Amendment No. X__to theOfficial <strong>Plan</strong>for the<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong>ALCONA NORTH SECONDARYPLANJuly 2013


THE CONSTITUTIONAL STATEMENTThe following Amendment to the Official <strong>Plan</strong> for the <strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> consists <strong>of</strong> three (3)parts:PART A – THE PREAMBLE - consists <strong>of</strong> the purpose, location andbasis for the Amendment and doesnot constitute part <strong>of</strong> the actualAmendment.PART B – THE AMENDMENT - which sets out the actual Amendmentconsisting <strong>of</strong> the text and Schedule“A” which constitutes AmendmentNo. ____ to the Official <strong>Plan</strong> for the<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong>.PART C – THE APPENDICES - consists <strong>of</strong> information pertinent tothis Amendment in the form <strong>of</strong>background information. This sectiondoes not constitute part <strong>of</strong> the actualAmendment.July 2013i


PART A – THE PREAMBLE1. PurposeThe purpose <strong>of</strong> this amendment is to incorporate a new <strong>Secondary</strong> <strong>Plan</strong> for aportion <strong>of</strong> the Alcona Settlement Area into the Official <strong>Plan</strong>. This <strong>Secondary</strong> <strong>Plan</strong>includes a detailed land use schedule and establishes detailed policies for theSettlement Area. This amendment shall constitute an amendment to the May 2009Ontario Municipal Board approved Official <strong>Plan</strong> and shall be incorporated intoSection 15 <strong>of</strong> the Official <strong>Plan</strong>.2. LocationAmendment No. X applies to the lands generally bound by 20 th Sideroad to the west,the 9 th Line and the half concession line <strong>of</strong> Concession 9 to the north, the half lot line<strong>of</strong> Lot 24 to the east, and the half concession line <strong>of</strong> Concession 8 to the south.3. BasisIn 2004 D.G. Pratt Construction Limited (“Pratt”) filed an application for an Official<strong>Plan</strong> Amendment for a new <strong>Secondary</strong> <strong>Plan</strong> Area north <strong>of</strong> Alcona called theLeonard’s Beach <strong>Secondary</strong> <strong>Plan</strong> Area. In 2004, Pratt appealed part <strong>of</strong> therequested Official <strong>Plan</strong> Amendment (the “Alcona North Amendment”), which wouldbring approximately 211 hectares <strong>of</strong> land into the Alcona urban boundary andredesignate those lands with appropriate land use designations.The Alcona North Amendment includes all <strong>of</strong> the lands north <strong>of</strong> Alcona that wereincluded in the <strong>Town</strong>’s Official <strong>Plan</strong> Amendment #1 which was approved by SimcoeCounty in October 2009 and is currently under appeal. Official <strong>Plan</strong> Amendment #1identifies Urban Settlement Expansion Areas both to the north and south <strong>of</strong> theAlcona Urban Settlement. These areas represent the locations intended toaccommodate the majority <strong>of</strong> the <strong>Town</strong>’s forecasted residential growth. The <strong>Town</strong>initiated the Alcona North <strong>Secondary</strong> <strong>Plan</strong> in 2010 and an Open House was held inJuly 2011 and the Statutory Public Meeting was held in December 2011.The Alcona North Amendment also includes lands north <strong>of</strong> the 9 th Line that wereoutside <strong>of</strong> the limits identified in the <strong>Town</strong>’s Official <strong>Plan</strong> Amendment #1 and theAlcona North <strong>Secondary</strong> <strong>Plan</strong>.The preparation <strong>of</strong> a <strong>Secondary</strong> <strong>Plan</strong> for the Alcona North Amendment lands willaddress a number <strong>of</strong> matters including:1. Phasing according to infrastructure provision and population targets;2. Protection <strong>of</strong> all Natural Heritage Features including designation <strong>of</strong> a minimum30 metre vegetation protection zone;3. Delineation <strong>of</strong> lands for commercial uses in locations which provide focal pointsfor the surrounding neighbourhoods; and4. Delineation <strong>of</strong> lands for a range <strong>of</strong> residential densities.July 2013ii


5. Require detailed technical studies including:A hydrogeological study;An environmental analysis;A master drainage plan;A servicing master plan;A transportation master plan;A commercial needs analysis;An urban design report;A fiscal impact report;A planning assessment report;A phasing analysis;A community facilities needs assessment;An assessment <strong>of</strong> potential impact on adjacent agricultural operations andrecommendations for mitigation. Stormwater management plans toto address means <strong>of</strong> reducing downstream flooding and addressing requirements <strong>of</strong>the Lake Simcoe Protection <strong>Plan</strong>.PART B - THE AMENDMENT1. Schedule C: Transportation <strong>Plan</strong> is amended with the addition <strong>of</strong> collector roadsin Alcona North as shown on Schedule 1 to this amendment.2. Schedule D: Serviced Area is amended with the addition <strong>of</strong> a service area inAlcona North as shown on Schedule 2 to this amendment.3. A new ‘Schedule B16 – Alcona North Land Use <strong>Plan</strong>’ is hereby added.4. A new ‘Schedule B16 a – Natural Heritage Features’ is hereby added.5. A new ‘Schedule C4 – Alcona North Roads and Trails’ is hereby added.6. Additional definitions is added to Section 9.20 as follows and the subsequentdefinitions are renumbered accordingly:9.20.44 Public Service Facilities: means land, buildings and structures for theprovision <strong>of</strong> programs and services provided or subsidized by agovernment or other body, such as social assistance, recreation, policeand fire protection, health and educational programs, and culturalservices. Public service facilities do not include infrastructure.”7. The Official <strong>Plan</strong> is amended by adding a new Section 15.0 Alcona North<strong>Secondary</strong> <strong>Plan</strong> consisting <strong>of</strong> the following text and schedules and appendices:July 2013iii


