FORPrepared forGovernment of India
- Page 4 and 5:
Table of Contents3.5.2 Tannery effl
- Page 6 and 7:
Table of ContentsLIST OF FIGURESFig
- Page 9:
AcronymsIUEkglLDARLCALTLm 2mg/m³mg
- Page 12 and 13:
protocol/ related regulations/ and
- Page 14 and 15:
IntroductionOperational issues1.1 P
- Page 16 and 17:
Introductionfor 27 industrial and r
- Page 18 and 19:
Conceptual Facets of EIA2.2 Polluti
- Page 20 and 21:
Conceptual Facets of EIABench marki
- Page 22 and 23:
Conceptual Facets of EIAproduct aft
- Page 24 and 25:
Conceptual Facets of EIA2.3.2.8 4-R
- Page 26 and 27:
Conceptual Facets of EIAR&D activit
- Page 28 and 29:
Conceptual Facets of EIAProject lev
- Page 30 and 31:
Conceptual Facets of EIAThis practi
- Page 32 and 33:
Conceptual Facets of EIAother effec
- Page 34 and 35: Conceptual Facets of EIApractitione
- Page 36 and 37: Leather / Skin / Hide Processing In
- Page 38 and 39: Leather / Skin / Hide Processing In
- Page 40 and 41: Leather / Skin / Hide Processing In
- Page 42 and 43: Leather / Skin / Hide Processing In
- Page 44 and 45: Leather / Skin / Hide Processing In
- Page 46 and 47: Leather / Skin / Hide Processing In
- Page 48 and 49: Leather / Skin / Hide Processing In
- Page 50 and 51: Leather / Skin / Hide Processing In
- Page 52 and 53: Leather / Skin / Hide Processing In
- Page 54 and 55: Leather / Skin / Hide Processing In
- Page 56 and 57: Leather / Skin / Hide Processing In
- Page 58 and 59: Leather / Skin / Hide Processing In
- Page 60 and 61: Leather / Skin / Hide Processing In
- Page 62 and 63: Leather / Skin / Hide Processing In
- Page 64 and 65: 4.OPERATIONAL ASPECTS OF EIAPrior e
- Page 66 and 67: Operational Aspects of EIAFigure 4-
- Page 68 and 69: Operational Aspects of EIA4.2 Scree
- Page 70 and 71: Operational Aspects of EIA4.2.4 Sit
- Page 72 and 73: Operational Aspects of EIA−−−
- Page 74 and 75: Operational Aspects of EIAfor furth
- Page 76 and 77: Operational Aspects of EIATable 4-2
- Page 78 and 79: Operational Aspects of EIAPHASE IPR
- Page 80 and 81: Operational Aspects of EIADetails o
- Page 82 and 83: Operational Aspects of EIAIf the lo
- Page 86 and 87: Operational Aspects of EIA4.4.2.3 B
- Page 88 and 89: Operational Aspects of EIA4.4.3 Imp
- Page 90 and 91: Operational Aspects of EIALegislati
- Page 92 and 93: Operational Aspects of EIAtime, if
- Page 94 and 95: Operational Aspects of EIAImportant
- Page 96 and 97: Operational Aspects of EIABiologica
- Page 98 and 99: Operational Aspects of EIAS. NO EIA
- Page 100 and 101: Operational Aspects of EIAConcerned
- Page 102 and 103: Operational Aspects of EIAFinal EIA
- Page 104 and 105: Operational Aspects of EIAIf the Au
- Page 106 and 107: 5.STAKEHOLDERS’ ROLES ANDRESPONSI
- Page 108 and 109: Stakeholders’ Roles and Responsib
- Page 110 and 111: Stakeholders’ Roles and Responsib
- Page 112 and 113: Stakeholders’ Roles and Responsib
- Page 114 and 115: Stakeholders’ Roles and Responsib
- Page 116 and 117: ANNEXURE IGeneral Standards for Dis
- Page 118 and 119: 18. Hexavalent chromium (as Cr+6) m
- Page 120 and 121: 2. The user should make efforts to
- Page 122 and 123: ANNEXURE IIForm 1 (Application for
- Page 124 and 125: 1.6 Demolition works?1.7 Temporary
- Page 126 and 127: 3. Use, storage, transport, handlin
- Page 128 and 129: 5.6 Emissions from incineration of
- Page 130 and 131: 9. Factors which should be consider
- Page 132 and 133: ANNEXURE IIICritically Polluted Ind
- Page 134 and 135:
8 Vellore (North Arcot) (TamilNadu)
- Page 136 and 137:
31 Pali (Rajasthan)CEPI-73.73 (As_W
- Page 138 and 139:
TYPES OF MONITORING AND NETWORK DES
- Page 140 and 141:
knowledge of the sources of the pro
- Page 142 and 143:
GUIDANCE FOR ASSESSMENT OF BASELINE
- Page 144 and 145:
AttributesSamplingMeasurement Metho
- Page 146 and 147:
AttributesSamplingMeasurement Metho
- Page 148 and 149:
ANNEXURE VISources of Secondary Dat
- Page 150 and 151:
Information8. Nature of Terrain, to
- Page 152 and 153:
Annexure IVB: Summary of Available
- Page 154 and 155:
13. Department of Ocean Development
- Page 156 and 157:
19. Indian Meteorology Department S
- Page 158 and 159:
32. National Botanical Research Ins
- Page 160 and 161:
ANNEXURE VIIForm through which the
- Page 162 and 163:
ANNEXURE VIIIComposition of EAC/SEA
- Page 164 and 165:
___________________________________
- Page 166 and 167:
I)Primary treatment is the first st
- Page 168 and 169:
compounds degraded in step 1) and t
- Page 170 and 171:
New Machineries:These are a few pho
- Page 172 and 173:
REFERENCESMinistry of Environment a
- Page 174:
IL&FS Ecosmart LimitedFlat # 408, S