12.07.2015 Views

UFS | EÜK screed-covered duct system - OBO Bettermann

UFS | EÜK screed-covered duct system - OBO Bettermann

UFS | EÜK screed-covered duct system - OBO Bettermann

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Planning aid, <strong>screed</strong>-<strong>covered</strong> <strong>duct</strong> <strong>system</strong>System description, installation <strong>duct</strong>Screed-<strong>covered</strong> <strong>duct</strong> <strong>system</strong>s aresuitable for all types of <strong>screed</strong>structures: cement <strong>screed</strong>, pouredasphalt and floating <strong>screed</strong>. The<strong>duct</strong>s are available in the heights28, 38 and 48 mm, and in thewidths 190, 250 and 350 mm. Referto the pro<strong>duct</strong> section of thecatalogue for more detailed informationon the usable cross-section.The <strong>duct</strong>s are made from galvanisedsheet steel with a zinccoating of 275 g/m² according toEN 10327 DX51D+Z275-N-A-C.The two and three-compartment<strong>duct</strong> is divided using fixed sheetsteel separating retainers. The minimum<strong>screed</strong> cover for cement<strong>screed</strong>s is 35 mm. The area of applicationfor underfloor <strong>duct</strong> <strong>system</strong>sranges from office and administrativebuildings, throughcommercial exhibition areas rightup to the construction of living accommodation.Composite <strong>screed</strong> applicationIn cement composite <strong>screed</strong>, the underfloor installation<strong>duct</strong> can be mounted quickly, easilyand without additional protection. The cement<strong>screed</strong> can be applied directly to the galvanisedsheet steel <strong>duct</strong>.Floating <strong>screed</strong> applicationUnderfloor installation <strong>duct</strong>s can be mounted infloating <strong>screed</strong> just as easily as in cement composite<strong>screed</strong>. For noise re<strong>duct</strong>ion reasons, the<strong>duct</strong> is laid inside the insulation.08 <strong>UFS</strong>_Katalog_Middle_East_2010 / en / 13/12/2010 (LLExport_01150)22 <strong>OBO</strong> <strong>UFS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!