Project Status
Project Status Project Status
Costs1 Jan 2012 - 31 Dec 2015Total resources required: 90.1 M€WPCs: 62.6 M€ (70%)SPO: 27.5 M€ (30%)SPO staff: 19.3 M€office infrastructure & operational costs: 8.2 M€100k€/py assumedNo institute overhead includedNo explicit contingency included“Embedded” SPDO staff in POs
Site selection‣Physical requirementsExtremely radio quiet environmentAt least 3000 km in extentLow ionospheric turbulenceLow tropospheric turbulence‣Two candidates short-listed in 2006‣Site selection process2010 2011 2012Site characterisationRFI measurementsin progress
- Page 1 and 2: Welcome and overview of theproject
- Page 3 and 4: Project Phases2009 2010 2011 2012 2
- Page 5 and 6: Goals of the Pre-Construction Phase
- Page 7 and 8: Expected management structure in 20
- Page 9 and 10: Work Packages1. Management2. System
- Page 11: Assignment of Work Packages (2)2.
- Page 15 and 16: Tropospheric phase monitoring equip
- Page 17: Top level schedule for the SKATechn
Costs1 Jan 2012 - 31 Dec 2015Total resources required: 90.1 M€WPCs: 62.6 M€ (70%)SPO: 27.5 M€ (30%)SPO staff: 19.3 M€office infrastructure & operational costs: 8.2 M€100k€/py assumedNo institute overhead includedNo explicit contingency included“Embedded” SPDO staff in POs