12.07.2015 Views

UFS | EÜK screed-covered duct system - OBO Bettermann

UFS | EÜK screed-covered duct system - OBO Bettermann

UFS | EÜK screed-covered duct system - OBO Bettermann

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Planning aid, <strong>screed</strong>-<strong>covered</strong> <strong>duct</strong> <strong>system</strong>Mounting aid, underfloor <strong>duct</strong>Draw mounting planningThe planned <strong>duct</strong> routes and the crossingpoints and points relevant for junction andbranch boxes or underfloor boxes should bemarked on the floor in advance, e.g. using achalk line.Mounting of underfloor boxesUnderfloor boxes are aligned and fastened onthe lines and the crossing points. This allowsthe required <strong>duct</strong> length to be determined.Preparations for trunking installationThe length of the <strong>duct</strong> sections can now be determinedexactly. The material can be laid outon the floor.Cutting the <strong>duct</strong>sThe simplest way to adjust the sheet steel<strong>duct</strong>s is using a single-handed angle grinder.Clean cuts and subsequent deburring are importantfor beneficial installation of the cables.Duct connector mountingThe <strong>duct</strong> connectors can be positioned afterthe <strong>duct</strong> has been cut to size.Equipotential bondingConnection shackles create the con<strong>duct</strong>iveconnection of the two inserted pieces of <strong>duct</strong>.Alternatively, con<strong>duct</strong>ive connections can becreated between construction elements usingexternal connections, by soldering, welding, rivetingor screwing.Connector fixingThe underfloor <strong>duct</strong> is fastened to the substrateusing the connection shackle. Additional fasteningwithin a <strong>duct</strong> length is not required.Mounting, riser bendRiser bends can be easily mounted as wallconnections for insertion of cables in the underfloor<strong>system</strong>. The connection is simple tomake and uses a <strong>duct</strong> connector.End cap mountingThe underfloor <strong>duct</strong> is closed with an end closuresection, suitable for each <strong>duct</strong> size. Theend connection can simply be inserted into the<strong>duct</strong> without any screwing.08 <strong>UFS</strong>_Katalog_Middle_East_2010 / en / 13/12/2010 (LLExport_01150)30 <strong>OBO</strong> <strong>UFS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!