12.07.2015 Views

Draft Secondary Plan Policies - Town of Innisfil

Draft Secondary Plan Policies - Town of Innisfil

Draft Secondary Plan Policies - Town of Innisfil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

x) Whether the applications adversely affect the <strong>Town</strong>’s ability to achieve itsintensification target under the Growth <strong>Plan</strong>.xi)xii)Whether the application represents a logical progression <strong>of</strong> continuous development.Whether the application contains Low Impact Design features that minimize the size<strong>of</strong> stormwater management ponds and whether the stormwater design improvesdownstream flooding.c) Development <strong>of</strong> any parcel <strong>of</strong> land within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> area shall notreceive final draft approval until such time as storm water, sanitary sewer, water facilitiesand utilities necessary to serve the parcel are available or provision has been madesatisfactory to the municipality, to make them available.d) A Holding Zone provision (“H”) may be applied to ensure that construction <strong>of</strong> newdevelopment does not commence until the matters in Section 15.10.8 b) have beenaddressed for each sub-phase as required.e) The approval <strong>of</strong> specific development applications in the Alcona North <strong>Secondary</strong> <strong>Plan</strong> areashall be governed by the following principles:i) avoidance <strong>of</strong> scattered development;ii) sequential development <strong>of</strong> neighbourhood areas;iii) provision <strong>of</strong> school sites and parks;iv) sequential construction <strong>of</strong> collector roads and access to arterial and boundary roads;v) sequential construction <strong>of</strong> sanitary sewer and watermain extensions and electricaldistribution system and any sub-phasing as contemplated by Section 15.10.1 e); andvi) the adequacy <strong>of</strong> storm drainage.f) As per Section 2.5.14 and 2.5.15, development within any phase shall not occur until the<strong>Town</strong> Wide Water and Wastewater Master Servicing <strong>Plan</strong> is completed, an updatedDevelopment Charges By-law is approved, the studies outlined in Section 15.9 arecompleted , and that the servicing <strong>of</strong> the subject lands supports, or does not impede, theservicing <strong>of</strong> the <strong>Innisfil</strong> Heights Economic District Expansion Area and a financing strategyfor the <strong>Innisfil</strong> Heights Economic District to the satisfaction <strong>of</strong> the <strong>Town</strong>.g) Notwithstanding Section 2.5.14, 2.5.15, and 15.10.8f) development on lands designatedLight Industrial Service, Neighbourhood Commercial Area and Highway Commercial Area,may proceed subject only to the study requirements noted in Section 15.9.15.10.9 Development Chargesa) Works within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> Area include both local services (i.e. to be adirect developer responsibility) and works that are considered shared and eligible for costrecovery through the Development Charge By-law (non-local).b) Prior to revising the Development Charges By-law, the <strong>Town</strong> shall determine, based on theapproved <strong>Town</strong> Wide Water and Wastewater Master Servicing <strong>Plan</strong>, those works andservices within the <strong>Secondary</strong> <strong>Plan</strong> Area which are local and which are non-local.January 2012 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!