5' GRADETRANSITIONAS APPLIES1 916' - 8 3 8"5' GRADETRANSITIONAS APPLIES% EXIST.% VARIESSIGN5' MINCLEARPER PLAN2% MAXBENCH3 OR 4TRASH4' - 8"% VARIES% EXIST.18"5 OR 65 OR 6REMOVAL LIMITS PER PLAN1 97 8AS APPLIES~108"5' MINCLEAR3 OR 4 9'-2 3/4"7'-3"39 3/4"1345REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW PRESIDIO TRASH RECEPTACLERELOCATE/REINSTALL EXISTING TRASH RECEPTACLEREMOVE EXISTING, RELOCATE AND INSTALL NEW 12' I-STOPPOLE & FOOTING6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1048 REMOVE EXISTING & INSTALL NEW PCC CURB & GUTTER(MATCH EXISTING) PER CITY OF NORWALK STD. PLAN 105WITH A 12" THICK GUTTER9 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, ANDPRESIDIO BENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONSCITY OF NORWALK1 9BUS SHELTER REPLACEMENT PROJECTTYPICAL TOLAR SHELTER INSTALLATION DETAILS4'-8"SHEET:A-4


42.0'1 2 11 4 7 1 26 9.5'6.5'6.5'2.0'IMPERIAL HWY.DIRECTION OF TRAFFIC2.0'~120' TO ETWSTUDEBAKER RD.BUS STOP #166: IMPERIAL & STUDEBAKER (EB/FS)SCALE: 1" = 10'18.0'2 10467.0'1110.0'SAN ANTONIO DRIVEDIRECTION OF TRAFFIC2.5'7BUS STOP #33: SAN ANTONIO & FRONT ST (SB/NS)12411SCALE: 1" = 10'REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW KALEIDOSCOPE SHELTER, PRESIDIO BENCH, ANDSOLAR LIGHTING PER DETAIL ON SHEET A-3 & SPECIFICATIONSRELOCATE/REINSTALL EXISTING TRASH RECEPTACLE6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 10410 TRIM CONFLICTING PORTIONS OF EXISTING TREERELOCATE EXISTING SURFACE MOUNT PRESIDIO BENCHCITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTIMPERIAL & STUDEBAKER (EB)SHEET:A-5


18.0'12 3SALVAGE EX. TRASHRECEPTACLE PER SPEC.TR.PLANTER9.0'6.0'PLANTERNORWALK BLVD. 6 71.5'~100' TO ETWDIRECTION OF TRAFFICIMPERIAL HWY.BUS STOP #19: NORWALK & IMPERIAL (NB/FS)SCALE: 1" = 10'246.0'42111147.0'2.5'NORWALK BLVD.5 7DIRECTION OF TRAFFICVLT.5' GRADETRANSITION10.0'~270' TO ETWIMPERIAL HWY.5W.M.BUS STOP #30: NORWALK & IMPERIAL (SB/FS)SCALE: 1" = 10'12345678REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW KALEIDOSCOPE SHELTER, PRESIDIO BENCH, ANDSOLAR LIGHTING PER DETAIL ON SHEET A-3 & SPECIFICATIONSINSTALL NEW PRESIDIO TRASH RECEPTACLERELOCATE/REINSTALL EXISTING TRASH RECEPTACLEREMOVE EXISTING, RELOCATE AND INSTALL NEW 12' I-STOPPOLE & FOOTINGREMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTINGREMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 104REMOVE EXISTING & INSTALL NEW PCC CURB & GUTTER(MATCH EXISTING) PER CITY OF NORWALK STD. PLAN 105WITH A 12" THICK GUTTER11 RELOCATE EXISTING SURFACE MOUNT PRESIDIO BENCHCITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTNORWALK & IMPERIAL (NB) AND NORWALK & IMPERIAL (SB)SHEET:A-6


