12.07.2015 Views

Terms of Reference - North Queensland Bulk Ports Corporation

Terms of Reference - North Queensland Bulk Ports Corporation

Terms of Reference - North Queensland Bulk Ports Corporation

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• any other associated facilities.4.5.4. Temporary workforce accommodationIf temporary workforce accommodation is to be provided by the project specifically tobe used to accommodate the project workforce, in addition to any existing or proposedindependent accommodation options, provide details on the number, size, location(shown on a map), management, proximity to the construction site, and typical facilitiesfor these project temporary workforce accommodation sites.Options for the location/s <strong>of</strong> any temporary workforce accommodation camps are to bedetermined in consultation with MRC.Information should outline any local government or other regulatory approvals requiredto establish and operate such camps, including development approvals, building,health and safety, and waste disposal purposes.4.5.5. EnergyDescribe all energy requirements including electricity, natural gas, and/or solid andliquid fuel requirements for the construction and operation <strong>of</strong> the project.Detail the location, design and capacity <strong>of</strong> power generation and transmissioninfrastructure in the project area for construction and operation. Show the locations <strong>of</strong>any easements on the infrastructure plan.Provide details <strong>of</strong> any proposed generation <strong>of</strong> renewable energy within the projectarea.Briefly describe energy conservation measures in the context <strong>of</strong> any relevantAustralian, state and local government policies.4.5.6. Water supply and storageProvide information on the proposed water usage by the project, including:• water supply design• the ultimate supply and sources <strong>of</strong> this supply required to meet the demand for fulloccupancy <strong>of</strong> the development• the quality and quantity <strong>of</strong> all water supplied to the site during the construction andoperation stages based on minimum yield scenarios for water re-use, rainwaterharvesting and re-use and bore water volumes• a water balance analysis• water storage details (potable and stormwater)• fire fighting flows required• any recycling <strong>of</strong> treated wastewater.For any approvals required under SPA or the Water Act (if required), report onproposed sources <strong>of</strong> either allocated or independent water supply to address projectrequirements (for both construction and operation stages) that does not counteractcurrent water allocations and demands in the region. This assessment is to includeContents <strong>of</strong> the EISDudgeon Point Coal Terminals Project<strong>Terms</strong> <strong>of</strong> reference for an environmental impact statement- 21 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!