12.07.2015 Views

Proline Promass 83E/F/O Operation Manual - FMC Technologies

Proline Promass 83E/F/O Operation Manual - FMC Technologies

Proline Promass 83E/F/O Operation Manual - FMC Technologies

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wiring <strong>Proline</strong> <strong>Promass</strong> 834.4 Post-connection checkPerform the following checks after completing electrical installation of the measuring device:Device condition and specificationsNotesAre cables or the device damaged (visual inspection)? -Electrical connectionDoes the supply voltage match the specifications on the nameplate?Notes85 to 260 V AC (45 to 65 Hz)20 to 55 V AC (45 to 65 Hz)16 to 62 V DCDo the cables comply with the specifications? ä 27Do the cables have adequate strain relief? -Cables correctly segregated by type?Without loops and crossovers?Are the power supply and signal cables correctly connected?-See the wiring diagram insidethe cover of the terminalcompartmentAre all screw terminals firmly tightened? -Are all cable entries installed, firmly tightened and correctly sealed?Cables looped as "water traps"?ä 31Are all housing covers installed and firmly tightened? -Page 32 • MN0M022Issue/Rev. 0.2 (12/12)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!