TABLE OF CONTENTS15.1 GOALS AND OBJECTIVES........................................................................................................ 115.1.1 Goals .................................................................................................................................... 115.1.2 Objectives ............................................................................................................................. 115.2 CONCEPT .................................................................................................................................... 215.3 LAND USE PLAN ........................................................................................................................ 315.3.1 General ................................................................................................................................. 315.3.2 Residential Low Density 1 (RD1)......................................................................................... 315.3.3 Residential Low Density 2 (RD2)......................................................................................... 415.3.4 Residential Medium Density ................................................................................................. 415.3.5 Neighbourhood Commercial ................................................................................................ 515.3.6 Highway Commercial ........................................................................................................... 615.3.7 Mixed Use............................................................................................................................. 615.3.8 Light Industrial Service ........................................................................................................ 715.3.9 Institutional .......................................................................................................................... 715.3.10 Parks and Open Space ......................................................................................................... 815.3.11 Natural Environmental Area ................................................................................................ 815.3.12 Special Policy Area .............................................................................................................. 915.3.13 Stormwater Management Facilities ....................................................................................1015.4 SUSTAINABILITY ...........................................................................................................................1115.5 CULTURAL HERITAGE ...................................................................................................................1215.6 TRANSPORTATION ........................................................................................................................1215.6.1 Trails ...................................................................................................................................1315.7 MUNICIPAL SERVICES ...................................................................................................................1315.7.1 General ................................................................................................................................1315.7.2 Sanitary Servicing ...............................................................................................................1415.7.3 Water Supply .......................................................................................................................1415.7.4 Drainage and Stormwater Management .............................................................................1415.8 URBAN DESIGN POLICIES .............................................................................................................1515.8.1 Neighbourhood Structure ....................................................................................................1515.8.2 Site and Building Design .....................................................................................................1615.8.3 Parking and Access .............................................................................................................1715.8.4 Views and Gateways ............................................................................................................1715.8.5 Landscape Master <strong>Plan</strong> .......................................................................................................1715.9 DEVELOPMENT REVIEW ................................................................................................................1815.9.1 Tree Preservation Study ......................................................................................................1815.9.2 Functional Servicing Study .................................................................................................1815.9.3 Master Hydrogeological Study ............................................................................................1915.9.4 Archaeological Study ..........................................................................................................2015.9.5 Conservation Authority Regulations ...................................................................................2015.9.6 Noise and Vibration ............................................................................................................2015.10 IMPLEMENTATION ....................................................................................................................2115.10.1 Municipal Services – Phasing and Allocation .....................................................................2115.10.2 Cost Sharing ........................................................................................................................2215.10.3 Development Agreement......................................................................................................2315.10.4 Processing Development Applications ................................................................................2315.10.5 Zoning By-law Conformity ..................................................................................................2315.10.6 Site <strong>Plan</strong> Requirement .........................................................................................................2415.10.7 Holding (H) Provisions .......................................................................................................2415.10.8 Phasing <strong>Policies</strong> ..................................................................................................................2415.10.9 Development Charges .........................................................................................................2515.11 INTERPRETATION ......................................................................................................................26July 2013iv


15.0 SECONDARY PLAN FOR ALCONA NORTH(PRATT)15.1 GOALS AND OBJECTIVES15.1.1 Goalsa) To ensure that future growth in the <strong>Secondary</strong> <strong>Plan</strong> area occurs with a view to achieving ahealthy community including a mix <strong>of</strong> uses, housing types and densities and incorporatinglow impact design measures.b) To create a compact walkable neighbourhood that can support transit and where residentshave access to a connected network <strong>of</strong> parks, which will act as focal points within theneighbourhood.c) To ensure that future growth in the <strong>Secondary</strong> <strong>Plan</strong> area does not constitute a financialburden to the municipality, and that development occurs within the financial and physicalcapability <strong>of</strong> the municipality.d) To ensure that development takes place in an orderly manner and that the sequence <strong>of</strong>development is logical, cost efficient, in line with population allocations, and provides for thenecessary municipal facilities, services and infrastructure in each phase.15.1.2 Objectivesa) To further the general goals and principles <strong>of</strong> the Official <strong>Plan</strong>, and the specific goals <strong>of</strong> theAlcona North <strong>Secondary</strong> <strong>Plan</strong> (Pratt) by providing a detailed policy framework for futuredevelopment, and setting forth detailed land use, servicing, and implementation policies,including development review criteria and principles to guide future development in theAlcona North <strong>Secondary</strong> <strong>Plan</strong> (Pratt) area.b) To develop a residential neighbourhood while also providing for commercial opportunitiesfor the residents <strong>of</strong> the neighbourhood as well as residents <strong>of</strong> Alcona and surrounding area.c) To provide a range <strong>of</strong> housing types and densities catering to differing needs within themunicipality.d) To accommodate parks, recreational facilities and institutional facilities <strong>of</strong> sufficient size,location, and configuration to meet the needs <strong>of</strong> residents and achieve a walkablecommunity design. Community and neighbourhood parks distributed throughout theresidential neighbourhoods will act as connected focal points within the community. TheMixed Use area will contain a publicly accessible plaza.e) To implement low impact design measures where possible.f) To provide commitments to long term flood diversion measures to reduce downstreamflooding and improve water quality from the wider Alcona North <strong>Secondary</strong> <strong>Plan</strong> (landsJanuary 2012 1


outside <strong>of</strong> Pratt) and beyond, consistent with the requirements <strong>of</strong> the Lake SimcoeProtection <strong>Plan</strong>.g) To ensure that the drainage and storm water management systems in the Alcona North<strong>Secondary</strong> <strong>Plan</strong> Area (Pratt) are designed and constructed to control floodwaters in order toreduce down-stream flooding and treat the quality <strong>of</strong> stormwater in accordance with theLake Simcoe Protection <strong>Plan</strong>.h) To ensure that adequate water supply, sewage collection, electrical supply, and storm waterdrainage systems are provided in line with the phasing <strong>of</strong> residential and commercialgrowth.i) To integrate new development within the <strong>Secondary</strong> <strong>Plan</strong> area with adjacent existingdevelopment and provide for a compatible relationship with abutting existing land uses.j) To ensure that the provision <strong>of</strong> servicing and infrastructure does not constitute a financialburden on the municipality, and that growth occurs within the financial and physicalcapability <strong>of</strong> the municipality.k) To develop a road system consisting <strong>of</strong> arterial, collector and local roads that creates a gridsystem <strong>of</strong> connected streets to facilitate efficient automobile and bicycle travel andcomfortable and walkable pedestrian travel while supporting future transit.m) To maintain the hydrologic function <strong>of</strong> the adjacent Leonard’s Beach wetland in order toprotect its health and function.15.2 CONCEPTThe Alcona North <strong>Secondary</strong> <strong>Plan</strong> Area (Pratt) provides for two neighbourhoods bisected by alarge natural environmental area. The eastern neighbourhood will be primarily residential andwill serve as an extension <strong>of</strong> the existing residential neighbourhoods to the south. It will bebound on two sides by significant environmental features and appropriate buffering andtransition will be required adjacent to these features.The western neighbourhood will consist <strong>of</strong> a combination <strong>of</strong> commercial and residential useswith the commercial uses focused at the intersection <strong>of</strong> the 20 th Sideroad and the east-westcollector road.A trail system is conceptually delineated on Schedule C4. It is intended to use the naturalenvironment features as a connecting spine with connections to the rest <strong>of</strong> Alcona while alsoconnecting to parks and stormwater management ponds through the <strong>Secondary</strong> <strong>Plan</strong> Area viathe road and sidewalk network.A “Gateway” will be created at the corner <strong>of</strong> the 20 th Sideroad and the Ninth Line providing arecognizable landscaped northern entrance to Alcona.January 2012 2