PROTECTIN PLACE27.0'124PLANTER10.0'TEL.7.0'5' GRADE5TRANSITION 7~60' TO ETWCIVIC CENTER DR.2.5'WVAULTS.L.NORWALK BLVD.DIRECTION OF TRAFFICBUS STOP #31: NORWALK & CIVIC (SB/NS)SCALE: 1" = 10'122.0'210.0'7.0'TEL.PLANTER2.5'NORWALK BLVD. 6DIRECTION OF TRAFFIC87~70' TO ETWCIVIC CENTER DR.BUS STOP #18: NORWALK & CIVIC (NB/FS)SCALE: 1" = 10'12345678REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW KALEIDOSCOPE SHELTER, PRESIDIO BENCH, ANDSOLAR LIGHTING PER DETAIL ON SHEET A-3 & SPECIFICATIONSINSTALL NEW PRESIDIO TRASH RECEPTACLERELOCATE/REINSTALL EXISTING TRASH RECEPTACLEREMOVE EXISTING, RELOCATE AND INSTALL NEW 12' I-STOPPOLE & FOOTINGREMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTINGREMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 104REMOVE EXISTING & INSTALL NEW PCC CURB & GUTTER(MATCH EXISTING) PER CITY OF NORWALK STD. PLAN 105WITH A 12" THICK GUTTERCITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTNORWALK & CIVIC (SB) AND NORWALK & CIVIC (NB)SHEET:A-7


34.0'12 468.5'7S.D.11.6'T.S.5' GRADETRANSITION4.0'ROSECRANS AVE.DIRECTION OF TRAFFIC4' GRADETRANSITION~50' TO ETWSTUDEBAKER RD.BUS STOP #187: ROSECRANS & STUDEBAKER (EB/FS)SCALE: 1" = 10'35.0'19 410.7'10.0'5' GRADETRANSITION6.5'62.0'ROSECRANS AVE.DIRECTION OF TRAFFICW.M.T.S.5' GRADETRANSITION~80' TO ETWCLARKDALE AVE.BUS STOP #209: ROSECRANS & CLARKDALE (WB/FS)SCALE: 1" = 10'124REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW KALEIDOSCOPE SHELTER, PRESIDIO BENCH, ANDSOLAR LIGHTING PER DETAIL ON SHEET A-3 & SPECIFICATIONSRELOCATE/REINSTALL EXISTING TRASH RECEPTACLE6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1049 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, AND PRESIDIOBENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONS7CITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTSHEET:A-8


327.0'19SALVAGE EX. TRASHRECEPTACLE PER SPEC.TR.4'MIN8.6'T.S.W.M.T.S.T.S.P.P.5' GRADETRANSITION5 74.3'ROSECRANS AVE.DIRECTION OF TRAFFIC9.0'~45' TO ETWCLARKDALE AVE.BUS STOP #192: ROSECRANS & CLARKDALE (EB/FS)SCALE: 1" = 10'40.0'1245.5'G5' GRADETRANSITION12.0' 7.0' 6.5'6EM2.0'7ROSECRANS AVE.DIRECTION OF TRAFFIC1.5'~50' TO ETWNORWALK BLVD.5' GRADETRANSITIONBUS STOP #194: ROSECRANS & NORWALK (EB/FS)SCALE: 1" = 10'1234567REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW KALEIDOSCOPE SHELTER, PRESIDIO BENCH, ANDSOLAR LIGHTING PER DETAIL ON SHEET A-3 & SPECIFICATIONSINSTALL NEW PRESIDIO TRASH RECEPTACLERELOCATE/REINSTALL EXISTING TRASH RECEPTACLEREMOVE EXISTING, RELOCATE AND INSTALL NEW 12' I-STOPPOLE & FOOTINGREMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTINGREMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 104CITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTSHEET:A-9


