12.07.2015 Views

Checklist ISO/IEC 17021: 2006. Conformity assessment ... - Sanas

Checklist ISO/IEC 17021: 2006. Conformity assessment ... - Sanas

Checklist ISO/IEC 17021: 2006. Conformity assessment ... - Sanas

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ISO</strong>/<strong>IEC</strong> <strong>17021</strong> Requirement CB’s References COMMENT BY ASSESSORcustomer organization, the scope and complexity ofits management system, products and processes aswell as demonstrated level of management systemeffectiveness and the results of any previous audits?Where a CB is taking account of certification or otheraudits already granted to the customer, does it collectsufficient, verifiable information to justify and recordany adjustments to the audit programme?F 155-029.1.2 Is an audit plan established for each audit to providethe basis for agreement regarding the conduct andscheduling of the audit activities? Audit plan drawnup in accordance with the relevant guidanceprovided in <strong>ISO</strong> 19011?9.1.3 Process in place for selecting and appointing theaudit team taking into account the competenceneeded to achieve the objectives of the audit?Process in accordance with the relevant guidanceprovided in <strong>ISO</strong> 19011?9.1.4 Does the CB have documented procedures fordetermining audit time?Does the procedure include or make reference to therelevant Annexes in the IAF GD2 and GD6documents?Note: Guidance in respect of multi-sites remains applicableeven if it appears in the main body of the guidancedocument until such time that specific IAF ApplicationGuidance is publishedIs the audit time determined by the CB, and thejustification for the determination, recorded?In determining the audit time, does the CB consider,among other things, the following aspects:a) the requirements of the management systemstandard?b) size and complexity?c) technological and regulatory context?d) Any outsourcing?e) The results of any prior audits?f) number of sites and multi-site considerations?.2008-07-25 ©SANAS Page 14 of 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!