Stormwater will be controlled through a number <strong>of</strong> measures as set out in the Master Drainage<strong>Plan</strong> to reduce downstream flooding.The <strong>Secondary</strong> <strong>Plan</strong> Area is designed to achieve a overall gross density <strong>of</strong> 50 persons and jobsper hectare which is consistent with the average target <strong>of</strong> 32 persons and jobs per hectarerequired by the approved but not yet in effect Official <strong>Plan</strong> for the County <strong>of</strong> Simcoe.It is anticipated that the <strong>Secondary</strong> <strong>Plan</strong> Area will provide for a population <strong>of</strong> approximately5,500 people and employment <strong>of</strong> 850.15.3 LAND USE PLAN15.3.1 Generala) The Land Use designations for the Alcona North <strong>Secondary</strong> <strong>Plan</strong> (Pratt) area are identifiedon Schedule B16 - Land Use <strong>Plan</strong>, which should be read in conjunction with the policies <strong>of</strong>this <strong>Secondary</strong> <strong>Plan</strong> and other relevant policies <strong>of</strong> the <strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> Official <strong>Plan</strong>.b) Lands within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> (Pratt) area will consist <strong>of</strong> a mix <strong>of</strong> housingtypes and densities, a mixed use node, employment and commercial facilities servingadjacent neighbourhoods and the broader Alcona community and parks and open spaces.c) New development shall generally be permitted only on the basis <strong>of</strong> full municipal sanitarysewer, water, and storm water services.d) Interim servicing for existing lots or consents may be permitted, at the discretion <strong>of</strong> the<strong>Town</strong>, provided such interim servicing is disconnected when full municipal sanitary and/orwater services are available and the landowner contributes to the applicable developmentcharges, hook up charges, and cost sharing, where applicable, for the full municipalservices.15.3.2 Residential Low Density 1 (RD1)a) Lands within the Residential Low Density One Area (RD1) shall be developed in accordancewith the policies <strong>of</strong> Section 3.3.5 and the additional policies <strong>of</strong> this Section.b) Where new designated Residential lands abut existing or planned Commercial uses,appropriate separation, buffering, screening, landscaping and/or berming are required tomitigate any potential adverse impact upon the new residential uses.c) The density in the RD1 designation shall generally not exceed 12.5 units per net residentialhectare.d) Where this designation abuts an established residential area, new lots in this designationshall serve as a transition between the established residential area and the new residentialarea. As such, new lots abutting established residential areas shall be compatible in terms<strong>of</strong> lot widths with the abutting existing lots and provide opportunities for tree retention alongcommon boundaries.January 2012 3


e) Residential development adjacent to boundary arterial or collector roads shall be designedto be aesthetically pleasing, provide a high quality character through enhanced boulevardlandscaping and a variety <strong>of</strong> built forms and housing styles to mitigate the view <strong>of</strong> buildingmass and , be sensitive to road conditions such as noise levels, and safety considerationssuch as sight lines and visibility from entrances and driveways. Adequate buffering andnoise mitigation measures shall be provided.e) Places <strong>of</strong> worship are permitted on lands designated Residential Low Density One (RD1)subject to the approval <strong>of</strong> a site specific zoning by-law amendment.15.3.3 Residential Low Density 2 (RD2)a) Lands within the Residential Low Density Two (RD2) shall be developed in accordance withthe policies <strong>of</strong> Section 3.3.6 and the additional policies <strong>of</strong> this Section.b) Density on lands designated ‘Residential Low Density Two shall be within a range <strong>of</strong> 12.5 to25 units per net hectare.c) The permitted net density range specified in subsection b) may be averaged over the totallands designated RD2 in each neighbourhood.d) Residential development adjacent to boundary arterial or collector roads shall be designedto be aesthetically pleasing and provide a high quality character through enhancedboulevard landscaping and a variety <strong>of</strong> built forms and housing styles to mitigate the view <strong>of</strong>building mass and be sensitive to road conditions such as noise levels, and safetyconsiderations such as sight lines and visibility from entrances and driveways. Adequatebuffering and noise amelioration measures shall be provided.e) Places <strong>of</strong> worship are permitted on lands designated Residential Low Density Two (RD2)subject to the approval <strong>of</strong> a site specific zoning by-law amendment.15.3.4 Residential Medium Densitya) Lands within the Residential Medium Density area shall be developed in accordance withthe policies <strong>of</strong> Section 3.3.7 and the additional policies <strong>of</strong> this Section. The ResidentialMedium Density designation shown on Schedule B16 – Alcona North Land Use <strong>Plan</strong> isconceptual and subject to adjustments at the rezoning stage without amendment to this<strong>Plan</strong>.b) A maximum <strong>of</strong> 25% <strong>of</strong> the units in any Medium Density designation may consist <strong>of</strong> small lotsingle detached dwellings intermixed with other permitted housing forms in the designation.c) The implementing zoning by-law shall also establish a minimum lot frontage <strong>of</strong> 6 metres forstreet townhouses that contain integrated front garages in order to provide for sufficient onstreetparking.d) Ground related multiple attached buildings should not contain more than 8 dwelling units.January 2012 4


