12.07.2015 Views

zefiro - larius.org

zefiro - larius.org

zefiro - larius.org

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ZEFIRO• The supply cable is provided without plug.Use a plug which guarantees the plant earthing.Only a technician or a skilled person should perform theconnection of the plug to the electric cable.• Place the pressure control knob (F5) on the “MIN” position(turn counterclockwise).F5EnglishShould anyone use an extension cable betweenthe tooling and the socket, it must have the samecharacteristics as the cable supplied (minimumdiameter of the wire 2,5 mm 2 ) with a maximumlength of 50 mt. Higher lengths and lower diameterscan provoke excessive voltage falls and also ananomalous working of the equipment.CONNECTION OF THE TOOLING TO THE POWER SUPPLY• Check the switch (F4) is on the "OFF" (0) position beforeconnecting the cable to the mains.OFFF4WASHING OF THE NEW EQUIPMENT• The equipment has already been adjusted at our factory withlight mineral oil left inside the pumping group as protection.Therefore, wash with diluent before sucking the product.11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!