thanks to closed<br />

system<br />

No expensive and time-consuming<br />

lining of the formwork thanks to<br />

flexible boom<br />

Formwork can be filled from top or<br />

bottom<br />

Separates crane operation from the<br />

concreting process<br />

Autocor ® system solutions are available as<br />

mobile or stationary variants, for filling from top<br />

or bottom, by placing boom, rotary distributor or<br />

stationary delivery line.<br />

Your individual requirements will determine<br />

which proven <strong>Putzmeister</strong> components you will<br />

use to make up your Autocor ® system.<br />

13


1 2<br />

3<br />

4<br />

5<br />

6<br />

34<br />

35<br />

3<br />

3<br />

38<br />

Real concrete placement<br />

specialists<br />

Shotcrete in tunnel construction<br />

with the high-output <strong>Putzmeister</strong><br />

pumps and manipulators<br />

Shotcreting is an indispensable process<br />

for concreting in modern tunnel construction:<br />

with low spray mist, little rebound,<br />

low energy consumption and comparably<br />

low-cost installation.<br />

Shotcrete manipulators for concrete<br />

application rates of up to 30 m 3 /h<br />

with vertical and horizontal reaches of<br />

up to 1 m<br />

Compact stationary concrete pumps<br />

for manual wet spraying<br />

<strong>Concrete</strong> application in tunnel<br />

construction<br />

<strong>Concrete</strong> pumps and distribution<br />

systems for concreting floors, arches,<br />

track bedding and intermediate levels<br />

in tunnels, and for lining chambers<br />

Formwork distributor for continuous<br />

backfilling<br />

Complete concreting trains for<br />

tunnelling<br />

Tunnel construction<br />

Infrastructure projects<br />

Large-scale projects<br />

14 BP 4200 GB BP 4200 GB<br />

15<br />

33<br />

n<br />

n<br />

n<br />

n<br />

n<br />

t<br />

1 Tunnel stabilisation with the<br />

Sika-PM500PC shotcrete manipulator<br />

2 Slope reinforcement<br />

3 Manual shotcrete application<br />

4 Concreting an inner formwork with<br />

concrete pump and Twistip<br />

5 Complete concreting trains for tunnelling<br />

<strong>Concrete</strong> placing in formwork truck<br />

Telebelt ® – the mobile belt distributor<br />

for the economic placement<br />

of concretes and bulk materials<br />

With its telescopic conveyor belt with a<br />

horizontal reach of up to 39 m and output<br />

of 2 5 m 3 /h, the Telebelt ® is practically<br />

unbeatable, for placing concrete quickly<br />

and economically.<br />

Suitable for all kinds of bulk materials<br />

– e.g. gravel, sand, substrate, soil, and<br />

of course, all kinds of concrete – it is the<br />

real all-rounder of any construction site.<br />

The Telebelt ® is used, for example, in<br />

dam construction, when infilling in pits<br />

and track bedding, or constructing green<br />

roofs.<br />

With the Telebelt ® TBS 130 as a semitrailer,<br />

the tractor unit is also available<br />

for other transport operations, making it<br />

even more economical.<br />

<strong>Putzmeister</strong> offers efficient solutions for many other applications, e.g. bored pile<br />

foundations with self-driving concrete pumps on a crawler chassis. Just ask us.<br />

39<br />

40


World record delivery height at<br />

Burj Khalifa, Dubai · 606 m<br />

World record facts<br />

1 5,000 m3 concrete pumped at<br />

an output of 40 m3 /h – even on<br />

reaching the record height this<br />

was still 30 m3 n<br />

/h!<br />

n 400 bar maximum concrete<br />

pressure!<br />

n High-performance concrete<br />

up to C100!<br />

n Four stationary MX placing<br />

booms in use!<br />

Comprehensive planning<br />

and preparation<br />

n 3D site planning and new<br />

delivery line concept<br />

n Development of the<br />

BSA 14000 SHPD superhigh<br />

pressure pump<br />

n Pump tests<br />

41<br />

The challenges of<br />

a large project<br />

Ambitious construction projects are a<br />

challenge for all those involved. Competent<br />

advice, economic arrangements and<br />

capacity planning, general planning and<br />

support during the actual concrete pumping<br />

and placing are therefore critical factors.<br />

Eagle’s nest tunnel, Hong Kong, China · Jumei-<br />

rah Lake Towers, UAE · Arraya Tower, Kuwait<br />

· Kárahnjúkar pumped-storage power station,<br />

Iceland · Glendoe Water Power Plant, Scot-<br />

land · Jordan Gate Project Amman, Jordan ·<br />

City tunnel, Malmø, Sweden · Eureka Tower,<br />

Australia · North-East MRT Line, Singapore ·<br />

Limberg II Kaprun pumped-storage power sta-<br />

<strong>Concrete</strong> delivery at the limits<br />

The <strong>Putzmeister</strong> <strong>Concrete</strong> Project Division<br />