e) The maximum height <strong>of</strong> street townhouse buildings shall not exceed two and a half (2.5)storeys. A basement or a walk-out condition is not considered a storey. Stackedtownhouse buildings shall not exceed a height <strong>of</strong> three and a half (3.5) storeys.f) It is intended that sites containing residential medium density housing be developed withhigh standards <strong>of</strong> residential amenity and visual aesthetics as per Sections 5 and 15.8 andsubject to Architectural Control as per Section 5.9.2.2.g) Residential Medium Density housing shall provide adequate open space, landscaped areas,and recreation facilities for their occupants.h) Adequate on-site parking shall be provided for residents and visitors, subject to the urbandesign provisions <strong>of</strong> this <strong>Secondary</strong> <strong>Plan</strong>. Common parking areas, where provided, shall beappropriately screened with consideration given to safety and visual impact on thesurrounding land and roadways.15.3.5 Neighbourhood Commerciala) Within the Neighbourhood Commercial designation shown on Schedule B16 – Land Use,lands shall be developed in accordance with the policies <strong>of</strong> Section 3.4.2 and the additionalpolicies <strong>of</strong> this Section.b) In addition to the uses permitted by Section 3.4.2.1 for Neighbourhood Commercial Areas,the following uses shall also be permitted:i) Live/work and residential uses on the upper storeys <strong>of</strong> <strong>of</strong>fice and retail and servicecommercial uses.ii)iii)Auto services including a gas bar but excluding an auto body shop.Places <strong>of</strong> worship.c) The retail and service commercial uses shall provide for a maximum <strong>of</strong> 15,000 sq. m. <strong>of</strong>floor space. This floor space shall be phased in tangent with the phasing <strong>of</strong> populationgrowth. Despite this maximum floor space, a detailed concept plan and market demand andimpact study shall be submitted to the satisfaction <strong>of</strong> the <strong>Town</strong> with any application forrezoning for commercial use within this designation. The purpose <strong>of</strong> the market demandand impact study is to identify the phasing and timing <strong>of</strong> development in order to ensure thatcommercial uses develop in accordance with the timing <strong>of</strong> population growth within theAlcona North <strong>Secondary</strong> <strong>Plan</strong> Area. The Study is not intended to be a retail demandanalysis, nor is it intended to ultimately restrict the uses permitted by the Official <strong>Plan</strong>.d) The maximum height <strong>of</strong> mixed commercial/ residential uses including live/work buildingsshall not exceed three and a half (3.5) stories. In the context <strong>of</strong> this policy, a storey shall notinclude a basement or a walkout basement.e) On-street parking should also be considered in addition to on-site parking. The on-siteparking requirements will be reduced for the corresponding on-street parking provided.f) Development in this designation should be integrated into the street network <strong>of</strong> theneighbourhood. Smaller buildings should be located up to and oriented to the street toJanuary 2012 5


provide a strong street presence along Leslie Drive. Larger floor plate stores should beoriented to the interior portions <strong>of</strong> a site.g) For those buildings located close to the street, the principal entrances shall face thesidewalk and provide direct access onto the public sidewalk so as to create a pleasantpedestrian shopping environment. The primary windows and signage shall also face thestreet.15.3.6 Highway Commerciala) Within the Highway Commercial designation shown on Schedule B16 – Land Use, landsshall be developed in accordance with the policies <strong>of</strong> Section 3.4.3.b) In addition to the permitted uses listed in Section 3.4.3, Places <strong>of</strong> Worship are alsopermitted on lands designated Highway Commercial.15.3.7 Mixed Usea) Lands designated Mixed Use are intended to provide a variety <strong>of</strong> retail, service communityand residential uses in a mixed-use pedestrian-friendly setting that will serve the needs <strong>of</strong>the community. Within the Mixed Use designation shown on Schedule B16 – Alcona NorthLand Use <strong>Plan</strong>, lands shall be developed in accordance with the policies <strong>of</strong> this Section andother relevant policies <strong>of</strong> this <strong>Plan</strong>.b) Permitted uses in the Mixed Use designation include:i. Mixed residential/commercial buildings and live/work uses.ii.iii.iv.Medium density residential uses in accordance with Policy 15.3.4 <strong>of</strong> this <strong>Plan</strong>.A full range <strong>of</strong> retail uses, including convenience stores, designed to cater to the dayto-dayand weekly shopping needs and service requirements <strong>of</strong> the area residents.Offices and research and development facilities including medical <strong>of</strong>fices and clinics.v. Personal services.vi.vii.viii.ix.Entertainment and eating establishments.Nursing homes, retirement homes and long-term care facilities.Parkettes, village squares, libraries and other public facilities.Places <strong>of</strong> worship.x. Public utilities, emergency services and municipal uses.xi.xii.xiii.xiv.Other uses considered accessory to a main use.Auto services including a gas bar but excluding an auto body shop.Day care establishment.Library.c) The area should be developed with a view to maximizing its attractiveness andconvenience to pedestrians. It is intended that these areas be developed orredeveloped as a unified, attractive, relatively compact, and readily accessible area.January 2012 6


