12.07.2015 Views

Terms of Reference - North Queensland Bulk Ports Corporation

Terms of Reference - North Queensland Bulk Ports Corporation

Terms of Reference - North Queensland Bulk Ports Corporation

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• development permit for operational work that is the construction or raising <strong>of</strong> awaterway barrier work—Fisheries Act• development permits for operational work to take or interfere with groundwater—Water Act• development permit for vegetation clearing operational works—VM Act• development permit for material change <strong>of</strong> use (MCU) <strong>of</strong> a premises for anenvironmentally relevant activity (ERA)—EP Act– ERA 8(3)(a)—chemical storage– ERA 15—fuel burning– ERA 16(1)(d)—extractive and screening activities– ERA 16(2)(d)—extractive and screening activities– ERA 16(3)(b)—extractive and screening activities– ERA 17—abrasive blasting– ERA 18(b)—boilermaking or engineering– ERA 21—motor vehicle workshop operation– ERA 38(2)(a)—surface coating– ERA 43—concrete batching– ERA 47(a)—timber milling and woodchipping– ERA 50(1)(a)—bulk material handling– ERA 63(2)(b)(ii)—operating sewage treatment works• development permit for MCU <strong>of</strong> a premises for any other ERAs• carrying out works in a state marine park—Marine Parks Act• permit to dredge the existing sea channel where it falls within the boundary <strong>of</strong> aState Marine Park (i.e. the Great Barrier Reef Coast Marine Park)—Marine ParksAct• operating a facility for a purpose, mooring (GBRMP Zoning Plan 2003)—MarineParks Act• licences and permits which may potentially be required under the Water Act:– water licence– riverine protection permit for destroying vegetation, excavate or place fill in awater course• allocation <strong>of</strong> quarry material—Coastal Act• licence or permit under the NC Act for the disturbance <strong>of</strong> native flora, fauna orhabitats• carrying out works on state-controlled roads—TIA• allocation <strong>of</strong> state land—Land Act 1994.Identify the relevant approval agency for each approval required.3.8.2. Relevant plans and policiesOutline the project's consistency with the existing national, state, regional and localplanning framework that applies to the project location. Refer to all relevant statutoryContents <strong>of</strong> the EISDudgeon Point Coal Terminals Project<strong>Terms</strong> <strong>of</strong> reference for an environmental impact statement- 13 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!