12.07.2015 Views

TENDER FOR PROCUREMENT OF LABORATORY EQUIPMENTS ...

TENDER FOR PROCUREMENT OF LABORATORY EQUIPMENTS ...

TENDER FOR PROCUREMENT OF LABORATORY EQUIPMENTS ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tea Board/Kolkata/2011-12- QCL Tender Document-Originalwater to the filteration unit should be specified. The system should have facility to store andprovide water equivalent to double distillation for misc laboratory analytical work. The storagecapacity of the reservoir should be 30- 60 L. The final quality of water supposed to be used forHPLC application as per ASTM water qualily or should have resistivity of 18.2 MΩ·cm at 25 °Cand a TOC value below 5 ppb. The water should be pyrogen free and bacterial count below 0.1CFU/ml.The flow rate of product water should be provided. The sodium, potassium and chloridecontent of the final water should be specified.The system should be automatic and 24 hrs operation. PE reservoir which eliminates leaching oforganic materials, protects against contaminationShould include enough spares to last at least 2 years. Complete installation anddemonstration should be provided by factory-trained certified engineers. AfterSale Service should be available promptly.q.Gas Cylinders (High Pure)N2 gas with cylinder (47L)and regulator (two stage) with heater, necessary tubings andconnectors. The heater should work on 22010 V ; 50 Hz AC.1 gas cylinder and 1 regulator (two stage) Nitrogen or suitable gas cylinders for collision withhighest volume capacity and filled with high pure gases. The cylinders have to be provided withsafety certificatesr.REFRIGERATED CENTRIFUGESlNoSpecifications/RequirementsCriterion1 Model /Brand Specify2 Position Floor Mounting/Table top3 ControlMicroprocessor controlled timer, speed in RPM/g,temperature and digital display4 MotorBrushless induction motor - practically maintenancefree, reliable drive system with low level of vibrationand noise , dynamic brake5 Display RPM/g, Time, Curve6 Parameter setting7 Controlling Facility8Speed holding accuracy/ Min speedTime, Temperature, Speed, acceleration anddecelaration curve, programmeManual adjustment of speed, time, temperature,acceleration, deceleration curve, programme thecontrolling knob or touch botton facility should beprovided100 rpm or Equivalent g9 Speed indicator 0 - 99 min with temperature indicator10 Timer Control 60 sec to 99 min46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!