12.07.2015 Views

Great Lakes Restoration Project - Ohio Department of Natural ...

Great Lakes Restoration Project - Ohio Department of Natural ...

Great Lakes Restoration Project - Ohio Department of Natural ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong> name.Grantee.Grant amount/total project cost.Brief description.Lake CountyHoosier Prairie NaturePreserve, Savanna<strong>Restoration</strong>.Indiana <strong>Department</strong> <strong>of</strong> <strong>Natural</strong>Resources (IDNR) Division <strong>of</strong>Nature Preserves.$98,790/$124,204.Reduce invasive species and oakresprouts to restore 70 acres <strong>of</strong>native savanna and prairie.Clark and Pine East (Bongi)Dune and Swale <strong>Restoration</strong>.IDNR Division <strong>of</strong> NaturePreserves.$100,000/$125,000.Restore 37 acres <strong>of</strong> dune andswale by eliminating invasivewoody species and reducingcover and shrub/tree stemdensity.Indiana <strong>Great</strong> <strong>Lakes</strong> <strong>Restoration</strong> <strong>Project</strong>sDeep River HeadwatersSavanna, Wetland and Prairie<strong>Restoration</strong> <strong>Project</strong>.Lake County Parks andRecreation <strong>Department</strong>.$100,000/$125,000.Restore 100 acres <strong>of</strong> degradedsavanna and agricultural fields tonative habitat conditions.Hammond Bird Sanctuary<strong>Restoration</strong> Phase I.City <strong>of</strong> Hammond Parks<strong>Department</strong>.$100,000/$125,000.Restore a section <strong>of</strong> a 9.25-acremigrant bird sanctuary located onthe shores <strong>of</strong> Lake Michigan.Gary Green Link.City <strong>of</strong> Gary.$100,000/$125,000.Create a master plan for naturalresources management withinthe boundaries <strong>of</strong> a 30-milegreenway corridor.Grand Boulevard Lake<strong>Restoration</strong> andEnhancement.City <strong>of</strong> Lake Station.$100,000/$125,000.Remove exotic species andimprove public access foran urban lake.Porter CountyWetland <strong>Restoration</strong> in theDunes Creek Watershed.IDNR Division <strong>of</strong> State Parksand Reservoirs.$100,000/$125,000.Restore wetland habitat andevaluate its efficacy in reducingloadings <strong>of</strong> e.coli into IndianaDunes State Park beaches onLake Michigan.Moraine Nature PreserveProtection.IDNR Division <strong>of</strong> NaturePreserves.$106,170/$274,500.Acquire 42 acres <strong>of</strong> land adjacentto Moraine Nature Preserve.<strong>Restoration</strong> <strong>of</strong> Samuelson Fenand the Salt Creek Corridor atImagination Glen Park.City <strong>of</strong> Portage Parks andRecreation <strong>Department</strong>.$100,000/$125,000.Restore and enhance naturalcommunities associated withSalt Creek.Stimson Drain StormwaterManagement Design <strong>Project</strong>.City <strong>of</strong> Valparaiso.$100,000/$125,000.Produce a stormwatermanagement design that willpromote best managementpractices in a 600-acre StimsonDrain Watershed.Porter County Jail AlternativeStormwater ManagementDemonstration <strong>Project</strong>.City <strong>of</strong> Valparaiso.$100,000/$125,000.Reduce and manage impacts <strong>of</strong>stormwater on Stimson Drainwatershed through an on-sitedemonstration project.Phase 2b Creekside ParkDevelopment: Park Passages.City <strong>of</strong> Valparaiso Parks andRecreation.$100,000/$125,000.Develop trails and anenvironmental management planfor a 70-acre undeveloped parkand restore and maintain nativeupland habitat, wetlands, fensand the Salt Creek corridor (asalmonid stream).Phase 2c Creekside ParkDevelopment: Connectionsand <strong>Restoration</strong>.City <strong>of</strong> Valparaiso Parks andRecreation.$100,000/$125,000.Restore up to 40 acres withnative vegetation and assist indeveloping boardwalks and abridge.LaPorte CountyCreek Ridge County ParkProtection.LaPorte County Parks andRecreation Board.$85,000/$110,000.Acquire 35.6 acres <strong>of</strong> landadjacent to an existing parkincluding a salmonid stream.Trail Creek Forks <strong>Restoration</strong>.IDNR Division <strong>of</strong> Fish andWildlife.$63,760/$85,558.Stabilize and restore erodingstream banks in Trail Creek, asalmonid stream.Red Mill County Park Wetland<strong>Restoration</strong>.LaPorte County Parks andRecreation <strong>Department</strong> andFoundation.$100,000/$130,550.Develop an engineeringfeasibility study and design torecommend the best method toremove the existing dam andrestore wetlands.White Ditch Greenway:Phase I.Town <strong>of</strong> Michiana Shores.$41,496/$52,525.Acquire 52 acres along WhiteDitch to become a greenwaypark.RegionalStudy <strong>of</strong> Rare andEndangered Mammals inNorthern Lake, Porter andLaPorte Counties.Indiana State University.$67,283/$85,483.Survey various endangeredmammals in the Indiana Coastalregion.GREAT LAKES RESTORATION PROJECT [ 5]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!