12.07.2015 Views

Bosch Rexroth IndraDyn S - MKE Project Planning Manual

Bosch Rexroth IndraDyn S - MKE Project Planning Manual

Bosch Rexroth IndraDyn S - MKE Project Planning Manual

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

114/131 <strong>Bosch</strong> <strong>Rexroth</strong> AG | Electric Drivesand Controls<strong>Rexroth</strong> <strong>MKE</strong> Synchronous Motors | <strong>Project</strong> <strong>Planning</strong> <strong>Manual</strong>Startup, Operation and Maintenance12.5 Troubleshooting(1) Use housing screws according to DIN EN ISO 4762 with minimum resistanceof 8.8!(2) Battery connector(3) Screws for mounting the battery.(4) BatteryFig.12-1: Battery changeBattery removal1. Loosen the internal hexagon screw (1).2. Take off the encoder lid.3. Pull off the battery connector (2).4. Lossen screws (3) of the battery`s screw terminal (4) and remove the battery.Battery installation1. Connect the ready-made battery according to the motor type and fastenit with the clamping apparatus (4) and the screws (3) (tightening torquemaximum 1.0 Nm).Do not squeeze the battery cable!2. Attach the battery connector (2).3. Close the encoder lid.4. Screw in the hexagon screws (1) and tighten it with the torque indicated.(<strong>MKE</strong>037 with 3,1 Nm, <strong>MKE</strong>047 with 1,3 Nm, <strong>MKE</strong>098 with 6,1 Nm).The motor is operational.Restart the system1. Turn on power supply of drive control system.2. Carry out a test run of the axes.Inpreparation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!