Plant Details
Interesting Plant Facts• Current production rate isabout 1 MGD• Configured with 3 filtersallows maximum productionrate of 4.5 MGD• Infrastructure is in place totreat 6 MGD• 7 members on plant staffincluding the dog!
- Page 1 and 2: Start-Up Challenges at thePender Co
- Page 3 and 4: HistoryPender County needed a susta
- Page 5 and 6: Key Players▫ Pender County Utilit
- Page 7: Significant Facts• Total project
- Page 11 and 12: The 3 Big Challenges• Installing