12.07.2015 Views

view D60253 operations manual - AvionTEq

view D60253 operations manual - AvionTEq

view D60253 operations manual - AvionTEq

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Penny/Gilesh:,')' ",' '\~;o!jj{l'if,H[~~,t(':i~·t~~!i':'l:;',\t·...,.., " :~::f 7Avionics SystemsDivision9.0 PIPE CONNECTIONS9.1 AIRSPEED INDICATOR CALIBRATION CHECKS.Always connect both UP" and US" lines, to unit under test, toensure accurate results.9.2 ALTIMETER CALIBRATION CHECKSConnect US" pipe to unit under test and UP" to a volume ofapproximately one litre.NOTE: Alternatively, UP" may be sealed with a suitableblanking plug. However, this might give rise toAirspeed out-of-range conditions during Measure-Only­Mode use.9.3 VSI CALIBRATIONConnections as for altimeter.19 May 1989Rev: 1 10 Dec 1990PUB 121Page 53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!