12.07.2015 Views

Proline Promass 83E/F/O Operation Manual - FMC Technologies

Proline Promass 83E/F/O Operation Manual - FMC Technologies

Proline Promass 83E/F/O Operation Manual - FMC Technologies

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installation <strong>Proline</strong> <strong>Promass</strong> 83Installation in control panel1. Prepare the opening in the panel as illustrated in the diagram.2. Slide the housing into the opening in the panel from the front.3. Screw the fasteners onto the wall-mount housing.4. Screw threaded rods into holders and tighten until the housing is solidly seated on the panelwall. Afterwards, tighten the locking nuts.Additional support is not necessary.+0.5 (+0.019)–0.5 (–0.019)210 (8.27)245 (9.65)+0.5 (+0.019)–0.5 (–0.019)Fig. 18:mm (inch)Panel installation (wall-mount housing)~110 (~4.33)a0001131"Caution!Pipe mountingThe assembly should be performed by following the instructions in the diagram.If a warm pipe is used for installation, make sure thatthe housing temperature does not exceed the max. permitted value of +60 °C (+140 °F).Ø 20…70(Ø 0.79…2.75)~ 155 ( ~ 6.1)mm (inch)Fig. 19:Pipe mounting (wall-mount housing)a0001132Page 24 • MN0M022Issue/Rev. 0.2 (12/12)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!