12.07.2015 Views

View Full July PDF Issue - Utility Contractor Magazine

View Full July PDF Issue - Utility Contractor Magazine

View Full July PDF Issue - Utility Contractor Magazine

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operation: Slide RailIcon Equipment Distributors Inc. Shores inClose QuartersCompiled by UC StaffThe shoring mission Icon Equipment Distributors Inc.accepted involved the installation of several utilities in fiveindividual 16-in. steel casings under Whitney Ave. at YaleUniversity. Giordano Construction of Branford, Conn., decidedto go with pilot tube-guided auger boring, but werestill looking for a shoring solution.Before Giordano Construction broke ground, it had severalpre-bid and pre-construction meetings. Working closelywith the contractor, Icon provided a slide rail shoring system,specifically engineered for the tight conditions of theproject. Icon supplied two slide rail systems for the jackingand receiving pits required for the trenchless crossing underWhitney Ave. The jacking pit was 32 ft long, 16.4 ft wideand 16 ft deep, while the receiving pit was 16.4 ft wide,11.48 ft long and 16 ft deep on the other side of the road.Once onsite, Icon provided installation training for theslide rail system, as well as all operator training and expertisefor the pilot tube boring system being rented. In additionto the steel casing being installed, which needed utilityaccess with its internal waler frames and utility panels, Iconalso supplied additional frames and panels to sheet aroundperpendicular utilities encountered approximately 5 ft underground.“Icon provided all the site specific engineering designwith a CT. P.E. stamp on all drawings and calculationsheets, as well as safety and assembly guides that are givendirectly to the crew for reference and material on site,” saysDavid Crandall, Vice President of Sales and Marketing atIcon Equipment Distributors Inc. “Our field technicianswere onsite to provide training, assistance and ensure thesafe operation and clean installation of the slide rail systemsfor the project.”With Icon professionals on the job lending a helping hand,the slide rail system was successfully installed and allowedthe job to be completed safely.Bridge to ShoreMabey Calms Troubled Jobsite SeasCompiled by UC StaffAdaptability is the key. One trench shoring solution doesn’tfit all, and Mabey Bridge and Shore knows it. When the Orlando,Fla.-based Central Florida Underground was contractedto install a concrete intake structure — supplying coolingwater for a local power plant — 30 ft into a small lake, interlockingsheet pile from Mabey Bridge and Shore was tailoredto get the job done.“The project was especially difficult due to the largeamount of water (and subsequent de-watering) involvedand the distance from shore,” says Greg Richards, MarketingRepresentative for Mabey Bridge and Shore Inc. “Routineexcavations in Florida may involve greater depths than this,but only a minimal amount of groundwater. This project involvedholding back a significant amount of above-groundwater, which was a great test for Mabey’s water-resistant interlockingsheets.”Mabey sheet pile is available in a wide range of sizes forvarious applications and can be used together with Mabey’shydraulic framing systems when needed. For Central Flor-28 <strong>Utility</strong> <strong>Contractor</strong> | <strong>July</strong> 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!