34.0'12 467.0'710.0'5' GRADETRANSITIONROSECRANS AVE.DIRECTION OF TRAFFIC2.5'~420' TO ETWGREENSTONE AVE.5' GRADETRANSITIONBUS STOP #204: ROSECRANS & BELCOURT APTS.(WB)SCALE: 1" = 10'50.7'1 9 4 7NEWSNEWS8.0'7.6'3.3'7.5'5' GRADETRANSITIONSTUDEBAKER RD.DIRECTION OF TRAFFIC~190' TO ETWALONDRA BLVD.5' GRADETRANSITIONBUS STOP #70: STUDEBAKER & ALONDRA (NB/FS)SCALE: 1" = 10'124REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW KALEIDOSCOPE SHELTER, PRESIDIO BENCH, ANDSOLAR LIGHTING PER DETAIL ON SHEET A-3 & SPECIFICATIONSRELOCATE/REINSTALL EXISTING TRASH RECEPTACLE6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1049 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, AND PRESIDIOBENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONSCITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTSHEET:A-10


24.0'196.2'8.0'1.6'7STUDEBAKER RD.DIRECTION OF TRAFFIC~70' TO ETWALONDRA BLVD.BUS STOP #65: STUDEBAKER & ALONDRA (SB/FS)SCALE: 1" = 10'35.0'19 46BELL8.0'7.6'3.3'75' GRADETRANSITIONALONDRA BLVD.DIRECTION OF TRAFFIC5' GRADETRANSITION~80' TO ETWSTUDEBAKER RD.BUS STOP #3: ALONDRA & STUDEBAKER (EB/FS)SCALE: 1" = 10'14REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESRELOCATE/REINSTALL EXISTING TRASH RECEPTACLE6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1049 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, AND PRESIDIOBENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONSCITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTSHEET:A-11


35.0'12 10 410.0'5' GRADETRANSITION7.0'6ALONDRA BLVD.DIRECTION OF TRAFFIC72.5'PLANTER5' GRADETRANSITION~75' TO ETWMAIDSTONE AVE.BUS STOP #6: ALONDRA & MAIDSTONE (EB/FS)SCALE: 1" = 10'20.0'19 746S.D.7.6'C.B.3.3'8.0'P.P.C.B.~40' TO ETWALONDRA BLVD.PIONEER BLVD.DIRECTION OF TRAFFICBUS STOP #7: PIONEER & ALONDRA (SB/NS)SCALE: 1" = 10'124REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW KALEIDOSCOPE SHELTER, PRESIDIO BENCH, ANDSOLAR LIGHTING PER DETAIL ON SHEET A-3 & SPECIFICATIONSRELOCATE/REINSTALL EXISTING TRASH RECEPTACLE6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1049 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, AND PRESIDIOBENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONS10TRIM CONFLICTING PORTIONS OF EXISTING TREECITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTSHEET:A-12


25.0'NEWS NEWSNEWS NEWSTEL.19 4T.S.8.0'867.6'3.3'79.0'GTEPIONEER BLVD.DIRECTION OF TRAFFIC5' GRADETRANSITION~40' TO ETWALONDRA BLVD.BUS STOP #41: PIONEER & ALONDRA (NB/FS)SCALE: 1" = 10'SHELTER POSTANCHOR BOLTS & BASE PLATECONC. SIDEWALKLEVEL ACROSSALL POSTSDRY PACK UNDERPLATE 1-1/2" MIN, 2" MAXCONC. FTG(4) #5 E.W.1'-9"3'-6" SQUARE144" CONC. SURROUND TO COL. &BASE PLATE1/2" EXPANSION JOINT ALLAROUND COLUMNKALEIDOSCOPE SHELTER FOOTING DETAILNTS4"3" CLR1'-3" 7 3/4"MIN CLRNOTE:CONCRETE:f'c=3000PSIREINF STL: GRADE 60MIN SOIL BEARING CAP: 1000 PSFREMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESRELOCATE/REINSTALL EXISTING TRASH RECEPTACLE6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1048 REMOVE EXISTING & INSTALL NEW PCC CURB & GUTTER(MATCH EXISTING) PER CITY OF NORWALK STD. PLAN 105WITH A 12" THICK GUTTER9 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, ANDPRESIDIO BENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONSCITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTSHEET:A-13