12.07.2015 Views

kn series gas boiler installation & operating ... - Agencespl.com

kn series gas boiler installation & operating ... - Agencespl.com

kn series gas boiler installation & operating ... - Agencespl.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

KN INSTALLATION AND OPERATION INSTRUCTIONSPage 13g) Any improper operation of the <strong>com</strong>mon ventingsystem should be corrected so the <strong>installation</strong>conforms with the National Fuel Gas Code, ANSIZ223.1/NFPA 54. When resizing any portion of the<strong>com</strong>mon venting system, the <strong>com</strong>mon ventingsystem should be resized to approach the minimumsize as determined using the appropriate tables inAppendix F in the National Fuel Gas Code, ANSIZ223.1/ NFPA 54 and or CSA B149 InstallationCodes.Figure 8 - Relief Valve PipingTout mauvais fonctionnement du systéme d'évacution<strong>com</strong>mun devrait étré corrigé de façor que l'<strong>installation</strong>soit conforme au National Fuel Gas Code,ANSI Z223.1/NFPA 54 et (ou) aux codes d'<strong>installation</strong>CSA-B149. Si la grosseur d'une section du systèmed' évacuation doit étré modifiée, le système devraitétré modifié pour respecter les valeurs minimales destableaux pertinents de l'appendice F du National FuelGas Code, ANSI Z223.1/NFPA 54 et (ou) des codesd'<strong>installation</strong> CSA-B149.GENERAL PIPING REQUIREMENTSCAUTION: Improper piping of this <strong>boiler</strong> will void themanufacturer’s warranty and can cause <strong>boiler</strong> failureresulting in flooding and extensive property damage!NOTE: Shut off valves and unions should beinstalled at the inlet and outlet connections of the<strong>boiler</strong> to provide for isolation of the unit shouldservicing be necessary.Relief ValvePipe the discharge of the pressure relief valve as shownin Figure 8.WARNING: Never install any type of valvebetween the <strong>boiler</strong> and the relief valve or anexplosion causing extensive property damage,severe personal injury or death may occur!Flow SwitchThe flow switch supplied with the <strong>boiler</strong> is wired toprevent the <strong>boiler</strong> from firing unless there's adequatewater flow through the unit.NOTE: Failure to maintain a minimum flow rate of 30gpm, 1.9 L/s at the <strong>boiler</strong> outlet will prevent the flowswitch from closing. If a minimum flow rate of 30 gpm,1.9 L/s cannot be maintained at the <strong>boiler</strong> outlet theflow switch will have to be relocated in the system.HEATING SYSTEM PIPINGGeneral Piping RequirementsAll heating system piping must be installed by a qualifiedtechnician in accordance with the latest revision of theANSI/ASME Boiler and Pressure Vessel Code, SectionIV.Where required, the piping must <strong>com</strong>ply with ANSI/ASME CSD-1, Standard for Controls and Safety Devicesfor Automatically Fired Boilers.All applicable local codes and ordinances must also befollowed. A minimum clearance of 1in, 25 mm must bemaintained between heating system pipes and all<strong>com</strong>bustible construction. All heating system piping mustbe supported by suitable hangers not the <strong>boiler</strong>. Thethermal expansion of the system must be consideredwhen supporting the system. A minimum systempressure of 12 psig, 84 kPa must be maintained at thehighest point in the system piping.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!