12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>PART 1—GENERAL1.01 SECTION REQUIREMENTSSECTION 01500 - TEMPORARY FACILITIES AND CONTROLSA. Standards: Comply with NFPA 241, "Standard for Safeguarding Construction, Alterations, andDemolition Operations"; ANSI A10 Series standards for "Safety Requirements for Constructionand Demolition"; and NECA Electrical Design Library's "Temporary Electrical Facilities."1. Electrical Service: Comply with NEMA, NECA, and UL standards and regulations fortemporary electric service. Install service to comply with NFPA 70.B. At the earliest possible time, when acceptable to Owner, change over from use of temporaryutility services to use of permanent utilities.C. Remove temporary facilities and controls before Substantial Completion. Personnel remainingafter Substantial Completion will be permitted to use permanent facilities, under conditionsacceptable to Owner.PART 2 – PRODUCTSNot usedPART 3 - EXECUTION3.01 TEMPORARY UTILITIESA. Provide temporary utility services, including electric power & lighting, water, power, fireprotection, gas & telephone to Project site for use during construction. Arrange for andcoordinate utility services with local utility companies.1. Contractor shall pay use charges for temporary utilities.B. Provide temporary heat for curing or drying of work, and for protection of new construction fromadverse effects of low temperatures. Use of gasoline-burning heaters and open-flame heaters isnot permitted.1. Maintain a minimum 50 degree F. temperature within the construction area until such timeas the permanent heating plant is installed, inspected and functional.3.02 CONSTRUCTION FACILITIESA. Provide field offices, storage trailers, and other support facilities as necessary for efficientprosecution of the Work.1. Temporary facilities located within the construction area or within 30 feet of building linesshall be of noncombustible construction.B. Contractor shall confirm with the Owner’s representative an acceptable location outside thebuilding to securely store materials and stage construction operations. Thence, the Contractorshall confine operations strictly within this area. Contractor shall keep storage and staging areaclean and neat at all times and shall not allow the accumulation of debris or trash.C. Provide temporary sanitary facilities for all construction personnel. Comply with regulations andhealth codes for type, number, location, and maintenance of facilities.D. Provide temporary enclosures for protection of construction and workers from exposure andinclement weather and for containment of heat.E. Install project identification and other signs in locations approved by Owner to inform the publicand persons seeking entrance to Project.04-27-11 TEMPORARY FACILITIES AND CONTROLS01500 -1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!