12.07.2015 Views

Anglo American Annual Report 2012

Anglo American Annual Report 2012

Anglo American Annual Report 2012

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

production targeted to begin in 2016.A pre-feasibility study for expansionby adding a second longwall atGrosvenor is under way.Quellaveco is a greenfield copperproject in the Moquegua region ofsouthern Peru that has the potentialto produce 225,000 tpa of copperfrom an open pit over a mine life ofapproximately 28 years. The projectis expected to operate in the lowerhalf of the cash operating cost curve,SELECTED MAJOR PROJECTSbenefiting from attractive oregrades, low waste stripping andmolybdenum by-product production.<strong>Anglo</strong> <strong>American</strong> completed thefeasibility study for the project in late2010, and took the decision to suspendprogress in order to engage moreactively with the local communitiesthrough a formal dialogue tableprocess, following requests from localstakeholders. The dialogue processreached agreement in early July<strong>2012</strong> in relation to water usage,environmental responsibility and<strong>Anglo</strong> <strong>American</strong>’s social contributionover the life of the mine, and has beenheld as a model for stakeholderengagement in Peru. The projectreceived three critical permits duringthe fourth quarter of <strong>2012</strong> and<strong>Anglo</strong> <strong>American</strong> is targetingsubmission to the Board for approvalin 2013.Operating and financial reviewApprovedFirstproductiondateFullproductiondate Capex $ bn (1) Production volume (2)Sector Project CountryGreenfield (G)/Brownfield (B)Iron Ore and Manganese Minas-Rio Phase 1 Brazil G 2014 2016 8.8 (3) 26.5 Mtpa iron oreGroote Eylandt Expansion Project Australia B 2013 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!