12.07.2015 Views

Leather/Skin/Hide Processing Industry - Environmental Clearance

Leather/Skin/Hide Processing Industry - Environmental Clearance

Leather/Skin/Hide Processing Industry - Environmental Clearance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operational Aspects of EIAConcerned regulatory Authority (MoEF/SEIAA/UTEIA) shall display the summaryof EIA report on its website and also make full draft EIA report available forreference at a notified place during normal office hours at their head office.SPCB/UTPCC concerned shall also make similar arrangements for giving publicityabout the project within the State/UT and make available the summary of draft EIAreport for inspection in select offices, public libraries or any other suitable location,etc. They shall also additionally make available, a copy of the draft EIA report to thefive authorities/offices as mentioned above.The Member-Secretary of the concerned SPCB or UTPCC shall finalize the date,time and exact venue for the conduct of public hearing within seven days of the dateof the receipt of the draft EIA report from the project proponent and advertise thesame in one major National Daily and one Regional vernacular Daily/official Statelanguage.A minimum notice period of 30 (thirty) days shall be provided to the public forfurnishing their responses.No postponement of the date, time, venue of the public hearing shall be undertaken,unless some untoward emergency situation occurs. Only in case of emergencies, andup on recommendation of the concerned District Magistrate/District Collector/DeputyCommissioner, the postponement shall be notified to the public through the sameNational and Regional vernacular dailies and also prominently displayed at all theidentified offices by the concerned SPCB or UTPCC In the above exceptional circumstances fresh date, time and venue for the publicconsultation shall be decided by the Member–Secretary of the concerned SPCB orUTPCC only in consultation with the District Magistrate/District Collector/DeputyCommissioner and notified afresh as per the procedure.The District Magistrate/District Collector/Deputy Commissioner or his or herrepresentative not below the rank of an Additional District Magistrate assisted by arepresentative of SPCB/UTPCC, shall supervise and preside over the entire publichearing process.The SPCB or UTPCC shall arrange to video film the entire proceedings. A copy ofthe videotape or a CD shall be enclosed with the public hearing proceedings whileforwarding it to the Regulatory Authority concerned.The attendance of all those who are present at the venue shall be noted and annexedwith the final proceedingsThere shall be no quorum required for attendance for starting the proceedingsPersons present at the venue shall be granted the opportunity to seek information orclarifications on the project from the proponent. The summary of the public hearingproceedings accurately reflecting all the views and concerns expressed shall berecorded by the representative of the SPCB/UTPCC and read over to the audience atthe end of the proceedings explaining the contents in the local/vernacular languageand the agreed minutes shall be signed by the District Magistrate/DistrictCollector/Deputy Commissioner (s) or his or her representative on the same day andforwarded to the SPCB/UTPCC concerned.A statement of the issues raised by the public and the comments of the proponentshall also be prepared in the local language or the official State language, as the casemay be and in English and annexed to the proceedings.TGM for Tanneries August 20104-37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!