d) Buildings should have a consistent minimal and maximum setback to promote pedestrianscale. A generally continuous building face is recommended to establish a unifiedstreetscape.e) Development shall minimize the impact <strong>of</strong> <strong>of</strong>f-street parking on pedestrian streetscapes bylocating <strong>of</strong>f-street parking at the rear, side or to the interior <strong>of</strong> the block. Safe, convenient andwell lit pedestrian access shall be provided to the street from such parking areas. Whereparking is provided to the side <strong>of</strong> buildings and abutting the street, they should be screenedwith low walls and landscape materials to provide a sense <strong>of</strong> enclosure along the setbackline.f) Adequate screening in the form <strong>of</strong> landscaping and fencing shall be provided adjacent toabutting residential designations, to minimize adverse impact on abutting residentialproperties.g) Mixed residential/commercial buildings should be permitted and encouraged. Mixedresidential/ commercial buildings shall provide a transition in heights and densities toadjacent residential designations including increased setbacks from the property line <strong>of</strong>such adjacent designations. Such buildings should be brought up to the street in whichthey front, but should be stepped back from the front wall above 2 storeys or incorporateother similar design element.h) Loading areas shall be provided at the rear <strong>of</strong> the buildings, while screening <strong>of</strong> suchareas from abutting residential designations.15.3.8 Light Industrial Servicea) Within the Light Industrial Service designation shown on Schedule B16 – Land Use, landsshall be developed in accordance with the policies <strong>of</strong> Section 3.5.3.15.3.9 InstitutionalWithin the Institutional designation shown on Schedule B16 – Land Use, lands shall bedeveloped in accordance with the policies <strong>of</strong> Section 3.9 and the additional policies <strong>of</strong> thisSection.a) The location, size, and configuration <strong>of</strong> the school sites identified on Schedule B16 – LandUse are conceptual only and will be confirmed in consultation with the School Boards priorto draft plan approval <strong>of</strong> the subdivisions in the neighbourhood in which the new school sitesare shown on Schedule B16. The location <strong>of</strong> school sites on the land use schedule may bemodified without an amendment to this <strong>Plan</strong>.b) Applications for amendment to the Zoning By-law to permit elementary schools will beassessed on the basis <strong>of</strong> conformity with the following criteria:i) frontage and access on a collector road;ii) the site is situated on a segment <strong>of</strong> roadway with good visibility and with sufficientfrontage to meet the standards <strong>of</strong> the respective school board;iii) the school forms a campus with parks or other public facilities wherever possible; andJanuary 2012 7


iv) residential driveways directly opposite school sites are minimized wherever possible inorder to minimize conflicts with local traffic.c) Where any site designated for a school on Schedule B16 – Land Use is declared surplus orwhere a school designation is relocated, the site may be utilized for residential uses <strong>of</strong> theadjacent residential designation subject to the policies <strong>of</strong> that designation.15.3.10 Parks and Open Spacea) Lands designated ‘Parks and Open Space’ shall be developed in accordance with thepolicies <strong>of</strong> Section 3.10 and the additional policies <strong>of</strong> this Section.b) The Parks and Open Space designation shown on Schedule A – A l c o n a N o r t hLand Use <strong>Plan</strong> include four centrally located neighbourhood parks. Parks and OpenSpace areas are intended to be focal points <strong>of</strong> the community and owned by a publicauthority.c) The location and size <strong>of</strong> parks shown on Schedule B16 – Alcona North Land Use <strong>Plan</strong>, mayvary without requiring an amendment to this plan. However, any variation <strong>of</strong> the location <strong>of</strong>the parks should reflect the intent to maintain a balanced distribution <strong>of</strong> parks and having apark generally within a comfortable walking distance <strong>of</strong> residents within the secondary planarea.d) Parkettes are permitted and may be developed as passive, non-programmed spacesproviding for playgrounds and seating areas. The optimal size for a parkette is 0.25 to 0.5hectares.e) In addition to Section 3.10.7, parks may be developed by the landowner, where agreed toby the <strong>Town</strong>, to the <strong>Town</strong>’s specifications as set out in the subdivision agreements for newdevelopments with consideration for development charge credit.15.3.11 Natural Environmental Areaa) Within the Natural Environmental Area designation shown on Schedule B16 – Land Use,lands shall be developed in accordance with the policies <strong>of</strong> Section 3.1.1 and the additionalpolicies <strong>of</strong> this Section.b) In addition to the features included within the Natural Environmental Area designation inSection 3.1.1.1, features considered part <strong>of</strong> the Key Natural Heritage Feature classificationand the Key Hydrologic Features classification shall also be included within the NaturalEnvironmental Area designation.c) Despite Section 3.1.1.10, no development shall be permitted within a Natural EnvironmentalDesignation as per the Lake Simcoe Protection <strong>Plan</strong>.d) In addition to Section 3.1.1.4, infrastructure may be permitted to cross a NaturalEnvironmental Area designation if the need for the project has been demonstrated throughan Environmental Assessment or other similar environmental approval, and there is no otherreasonable alternative.January 2012 8


e) As required by Section 3.1.1.6, the boundaries <strong>of</strong> lands designated "Natural EnvironmentalArea" on Schedule B-16 are approximate and shall be further refined through staking <strong>of</strong> thelimits <strong>of</strong> the key natural heritage feature as part <strong>of</strong> an Environmental Impact Study (EIS)submitted in support <strong>of</strong> an application for <strong>Draft</strong> <strong>Plan</strong> <strong>of</strong> Subdivision.f) Despite Section 3.1.1.7, a minimum 30 metre vegetation protection zone shall beprovided around key natural heritage features included within the Natural EnvironmentalArea designation ands such area shall be composed <strong>of</strong> and maintained as natural selfsustainingvegetation.g) Despite Sections 3.1.1.10 and 3.1.1.11, any application for development or sitealteration, other than that permitted by Sections 3.1.1.4 and 15.3.11 d), within 120metres <strong>of</strong> a Natural Environmental Area designation shall be accompanied by a naturalheritage evaluation which meets the requirements <strong>of</strong> Section 6.26-DP <strong>of</strong> the LakeSimcoe Protection <strong>Plan</strong> and Section 9.10 <strong>of</strong> this <strong>Plan</strong>.h) As part <strong>of</strong> a natural heritage evaluation or EIS submitted in support <strong>of</strong> an application fordraft plan approval, an amphibian breeding survey shall be undertaken followingappropriate protocols. As part <strong>of</strong> this study, ponds should be mapped to ensure there iscomplete understanding <strong>of</strong> linkages between breeding and non-breeding habitats, and todetermine whether the Significant Woodlands also function as Significant WildlifeHabitat.i) As part <strong>of</strong> a natural heritage evaluation or EIS submitted in support <strong>of</strong> an application fordraft plan approval, plant species that are rare in the watershed should be mapped todetermine if there are concentrations that would qualify an area as Significant WildlifeHabitat according to the Official <strong>Plan</strong> and Provincial Policy Statement.j) Due to the increase in impermeable surfaces from development and the decrease ingroundwater recharge and surface flows, the potential for impact to adjacent hydrologicalfeatures particularly the Leonard’s Beach Swamp provincially significant wetland needsto be further assessed. As set out in Section 15.9.3, a water budget is to be prepared forthe secondary plan area and is to address the impact on the provincially significantwetland. Once this study has been completed, the change shall be analyzed from anecological perspective to evaluate if the changes will impact natural features or theirfunctions, particularly amphibian breeding habitat.15.3.12 Special Policy Areaa) Special Policy Areas are an overlay designation as shown on Schedules B16 and B16a.These areas represent natural features where additional study is required to determine ifsuch features are significant and require protection or whether they can be included withinthe development area. Until such studies are conducted, no development shall be permittedin these features or on adjacent lands within 30 meters <strong>of</strong> these features.b) Development may be permitted within these features, subject to further study specific toeach Special Policy Area delineated on Schedule B16a and as specified as follows:i) For Special Policy Areas One and Two on Schedule B16a, further study is required todetermine if the flow <strong>of</strong> water in the streams is due to the water table being above theJanuary 2012 9


