On site On site<br />
Five MXKD 50 at a major nuclear power<br />
plant construction site in central Russia<br />
Five <strong>of</strong> the largest stationary <strong>boom</strong>s in the<br />
world – <strong>Putzmeister</strong> MXKD 50 – are taking<br />
part in the construction <strong>of</strong> the Novovoronezh<br />
NPP-2 nuclear power plant on the banks <strong>of</strong><br />
the Don river. At the end <strong>of</strong> 2009, <strong>Putzmeister</strong><br />
was awarded a contract to provide the equipment<br />
for concrete distribution at the reactor<br />
block: Five placing <strong>boom</strong>s with a horizontal<br />
reach <strong>of</strong> 50 m (fi tted on Manitowoc/Potain lattice<br />
towers up 50 m tall), two BSA 2110 HP-D<br />
stationary concrete pumps and a 300 m<br />
ZX 125 delivery line.<br />
At the start <strong>of</strong> 2010 and on a total <strong>of</strong> 10<br />
tautliners (trucks that have a sliding curtain<br />
for crane loading), the disassembled <strong>boom</strong>s<br />
travelled from the factory in Gründau to<br />
<strong>Putzmeister</strong>‘s Russian headquarters in Moscow.<br />
From there, the <strong>boom</strong>s travelled on to<br />
the site <strong>of</strong> use, approx. 500 km further south<br />
in Novovoronezh. n<br />
Technical data MXKD 50<br />
Number <strong>of</strong> arms 4<br />
Folding type Roll fold<br />
Horizontal reach 49.9 m gross<br />
Reach depth 39.2 m<br />
Vertical reach 46.5 m<br />
Weight 37,550 kg<br />
p Disassembled and loaded: A total <strong>of</strong> ten trucks rolled on to Russia<br />
15<br />
p Autumn 010: Technicians from <strong>Putzmeister</strong> RUS travelled from Moscow and<br />
are currently installing the concreting equipment at the huge construction site.<br />
Novovoronezh-II-1<br />
q With a horizontal reach <strong>of</strong> almost 50 m, the MXKD 50 is the largest stationary <strong>boom</strong> in the world on site<br />
16 17<br />
Reactor type WWER-1200 (AES 2006)<br />
Power 1,085 MW (net)<br />
1,170 MW (gross)<br />
Start <strong>of</strong> construction 20.06.2007<br />
Commissioning planned for 31.12.2012<br />
Operator Rosenergoatom<br />