12.07.2015 Views

Terms of Reference - North Queensland Bulk Ports Corporation

Terms of Reference - North Queensland Bulk Ports Corporation

Terms of Reference - North Queensland Bulk Ports Corporation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.10. TransportPresent the transport assessment in separate reports for each project-affected mode(road, rail, sea and air) as appropriate for the construction and operation stages <strong>of</strong> theproject. These assessment reports should provide sufficient information to allow anindependent assessment <strong>of</strong> how existing transport infrastructure will be affected byproject transport at the local and regional level.5.10.1. Existing infrastructureDescribe the extent, condition, volumes and capacity <strong>of</strong> the existing transportinfrastructure on which the project will depend (refer also to Part B, Section 4.5).5.10.2. Transport tasks and routesDescribe:• expected volumes <strong>of</strong> project inputs and outputs <strong>of</strong> transported raw materials,wastes, hazardous goods and finished products for all stages <strong>of</strong> the project• how identified project inputs and outputs will be moved through the local andregional transport network (volume, composition, mode, trip timing and routes)during the construction and operation stages <strong>of</strong> the project• traffic generated by personnel associated with the project (volume, composition,timing and routes)• arrangements for workforce transport to and from the project areas, includingproposed use <strong>of</strong> regional or charter air services• likely heavy and oversize/indivisible loads (volume, composition, timing and routes),highlighting any vulnerable bridges and structures along proposed routes.Include an overview map(s) that shows the project’s relationship with current and futurelocal and state-controlled road networks. Include in the map(s) the location <strong>of</strong>construction activities and access locations (existing and proposed).5.10.3. Potential impacts and mitigation measuresInclude details <strong>of</strong> the adopted assessment methodology (for impacts on roads: the roadimpact assessment (RIA) report in general accordance with the Guidelines forAssessment <strong>of</strong> Road Impacts <strong>of</strong> Development (GARID) (Department <strong>of</strong> Main Roads2006).For inclusion in an RIA, assess project impacts, in consultation with relevant transportauthorities and providers, for example TMR, MRC, <strong>Queensland</strong> Police Service,<strong>Queensland</strong> Rail, on:• local and state-controlled road networks, including key road and road/railintersections during the construction and operation stages <strong>of</strong> the project• capacity, safety, local amenity, efficiency and condition <strong>of</strong> transport operations,services and assets (from either transport or project operations)• walking and cycling paths• possible interruptions to transport operations (for example, road closures anddiversions)- 52 - Contents <strong>of</strong> the EISDudgeon Point Coal Terminals Project<strong>Terms</strong> <strong>of</strong> reference for an environmental impact statement

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!