stream bottom. If that is the case, these streams will be classified as intermittentstreams and will require protection under the Lake Simcoe Protection <strong>Plan</strong>. To makethis determination, a full year <strong>of</strong> monitoring <strong>of</strong> the watertable at these features shall beconducted. This will require the installation <strong>of</strong> at least one piezometer or transducerin each feature, preferably with the depth <strong>of</strong> the water table being recorded with adatalogger; andii) For Special Policy Area Three on Schedule B16a, the butternut trees within thiswoodlot need to be assessed by a designated Butternut Health Assessor to determinewhether these species are affected by Butternut Canker and are retainable. If thesebutternut trees are retainable, the woodlot within which they are located will beconsidered significant and shall be protected from development. If they aredetermined not to be retainable and a permit for removal is obtained from the Ministry<strong>of</strong> Natural Resources, the lands can be developed according to the underlyingdesignation.c) If it is determined through further study that a Special Policy Area contains a key naturalheritage feature or key hydrologic features that should be protected, the implementingzoning by-law shall zone these features as “Environmental Protection”.15.3.13 Stormwater Management Facilitiesa) Stormwater Management Facilities are shown schematically on Schedule B16 – AlconaNorth Land Use <strong>Plan</strong>, but are permitted in all land use designations except NaturalEnvironmental Areas. Stormwater Management Facilities shall be used to controlstormwater quality, quantity, and downstream erosion in accordance with approvedProvincial, LSRCA and <strong>Town</strong> criteria and where feasible reduce downstream flooding. Aswell, such facilities may provide for trail connections or ecological linkages in accordancewith the policies <strong>of</strong> this <strong>Plan</strong>.c) Stormwater management ponds are generally discouraged where there are Low ImpactDevelopment alternatives that may eliminate or reduce their size. New development shallconsider the implementation <strong>of</strong> enhanced streetscapes to provide additional width within themunicipal right <strong>of</strong> way for the purpose <strong>of</strong> facilitating potential LID measures such as bio-retentionswales, which promote infiltration and improved storm water quality/quantity control at thesubdivision stage.c) The location and size <strong>of</strong> storm water management ponds shown on Schedule B16 - areapproximate and can be changed without amendment to this plan. Where a storm watermanagement pond is moved or reduced in size, the adjacent or nearest urban designationshall apply to the area where the storm water management pond was formerly located onSchedule B16.d) The general size requirements for the storm water management ponds were establishedthrough the Alcona North Master Drainage <strong>Plan</strong>. The size <strong>of</strong> some <strong>of</strong> the ponds have beenenlarged in an effort to reduce downstream flooding from current levels.e) The specific size and location <strong>of</strong> storm water management ponds shall be establishedthrough a Functional Servicing Study prepared in support <strong>of</strong> applications for <strong>Draft</strong> <strong>Plan</strong> <strong>of</strong>January 2012 10


Subdivision. Such study shall be prepared in accordance with the Master Drainage <strong>Plan</strong>and address the matters listed in Section 15.7.4 b) and demonstrate conformity with theLake Simcoe Protection <strong>Plan</strong> and in particular Section 4.8-DP.f) The Stormwater Management <strong>Plan</strong>, prepared as part <strong>of</strong> the Functional Servicing Study asper Section 15.9.2, shall also incorporate a naturalized design using native plant species inconsultation with LSRCA, as well as accommodate a trail system where appropriate.g) Lands required for stormwater management facilities shown on Schedule B16 shall bededicated, at no cost, to the municipality.h) The <strong>Town</strong> may consider the establishment <strong>of</strong> interim stormwater management facilities on atemporary basis within the <strong>Secondary</strong> <strong>Plan</strong> area, notwithstanding the underlying land usedesignation for the lands, provided the interim facilities do not preclude or prejudice futuredevelopment on the basis <strong>of</strong> the land use designations shown on Schedule B16.15.4 SUSTAINABILITYa) In addition to the energy conservation and water resource policies <strong>of</strong> Sections 4.5 and 4.7,the following additional policies shall also apply.b) Where appropriate and subject to topographical and servicing requirements, plans <strong>of</strong>subdivision should be designed to maximize the number <strong>of</strong> lots with a north southorientation.c) The use <strong>of</strong> vegetation to reduce energy consumption <strong>of</strong> buildings shall be encouraged.d) <strong>Plan</strong>s <strong>of</strong> subdivision shall be designed to encourage pedestrian and cycling travel through:i) a modified grid system <strong>of</strong> roads;ii) block lengths generally not exceeding 250 metres in length;iii) a connected and efficient pedestrian and cycling network;iv) strong connections between the residential neighbourhoods and existing residentialneighbourhoods to the south;v) incorporation <strong>of</strong> mixed uses where feasible;vi) dedicated bicycle lands where necessary and feasible;vii) creation <strong>of</strong> pleasant pedestrian walking environments through wide sidewalks,landscaping, lighting, streetscape character and animated street life.e) <strong>Plan</strong>s <strong>of</strong> subdivision shall be designed to provide the opportunity for transit use.f) Energy efficient building design including passive solar energy gain, increased insulation,Energy Star appliances, and alternative energy systems among other initiatives, shall beencouraged in all new buildings.g) An assessment <strong>of</strong> the low impact design considerations shall be submitted in support <strong>of</strong>subdivision applications.January 2012 11


