12.07.2015 Views

Great Lakes Restoration Project - Ohio Department of Natural ...

Great Lakes Restoration Project - Ohio Department of Natural ...

Great Lakes Restoration Project - Ohio Department of Natural ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Minnesota <strong>Great</strong> <strong>Lakes</strong> <strong>Restoration</strong> <strong>Project</strong>s<strong>Project</strong> name.Grantee.Grant amount/total project cost.Brief description.Cook CountyGrand Marais StormwaterManagement – ErosionControl <strong>Restoration</strong> inCreechville Area.County <strong>of</strong> Cook.$213,120/$284,220.Reduce erosion and preventsediment from entering LakeSuperior.Grand Marais and CookCounty StormwaterManagement Plan – WaterQuality & Quantity Monitoring.County <strong>of</strong> Cook.$10,500/$14,000.Provide baseline information toevaluate implementation <strong>of</strong> planand to reduce flooding.Grand Marais StormwaterManagement – ErosionControl <strong>Restoration</strong> on VillageCreek.County <strong>of</strong> Cook.$127,335/$169,780.Provide baseline information toevaluate plan and reduceflooding.Grand Marais StreambankStabilization and<strong>Natural</strong>ization.City <strong>of</strong> Grand Marais.$10,310/$14197.Restore eroding stream banks inthe popular City Park andCampground with bioengineeringmethods.Lake CountyCarriere Property Acquisitionand <strong>Restoration</strong>.Minnesota <strong>Department</strong> <strong>of</strong><strong>Natural</strong> Resources.$195,750/$446,600.Acquire, restore and protectcoastal lands.Two Harbors Old City DumpSite <strong>Restoration</strong>.City <strong>of</strong> Two Harbors.$118,980/$175,680.Remove waste from contact witha stream and correct an erosionand sedimentation problem.Detention Basin Construction– Two Harbors Storm WaterManagement Plan.City <strong>of</strong> Two Harbors.$144,000/$192,000.Reduce peak flows in SkunkCreek resulting in less erosionand sedimentation and betterwater quality entering LakeSuperior.Acquisition <strong>of</strong> LighthousePoint.City <strong>of</strong> Two Harbors.$104,230/$1,800,000.Assist the city with the purchase<strong>of</strong> a 51 acre property, home tothe Two Harbors Lighthouse,walking trails and a public boataccess.Reserve Mining Ground andSurface Water ContaminationControl.Minnesota Pollution ControlAgency.$104,230/153,000.Investigate an old scrapyard anddiesel range organics plume siteto define nature, extent andmigration <strong>of</strong> ground watercontamination threatening theCity <strong>of</strong> Silver Bay water supply.St. Louis CountyManaged Onsite WastewaterTreatment Systems in theLake Superior Basin:Outreach and Education.<strong>Natural</strong> Resources ResearchInstitute, University <strong>of</strong>Minnesota Duluth.$32,253/$40,316.Operate and monitor alternativewastewater treatmenttechnologies at a test facility.Remediation <strong>of</strong> Sargent’sCreek Dump Site.City <strong>of</strong> Duluth.$341,262/$515,000.Restore habitat at a formerneighborhood dumpsite, removewaste from contact with acoastal stream and eliminatehuman exposure.Miller Creek <strong>Restoration</strong>:Watershed Coordinator.Miller Creek Joint PowersBoard.$59,000/$68,600.Hire a watershed coordinator tomanage restoration projects.Miller Creek <strong>Restoration</strong>:Easement Acquisition.Miller Creek Joint PowersBoard.$203,000/$276,733.Protect riparian land andwetlands through purchase <strong>of</strong>conservation easements.Miller Creek <strong>Restoration</strong>:Sediment Trap.Miller Creek Joint PowersBoard.$60,000/$80,000.Remove sediment from MillerCreek through the construction <strong>of</strong>an in-stream sediment trap.GREAT LAKES RESTORATION PROJECT [ 9]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!