7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong 7.2 Prefabricated Construction Systems adopted in Hong Kong

bst1.cityu.edu.hk
from bst1.cityu.edu.hk More from this publisher
12.07.2015 Views

3. Topping to form the deck/slabDeck or slab of precast structure often appears in theform of a RC topping, placed on top of the precastbeam and semi-slab (precast floor plank).Semi-slab (rebarwill be fixed ontop)

Case Examples

3. Topp<strong>in</strong>g to form the deck/slabDeck or slab of precast structure often appears <strong>in</strong> theform of a RC topp<strong>in</strong>g, placed on top of the precastbeam and semi-slab (precast floor plank).Semi-slab (rebarwill be fixed ontop)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!