(CPD) mechanical engineers and<br />

construction engineers have specialist<br />

knowledge of concrete pumping, the<br />

pressure and flow behaviour of concrete,<br />

and the calculation and configuration of<br />

demanding concrete pumping systems.<br />

Details of concrete installation quantities,<br />

execution and site plans and details<br />

of the construction sequence (time schedules,<br />

site logistics) enable mutually beneficial,<br />

optimised alternative solutions<br />

to be developed.<br />

We plan construction site installations,<br />

the set-up sites for placing<br />

booms, static specifications for the<br />

concrete pumping and placing technology<br />

and much more.<br />

We reduce costs and ensure availability<br />

n Benefit from our professional support<br />

We advise you on the composition<br />

and mixture breakdown of your<br />

pumping concrete<br />

We train your employees on site,<br />

using the actual machines that they<br />

will be operating<br />

tion, Austria · RWE Tower Dortmund, Germany · Kops II pumped-storage power station, Austria · Köröshegy motorway bridge, Hungar<br />

· New York City Water Tunnel, USA · Doha City Center, Qatar · Twin Towers, Luxembourg · Strelasund crossing, Germany · The Fir<br />

World, Korea · Montezic pumped-storage power station, France · Riva del Garda pumped-storage power station, Italy · Betzdorf tunne<br />

Germany · Burj Khalifa, UAE · Montreal waste water collection system, Canada · Estangento Sallente pumped-storage power station<br />

Spain · LNG Tanks, Mugardos, Spain · Tunnel, Bangkok, Thailand · Neurath coal-fired power station, Germany · Lainzer tunnel, Vien<br />

1 BP 4200 GB<br />

na, Austria · Dubai Pearl, UAE · OpernTurm, Frankfurt, Germany · Le Refrain pressure pipeline, France · New Street, Dublin, Irelan<br />

BP 4200 GB<br />

1<br />

· Dubai Festival City, UAE · Western Trunk Sewer Project, Australia · Hilton Hotel, Manchester, UK · Upper Eastside, Berlin, German<br />

n<br />

n<br />

n<br />

n<br />

42 43


18 BP 4200 GB BP 4200 GB<br />

44<br />

45<br />

Outstanding technology<br />

is our strength<br />

inside<br />

t Test in the cold chamber: a BSF 20-4 was<br />

operated in the climatic wind tunnel at minus<br />

25 °C. The test clearly showed that <strong>Putzmeister</strong><br />

pumps can deliver concrete even at this low<br />

temperature.<br />

Leading the way with innovation<br />

– well-designed and thoroughly tested<br />

For over 50 years, the user-friendly and<br />

efficient pumping of concrete has been<br />

closely linked to innovations and ideas<br />

from <strong>Putzmeister</strong>.<br />

The Ergonic ® systems for the control of<br />

placing booms and pumps offer increased<br />

placing output, greater safety and easier<br />

operation, as well as lower fuel and wear<br />

costs.<br />

q <strong>Putzmeister</strong> machines and components are subjected to demanding tests<br />

