12.07.2015 Views

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Drawback:TTighter and longer period of coord<strong>in</strong>ation are required toallow for structural design, construction plann<strong>in</strong>g,procurements and approval proceduresMMore time required <strong>in</strong> advance for production of precastelements until they can be accumulated to sufficientnumbers for delivery to site to start <strong>in</strong>stallation.Huge work<strong>in</strong>g space is required for the carry<strong>in</strong>g out offabrication works. This is particularly critical under <strong>Hong</strong><strong>Kong</strong> situation. Though most of the fabrication works arerecently carried out <strong>in</strong> cast<strong>in</strong>g yards <strong>in</strong> Ch<strong>in</strong>a, this will<strong>in</strong>crease the transportation cost by sea or on land.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!