15.5 CULTURAL HERITAGEa) In addition to the cultural heritage and archaeology policies <strong>of</strong> Section 6, the followingadditional policies shall also apply.b) Where possible and feasible, surviving elements <strong>of</strong> the rural agricultural landscape suchas tree lines, fences, hedgerows, associated with roadscapes should be maintained andincorporated into the development.c) Significant mature hedgerows dividing fields should be considered for retention and usedto form a framework for development, where possible and feasible.d) Opportunities for interpreting the history <strong>of</strong> the area should be pursued, including streetnaming and interpretive plaques.15.6 TRANSPORTATIONa) In addition to the Transportation and Transit policies <strong>of</strong> Section 8, the following additionalpolicies shall also apply.b) The proposed road network for the Alcona North <strong>Secondary</strong> <strong>Plan</strong> area is shown onSchedule C4 - Roads and Trails. The road classification in the Alcona North <strong>Secondary</strong> <strong>Plan</strong>shall consist <strong>of</strong> Arterial Roads, Collector Roads and Local Roads. Collector roads shown onSchedule C4 are conceptual and the final alignment shall be determined throughimplementing draft plans <strong>of</strong> subdivision and /or Class Environmental Assessments wererequired. This confirmation includes the proposed re-alignment <strong>of</strong> Sideline 20 and locationand configuration <strong>of</strong> the intersection <strong>of</strong> Webster Boulevard with Sideline 20.c) A Preliminary Traffic Study has been prepared in support <strong>of</strong> the Alcona North and South<strong>Secondary</strong> <strong>Plan</strong>s. At a preliminary level, it has identified the road needs within the entirety<strong>of</strong> Alcona and evaluated required road needs and intersection requirements external to the<strong>Secondary</strong> <strong>Plan</strong> area. The <strong>Town</strong> will complete a Master Transportation Study that will fullyevaluate the road needs and intersection improvements required, which will serve as thebasis for an update to the Development Charge By-law.d) A further traffic impact study shall be required as part <strong>of</strong> the Functional Servicing Study, asset out in Section 15.9.2 in accordance with the approved Master Transportation Study. Thetraffic impact study component <strong>of</strong> the Functional Servicing Study shall consider intersectiondesign requirements <strong>of</strong> the <strong>Town</strong> and demonstrate how the intersections can be designedand constructed to accommodate anticipated traffic demands.e) Roads classified as Arterial, Collector and local on Schedule C4 shall be build in accordanceto the right <strong>of</strong> way and access requirements <strong>of</strong> Section 8.f) Future transit is anticipated along the Arterial and Collector road network in the AlconaNorth <strong>Secondary</strong> <strong>Plan</strong> area. Consideration shall be given in subdivision designs to theaccommodation <strong>of</strong> future transit stops.January 2012 12


g) In addition to Section 8.1.4.6, reverse lotting shall be discouraged and may only bepermitted in short reaches or where the owner satisfies the <strong>Town</strong> that no other alternativedevelopment form or street patterns are feasible.h) In addition to Section 8.1.5.5, dedicated cycle lanes shall be provided on all Collector Roadsthrough the <strong>Secondary</strong> <strong>Plan</strong> Area.i) Collector Roads through the <strong>Secondary</strong> <strong>Plan</strong> Area shall contain a maximum <strong>of</strong> 2 throughlanes, provide for on-street parking on at least one side.15.6.1 Trailsa) The planned public trail system is schematically illustrated on Schedule C4. It uses parks,natural heritage features, valleylands, stormwater management ponds, and on and <strong>of</strong>f-streetlinkages to create a continuous system <strong>of</strong> pedestrian trails and bicycle routes.b) Adjustments to the trail system may be made including the addition or deletion <strong>of</strong> trailswithout amendment to this plan. The following principles shall apply to the development <strong>of</strong>such a trail system:i) The system shall respect the natural heritage features;ii) Trails will connect to residential development and link them to commercial areas, parks,and employment areas through the development <strong>of</strong> trails in Natural EnvironmentalAreas, buffers, parks, stormwater management ponds and the utilization <strong>of</strong> publicsidewalks;iii) Trails will be established in appropriate buffer and open space areas adjacent to and onboth sides <strong>of</strong> the rail line where possible;iv) North-south and east-west connections shall be encouraged in each neighbourhood andlinking to adjacent neighbourhoods; andv) Where feasible, trails will connect to the County <strong>of</strong> Simcoe trail system.c) A plan indicating how the trail system will be implemented through the draft plan <strong>of</strong>subdivision shall be submitted in support <strong>of</strong> an application for draft plan <strong>of</strong> subdivision.d) Where a trail is to be constructed in, and adjacent to, an Natural Environmental Area, andwhere not already addressed in the Management <strong>Plan</strong> as set out in Section 9.10.1 xi), thepreparation <strong>of</strong> an EIS shall be required to confirm the route, fencing and any requiredmitigation measures.15.7 MUNICIPAL SERVICES15.7.1 Generala) Municipal Services shall be provided to the Alcona North <strong>Secondary</strong> <strong>Plan</strong> in accordancewith an approved Master Servicing Study and the more detailed Functional ServicingStudies prepared in support <strong>of</strong> each draft plan <strong>of</strong> subdivision. The <strong>Town</strong>’s Master ServicingStrategies (water and sewer; drainage and stormwater management; and traffic) shall, at thediscretion <strong>of</strong> the <strong>Town</strong>, be updated in support <strong>of</strong> future planning applications to confirmJanuary 2012 13


