- Page 1 and 2: Prefabricated Construction Systems
- Page 3 and 4: Development and Application (contin
- Page 5 and 6: Prefabricated ConstructionThe basic
- Page 7 and 8: High quality precastelements can be
- Page 9 and 10: Prefabricated ConstructionContinue
- Page 11 and 12: Limitation and drawback in using pr
- Page 13 and 14: Provision for the forming of arigid
- Page 15 and 16: Precast elementsrequired huge amoun
- Page 17 and 18: Transportation, access andlifting p
- Page 19 and 20: Connecting precast elements1. Conne
- Page 21 and 22: Connecting columnto base (similar f
- Page 23 and 24: Beams rest oncorbel of column(with
- Page 25 and 26: Haunchingarrangement toconnect beam
- Page 27 and 28: Case Examples
- Page 29 and 30: First generation of HarmonyBlock us
- Page 31: After-fix façade system requiredth
- Page 35 and 36: Public houses using Concorddesign w
- Page 37 and 38: Other pioneered projects in theearl
- Page 39 and 40: Forming the floor slab using precas
- Page 41 and 42: Introduction of prefabricatedconcep
- Page 43 and 44: Layout of the quarter building show
- Page 45 and 46: Detail of the façade andthe lintel
- Page 47 and 48: Construction of special buildingsus
- Page 49 and 50: Forming of the castin-situmain beam
- Page 51 and 52: Semi-slab with RCtopping to form th
- Page 53 and 54: Erecting of the building frameusing
- Page 55 and 56: Placing the secondary beamsonto the
- Page 57 and 58: Detail of the beam/columnand beam/b
- Page 59 and 60: Residential developmentat Cyber Por
- Page 61 and 62: Features in the construction -large
- Page 63 and 64: Residential Developmentat Taikoo Va
- Page 65 and 66: Detail of the loss-form
- Page 67 and 68: Overview of the precastinstallation
- Page 69 and 70: Cambridge House - a 42-storeyOffice
- Page 71 and 72: Placing of the precast beam trought
- Page 73 and 74: Future Trend in the application ofP
- Page 75 and 76: Examples of very congestedconstruct
- Page 77 and 78: The Integer Houseat Admiralty
- Page 79 and 80: The working concept
- Page 81 and 82: Assembly of the 3-D modules
- Page 83 and 84:
Example of Innovative Project (over
- Page 85 and 86:
Habitat 67 as seen along the bank o
- Page 87:
Close up look of the modulated dwel
- Page 90 and 91:
Forming and Installation ofthe modu
- Page 92 and 93:
BuildingSection
- Page 94 and 95:
Connecting the modules
- Page 96 and 97:
Examples of application of prefabri
- Page 98 and 99:
Elevated pedestrianfootbridge in Mo
- Page 100 and 101:
Precast girder erectedon top of the
- Page 102 and 103:
Structural arrangementof the footbr
- Page 104 and 105:
Precast box-girder for the RamblerS
- Page 106 and 107:
West Kowloon Expressway -installing
- Page 108 and 109:
Forming the elevated trackof the We
- Page 110 and 111:
Placing the precastgirder in positi
- Page 112 and 113:
Construction of highway bridge usin
- Page 114 and 115:
Overall layout of the precasting ya
- Page 116 and 117:
Formwork to form the innervoid of t
- Page 118 and 119:
Drawing provided byChina Harbour En
- Page 120 and 121:
Installation of the box-girders
- Page 122 and 123:
Precast parapet unit for the highwa
- Page 124 and 125:
Tunnel lining formedby precast segm
- Page 126 and 127:
Forming the station platformusing p
- Page 128 and 129:
Delivery of the precast units
- Page 130 and 131:
Precast concrete plankas cover to p
- Page 132 and 133:
Forming storm water discharge culve
- Page 134 and 135:
Precast units to form the 4mhigh 5-
- Page 136 and 137:
Precast culvert in the formof semi-
- Page 138 and 139:
Positioning of the culvertsection o
- Page 140 and 141:
Precast box as footing to bridgetow
- Page 142:
End of PresentationandThank youIf y