Startup Challenges at PCU's SWTP
Startup Challenges at PCU's SWTP
Startup Challenges at PCU's SWTP
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Interesting Construction Facts• 6500 CYD concrete, 500 tons rebar, 26 tons ofcopper, and over 2000 electrical termin<strong>at</strong>ions• Clearwell 2 was selected as a bid altern<strong>at</strong>e• Ammonium Sulf<strong>at</strong>e and HFS feed systems inplace for the future