12.07.2015 Views

Bosch Rexroth IndraDyn S - MKE Project Planning Manual

Bosch Rexroth IndraDyn S - MKE Project Planning Manual

Bosch Rexroth IndraDyn S - MKE Project Planning Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong> <strong>Planning</strong> <strong>Manual</strong> | <strong>Rexroth</strong> <strong>MKE</strong> Synchronous Motors Electric Drivesand Controls| <strong>Bosch</strong> <strong>Rexroth</strong> AG 111/131Startup, Operation and Maintenance12 Startup, Operation and Maintenance12.1 CommissioningCAUTIONMaterial damage due to errors in the controls of motors and moving elements!Unclear operating states and product data!⇒ Do not carry out commissioning if connections, operating states or productdata are unclear or faulty!⇒ Do not carry out commissioning if the safety and monitoring equipment of thesystem is damaged or not in operation.⇒ Damaged products must not be operated!⇒ Contact <strong>Rexroth</strong> for missing information or support during commissioning!The following commission notes refer to the <strong>MKE</strong> motors as part of a drivesystemwith drive and control unit.Preparation 1. Keep the documentation of all applied products ready.Execution2. Check the products for damage.3. Check all mechanical and electrical connections.4. Activate the safety and monitoring equipment of the system.When all requirements are met, proceed as follows:1. Activate the optional blower.2. Carry out the commission of the drive system according to the instructionsprovided in the respective documentation. You can find the respective informationin the functional description of the drive controllers.Commissioning of drive controllers and the control unit may require additionalsteps. The inspection of the functioning and performance of the systemsis not part of the commissioning of the motor; instead, it is carried out within theframework of the commissioning of the machine as a whole. Observe the instructionsand regulations given by the machine manufacturer.12.2 OperationMake sure that the ambient conditions described in Chapter chapter 9.2 "SetupHeight and Ambient Temperature" on page 81 are kept during operation.12.3 DeactivationIn the case of malfunctions or maintenance, or to deactivate the motors, proceedas follows:1. Observe the instructions of the machine documentation.2. Use the control commands to bring the drive to a controlled standstill.3. Switch off the power and control voltage of the drive controller.4. Switch off the main switch of the machine.5. Secure the machine against accidental movements and against unauthorizedoperation.6. Wait for the discharge time of the electrical systems to expire and thendisconnect all electrical connections.7. Before dismantling, secure the motor against falling or movements beforedisconnecting the mechanical connections.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!