And to ensure that these innovations also<br />

function reliably in the long-term, components<br />

and new developments are subjected<br />

to numerous tests, such as<br />

n<br />

n<br />

n<br />

n<br />

n<br />

Life cycle simulations for placing<br />

booms<br />

Wear tests for delivery lines,<br />

spectacle wear plates, etc.<br />

Pulse tests and burst pressure tests<br />

for delivery and hydraulic hoses<br />

Climate, temperature and spray tests<br />

for whole machines and components<br />

– ensuring that a concrete pump can<br />

be operated between – 15 °C and<br />

+ 50 °C in accordance with standards.<br />

Performance tests and continuous<br />

load tests, etc.<br />

4<br />

19


4 48<br />

<strong>Putzmeister</strong> Services<br />

Our aim is to reduce costs, whether for<br />

a scheduled service or during ongoing<br />

operation of your machine.<br />

Whenever you need help and advice, we<br />

are there for you in over 150 countries<br />

worldwide, providing a professional and<br />

reliable service. For example, <strong>Putzmeister</strong><br />

can deliver tested, guaranteed original<br />

parts direct to your door, 24 hours a day.<br />

p High-quality wear parts: <strong>Putzmeister</strong> quality<br />

adapted for all requirements<br />

u Regular services and inspections increase<br />

availability and minimise operating costs<br />

t We offer training courses and instructions<br />

worldwide for greater safety, competence and<br />

economic efficiency<br />

Readily-calculated operating<br />

costs and high availability<br />

With our high-performance original wear<br />

parts you will ultimately save money. The<br />

individual parts of a delivery line, for example,<br />

are matched with one another for<br />

optimum replacement. There will be no<br />

sudden unpleasant surprises.<br />

An important aspect of economic operations<br />

is the oil management of the pump.<br />

We help you on the technical side with<br />

modern, long-lasting filters and training<br />

of operatives in the correct servicing<br />

procedures. Our own in-house academy<br />

offers frequent seminars and courses, at<br />

<strong>Putzmeister</strong> or on site at your premises,<br />

teaching theory and practice. For greater<br />

safety, competence and efficiency.<br />

You have complete cost transparency and<br />

the best possible availability with our full<br />

service contracts, in which all maintenance<br />

work and spare parts are calculated<br />

per cubic metre pumped. Alternatively,<br />

we also offer service packages covering<br />

certain aspects of maintenance and inspection.<br />

Just ask us!<br />

20 BP 4200 GB BP 4200 GB<br />

21<br />

49<br />

50<br />

51


Boom test<br />

area<br />

Paint centre<br />

Truck-mounted<br />

concrete<br />

pump and<br />

PUMI<br />

assembly<br />

Mortar<br />

machines<br />

assembly<br />

Parts warehouse<br />

Purchasing/accounts<br />

Goods in/dispatch<br />

Hydraulic systems assembly<br />

Stationary concrete pumps<br />

Core pumps,<br />

Solid pumps fi nal assembly<br />

Administration/technology<br />

Mortar machines and<br />

Solid pumps<br />

<strong>Putzmeister</strong> Academy<br />

Radio testing<br />

Boom<br />

assembly<br />

Administration<br />

Parts sales<br />

Technical<br />

service<br />

Testing<br />

If you want to be successful globally, you<br />

have to be at home in the world. As well<br />

as our headquarters in Aichtal near Stuttgart,<br />

we have numerous subsidi aries,<br />

production facilities, branches and dealers<br />

all over the world.<br />

That’s getting close to your customers!<br />

It’s only though them that we can really<br />

stay in touch with the requirements of individual<br />

markets.<br />

22 BP 4200 GB Pakistan, BP Peru, 4200 GB Philippines, Poland, Portugal, Romania, Saudi Arabia, Sweden, Switzerland, Singapore, Slovakia, 23Spain,<br />

Syria,<br />

Taiwan, Thailand, Czech Republic, Turkey, Tunisia, Ukraine, Uruguay, USA, Venezuela, United Arab Emirates, Vietnam, Cyprus.<br />

Boom test<br />

area<br />

We’re there, wherever<br />

you are in the world<br />

<strong>Putzmeister</strong> products are used in<br />

more than 150 countries worldwide<br />

China: <strong>Putzmeister</strong> Shanghai, Machinery Shanghai Co. / Shanghai · Japan: <strong>Putzmeister</strong><br />

Japan / Tokyo · Korea: <strong>Putzmeister</strong> Korea / Seoul · South Africa: <strong>Putzmeister</strong> South<br />

Africa / Johannesburg · USA: <strong>Putzmeister</strong> America / Racine, Milwaukee · Tur-<br />

key: <strong>Putzmeister</strong> Makina San / Cerkezköy · India: <strong>Putzmeister</strong> India / Goa · Italy:<br />

<strong>Putzmeister</strong> Italia / San Clemente ·<br />

UK: <strong>Putzmeister</strong> UK / Chesterfi eld ·<br />

Spain: <strong>Putzmeister</strong> Ibérica / Madrid · France: <strong>Putzmeister</strong> France / Vert Saint Denis ·<br />

Russia: <strong>Putzmeister</strong> RUS / Moscow · Germany:<br />

<strong>Putzmeister</strong> <strong>Concrete</strong> Pumps GmbH in Aichtal<br />

· Branches in Berlin-Basdorf, Hamburg-Seeve-<br />

53<br />

tal, Essen-Kettwig, Munich-Eching, Gera-Kor- bussen, Frankfurt-Gründau · Other international<br />

representatives in Egypt, Algeria, Argenti- na, Australia, Bahrain, Belgium, Brazil, Bolivia,<br />

Bulgaria, Chile, China, Costa Rica, Denmark, Ecuador, El Salvador, Finland, Ghana, Greece,<br />

Guatemala, CIS, Hong Kong, India, Indonesia, Iran, Italy, Japan, Yemen, Jordan, former Yugoslavia, Canada, Qatar, Columbia, Ko-<br />

rea, Cuba, Kuwait, Lebanon, Luxembourg, Malaysia, Malta, Mauritius, Mexico, New Zealand, Netherlands, Norway, Austria, Oman,<br />

54<br />

52<br />

55


The <strong>Putzmeister</strong> Group<br />

<strong>Concrete</strong> <strong>Technology</strong> PCT · Mortar <strong>Technology</strong> PMT<br />

Pipe <strong>Technology</strong> PPT · Water <strong>Technology</strong> PWT<br />

Industrial <strong>Technology</strong> PIT · Belt <strong>Technology</strong> PBT<br />

Underground <strong>Technology</strong> PUC<br />

BP 4200 GB<br />

Right to make technical amendments reserved<br />

© by <strong>Putzmeister</strong> <strong>Concrete</strong> Pumps GmbH 2010<br />

All rights reserved<br />

Printed in Germany (2100 Sc)<br />

<strong>Putzmeister</strong> <strong>Concrete</strong> Pumps GmbH<br />

Max-Eyth-Str. 10 · 2 31 Aichtal/Germany<br />

P.O.Box 21 52 · 2 29 Aichtal/Germany<br />

Tel. +49 ( 1 2 ) 599-0 · Fax +49 ( 1 2 ) 599-520<br />

E-mail: pmw@pmw.de · www.putzmeister.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!