12.07.2015 Views

A. General 1. Scope of Bid 2. Source of Funds 3. Corrupt, Fraudulent ...

A. General 1. Scope of Bid 2. Source of Funds 3. Corrupt, Fraudulent ...

A. General 1. Scope of Bid 2. Source of Funds 3. Corrupt, Fraudulent ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Instructions to <strong>Bid</strong>ders28.4. Based on the detailed evaluation <strong>of</strong> bids, those that comply with the abovementionedrequirements shall be ranked in the ascending order <strong>of</strong> their totalcalculated bid prices, as evaluated and corrected for computational errors,discounts and other modifications, to identify the Lowest Calculated <strong>Bid</strong>.Total calculated bid prices, as evaluated and corrected for computationalerrors, discounts and other modifications, which exceed the ABC shall not beconsidered.28.5. Unless otherwise indicated in the BDS, the Procuring Entity’s evaluation <strong>of</strong>bids shall only be based on the bid price quoted in the Financial <strong>Bid</strong> Form.28.6. <strong>Bid</strong>s shall be evaluated on an equal footing to ensure fair competition. Forthis purpose, all bidders shall be required to include in their bids the cost <strong>of</strong> alltaxes, such as, but not limited to, value added tax (VAT), income tax, localtaxes, and other fiscal levies and duties which shall be itemized in the bid formand reflected in the detailed estimates. Such bids, including said taxes, shallbe the basis for bid evaluation and comparison.29. Post-Qualification29.<strong>1.</strong> The Procuring Entity shall determine to its satisfaction whether the <strong>Bid</strong>der thatis evaluated as having submitted the Lowest Calculated <strong>Bid</strong> (LCB) complieswith and is responsive to all the requirements and conditions specified in ITBClauses 5, 12, and 1<strong>3.</strong>29.<strong>2.</strong> Within a non-extendible period <strong>of</strong> three (3) calendar days from receipt by thebidder <strong>of</strong> the notice from the BAC that it submitted the LCB, the <strong>Bid</strong>der shallsubmit the following documentary requirements:(a) Tax clearance per Executive Order 398, Series <strong>of</strong> 2005;(b) Latest income and business tax returns in the form specified in theBDS;(c)(d)Certificate <strong>of</strong> PhilGEPS Registration; andOther appropriate licenses and permits required by law and stated inthe BDS.Failure <strong>of</strong> the <strong>Bid</strong>der declared as Lowest Calculated <strong>Bid</strong> to duly submit therequirements under this Clause or a finding against the veracity <strong>of</strong> such shallbe ground for forfeiture <strong>of</strong> the bid security and disqualification <strong>of</strong> the <strong>Bid</strong>derfor award.29.<strong>3.</strong> The determination shall be based upon an examination <strong>of</strong> the documentaryevidence <strong>of</strong> the <strong>Bid</strong>der’s qualifications submitted pursuant to ITB Clauses 12and 13, as well as other information as the Procuring Entity deems necessaryand appropriate, using a non-discretionary “pass/fail” criterion.29.4. If the BAC determines that the <strong>Bid</strong>der with the Lowest Calculated <strong>Bid</strong> passesall the criteria for post-qualification, it shall declare the said bid as the LowestCalculated Responsive <strong>Bid</strong>, and recommend to the Head <strong>of</strong> the ProcuringEntity the award <strong>of</strong> contract to the said <strong>Bid</strong>der at its submitted price or itscalculated bid price, whichever is lower.29.5. A negative determination shall result in rejection <strong>of</strong> the <strong>Bid</strong>der’s <strong>Bid</strong>, in whichevent the Procuring Entity shall proceed to the next Lowest Calculated <strong>Bid</strong> tomake a similar determination <strong>of</strong> that <strong>Bid</strong>der’s capabilities to performsatisfactorily. If the second <strong>Bid</strong>der, however, fails the post qualification, theprocedure for post qualification shall be repeated for the <strong>Bid</strong>der with the nextPage 17 <strong>of</strong> 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!