Tree Removal Permit - The Township of South Orange Village
Tree Removal Permit - The Township of South Orange Village
Tree Removal Permit - The Township of South Orange Village
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Township</strong> <strong>of</strong> <strong>South</strong> <strong>Orange</strong> <strong>Village</strong>101 <strong>South</strong> <strong>Orange</strong> Avenue, <strong>South</strong> <strong>Orange</strong>, N.J. 07079<strong>Village</strong> Hall (973) 378-7715Fax (973) 761-4357Email:srenda@southorange.orgEmail:egulyas@southorange.orgEngineering & Zoning Office(973) 378-7715 ext. 7706TREE REMOVAL PERMITNOTE: No person, corporation or entity shall remove or destroy any tree without first obtaining a<strong>Tree</strong> <strong>Removal</strong> <strong>Permit</strong> from the <strong>Township</strong> <strong>of</strong> <strong>South</strong> <strong>Orange</strong> <strong>Village</strong>.RECEIVED BY: __________________DATE: _____________COMPLETE APPLICATION FORM & RETURN TO THE ZONING OFFICE1. Name(s), Address & Phone Number <strong>of</strong> Owner(s) <strong>of</strong> lands upon which the tree(s) are located:______________________________________________________________________________________________________________________________________________________2. Name(s), Address & Phone Number <strong>of</strong> the person, corporation or entity applying for the permit toremove the trees (Contractor):____________________________________________________________________________3. Type <strong>of</strong> <strong>Tree</strong>(s) to be Removed___________________________________________________4. Diameter(s) <strong>of</strong> trees to be Removed________________________________________________5. Location(s) <strong>of</strong> trees to be Removed – (May be required to be shown on a survey)____________6. Reason(s) for <strong>Removal</strong>__________________________________________________________7. Lot Size______________________________________________________________________-If lot size is less than ½ acre, NO permit fee or tree replacement is required.-If lot size is equal to or greater than ½ acre, permit fee and tree replacement(s) are required.For every tree removed, one must be planted on the same lot or pay the necessary costs for thesame to the <strong>Village</strong> Replacement <strong>Tree</strong> Fund. See note below for the list <strong>of</strong> trees.___________________________________________________________________________SIGNATURE OF OWNER(S) CONSENTING TO APPLICATION ADDRESS DATE___________________________________________________________________________SIGNATURE OF OWNER(S) CONSENTING TO APPLICATION ADDRESS DATE(IF TREE(S) ARE ON THE PROPERTY LINE, BOTH PROPERTY OWNERS ARE TO CONSENT)Page 1 <strong>of</strong> 2
<strong>Permit</strong> is valid for 6 months from Date <strong>of</strong> Issuance1. A list <strong>of</strong> trees that could be planted on the property can be obtained from the websiteCh 149.30 or from this <strong>of</strong>fice. <strong>The</strong> property owner has one year from the date <strong>of</strong> this letter tocomply with the tree replacement requirement. This <strong>of</strong>fice shall be notified once the new treeshave been planted.2. Additional information can be obtained from the www.<strong>South</strong><strong>Orange</strong>.org website under the‘Government’ pull down to ‘<strong>Village</strong> Code Online’ under Chapter 149-20 ‘Shade <strong>Tree</strong>s’.3. Failure to obtain a permit can result in a fine <strong>of</strong> up to $1000.See Ch.§ 1-20. General penalty.Office Use OnlyIf Lot Size is Less than ½ Acre: No Fee or <strong>Tree</strong> Replacement Required: No <strong>Tree</strong> <strong>Permit</strong> Required____________________________________________________________________________________________________________________________________________If Lot Size is equal to or greater than ½ Acre: Fee & <strong>Tree</strong>(s) Replacement Required: <strong>Tree</strong> <strong>Permit</strong> - PERMITTED Declared to be an Immediate Threat (NO FEE) Show Location <strong>of</strong> tree(s) to be planted on the survey or Pay costs to the <strong>Village</strong> Replacement <strong>Tree</strong> Fund <strong>Tree</strong> <strong>Permit</strong> – DENIEDDate: __________________________________________________________________________________________________________________________________________________________________________________________Salvatore Renda, <strong>Village</strong> Engineer & Zoning OfficerPage 2 <strong>of</strong> 2