Startup Challenges at PCU's SWTP
Startup Challenges at PCU's SWTP Startup Challenges at PCU's SWTP
Big #3: Going Live• SCADA-the alphabet test soup (UFT, WFT, ORT,FDT, PAT)• Mechanical Start-ups• Bringing the two together
Everybody In-the Road to FDT & PATPerformance Acceptance Test (30-Day Test)Functional Demonstration TestICSCCCOperational Readiness TestMechanical Start-UpWitnessed Factory Test Electrical Start-UpUnwitnessed Factory Test Mechanical Installation
- Page 1 and 2: Start-Up Challenges at thePender Co
- Page 3 and 4: HistoryPender County needed a susta
- Page 5 and 6: Key Players▫ Pender County Utilit
- Page 7 and 8: Significant Facts• Total project
- Page 9 and 10: Interesting Plant Facts• Current
- Page 11 and 12: The 3 Big Challenges• Installing
- Page 13 and 14: Water Supply• No available water
- Page 15 and 16: Timing is Everything!
- Page 17 and 18: Where Does the Water Come From?
- Page 19: Keep it Hot!• It was important to
- Page 23: Questions?
Big #3: Going Live• SCADA-the alphabet test soup (UFT, WFT, ORT,FDT, PAT)• Mechanical Start-ups• Bringing the two together