infrastructure sizing and conformity with the <strong>Town</strong>-wide master servicing and transportationplans.b) In extending services to the Alcona North <strong>Secondary</strong> <strong>Plan</strong> area, where an agreement hasbeen reached with the municipality, developer(s) shall provide adjacent existing unservicedor partially serviced residences with the opportunity to connect to the municipal servicingsystem.c) The cost <strong>of</strong> providing full municipal services to facilitate the development <strong>of</strong> land within theAlcona North <strong>Secondary</strong> <strong>Plan</strong> area shall be borne by current and future benefiting parties.This shall be achieved through the site plan or subdivision approval process whereappropriate provision will be made for using development charges, front ending agreementsand cost-sharing.d) The design <strong>of</strong> municipal services shall incorporate measures that minimize impacts on thegroundwater system and impacts on natural features.e) In the design <strong>of</strong> municipal services, where required, such services shall be appropriatelyintegrated with the surrounding servicing network.15.7.2 Sanitary Servicinga) The <strong>Town</strong> shall monitor the available sewage treatment capacity and shall allocate capacityin accordance with Sections 7.1.10 and 15.10.1 and future plant expansion requirements.15.7.3 Water Supplya) The <strong>Town</strong> shall monitor the available water treatment capacity and shall allocate capacity inthe <strong>Secondary</strong> <strong>Plan</strong> area in accordance with Sections 7.1.10 and 15.10.1 and future plantexpansion requirements.15.7.4 Drainage and Stormwater Managementa) Develop an updated SWM plan that addresses internal servicing and downstream floodingissues and complies with the <strong>Innisfil</strong> Creek Subwatershed <strong>Plan</strong>, the Master Drainage <strong>Plan</strong>,and Section 7.2.b) As required by Section 7.2.3, the Alcona North Master Drainage <strong>Plan</strong> has identified meansto mitigate downstream flooding by setting a target <strong>of</strong> 20% flow over-control throughdownstream reaches <strong>of</strong> the streams in Alcona North which can be achieved through:i) 80% over control <strong>of</strong> on-site ponds within the <strong>Secondary</strong> <strong>Plan</strong> Area;ii) The implementation <strong>of</strong> flow control from external lands can beimplemented to reduce the on-site over-control requirements (e.g. 15%flow reduction <strong>of</strong> external drainage through an <strong>of</strong>f-site stormwater pondsituated north <strong>of</strong> the 9th Line results in a 50% overcontrol requirementfor on-site ponds); andJanuary 2012 14


iii) or various combinations <strong>of</strong> the above measures to achieve the 20%flow controltarget.d) Replacement or improvement <strong>of</strong> the culverts crossing Sandy Trail and Somers Boulevardshould be investigated and recommended work completed prior to development in the<strong>Secondary</strong> <strong>Plan</strong> Area.e) A Functional Servicing Study shall be prepared in support <strong>of</strong> each draft plan <strong>of</strong> subdivisionin accordance with the study requirements set out n Section 15.9.2. Such study shallinclude a detailed stormwater management plan implementing the recommendations <strong>of</strong> theAlcona North Master Drainage <strong>Plan</strong>.f) In addition to the Best Management Practices <strong>of</strong> Section 7.2.4, reduction <strong>of</strong> stormwaterrun<strong>of</strong>f volume and pollutant loadings is encouraged through:i) Implementation <strong>of</strong> a hierarchy <strong>of</strong> source, lot-level, conveyance and end-<strong>of</strong>-pipecontrols;ii) Implementation <strong>of</strong> innovative stormwater management measures; andiii) Incorporation <strong>of</strong> alternative community design and stormwater techniques throughsite plan design, lot grading, ditches and curbing, road widths, road and drivewaysurfaces, and the use <strong>of</strong> open space as temporary detention ponds.15.8 URBAN DESIGN POLICIESa) <strong>Plan</strong>s <strong>of</strong> subdivision shall conform to the relevant design policies <strong>of</strong> Section 5 and theadditional policies <strong>of</strong> this Section.b) Urban design guidelines shall be prepared for the Alcona North <strong>Secondary</strong> <strong>Plan</strong> prior todraft plan approval <strong>of</strong> the first draft plan within the <strong>Secondary</strong> <strong>Plan</strong> Area. The urbandesign guidelines shall be based on the policies <strong>of</strong> Section 5 as well as the additionalpolicies <strong>of</strong> this Section.15.8.1 Neighbourhood Structurea) In addition to the Neighbourhood Structure policies <strong>of</strong> Section 5.2.1, the following policiesshall also apply.b) New development should emphasize a walkable and pedestrian-friendly scale.c) Subdivision design shall be sensitive to the topography and natural landscape byincorporating strong visual and physical links to natural features.d) Preservation <strong>of</strong> significant vegetation including tree lines and hedgerows along lot lines orstreets shall be encouraged where possible and feasible.January 2012 15


e) Residential development adjacent to arterial roads shall be designed to be sensitive to therural character <strong>of</strong> adjacent areas and provide a suitable transition from urban areas to rurallands.g) Residential development adjacent to the existing community area should be sensitive tophysical character and provide a suitable transition.15.8.2 Site and Building Designa) In addition to the Site <strong>Plan</strong>ning and Built Form policies <strong>of</strong> Sections 5.6.2 and 5.6.3, thefollowing policies shall also apply.b) Diversity <strong>of</strong> housing and lot type shall be applied within neighbourhoods, and distributed in abalanced fashion to avoid the predominance <strong>of</strong> a single house or lot type. As well, a variety<strong>of</strong> housing elevations shall be encouraged within each residential block to provide aninteresting streetscape.c) The distribution <strong>of</strong> lot and housing types in neighbourhoods will be configured to createsmooth transitions and avoid abrupt massing changes within streetscapes, and unsuitablerelationships with existing residential areas.d) Building design shall screen views <strong>of</strong> mechanical equipment from the street through ro<strong>of</strong>design or the use <strong>of</strong> other architectural features such as parapets or screens.e) For commercial, and institutional facades, large exposed blank walls should be avoided. Allvisible sides <strong>of</strong> a building should be treated in a similar fashion to the front <strong>of</strong> the building. Ahigh quality <strong>of</strong> architectural design shall be promoted through inclusion <strong>of</strong> entranceelements, windows, articulated wall areas and ro<strong>of</strong> expression. Where blank exposed wallsare unavoidable, screening through landscaping will be required.f) Building entrances should be visibly well defined and accessible to pedestrians and thedisabled, as provided for in the Building and Fire Codes.g) Where townhousing is proposed, a mix <strong>of</strong> long and short townhouse blocks, with amaximum <strong>of</strong> 8 units in a block, on public and private streets shall be encouraged to providevariety to the streetscape. The massing <strong>of</strong> long townhouse blocks should be broken up witha variation <strong>of</strong> lengths and facades so that a single monotonous elevation is not created.The zoning by-law shall contain standards controlling this circumstance.h) Design <strong>of</strong> buildings should emphasize the building, not the car or parking areas. In low andmedium density residential areas, the implementing Zoning By-law shall contain provisionsrestricting the extent <strong>of</strong> garage protrusions.i) Residential density and massing at settlement edges shall be appropriate to thecharacteristics <strong>of</strong> adjacent lands and to the detailed design <strong>of</strong> the edge condition to ensuresmooth transitions. Where the edge <strong>of</strong> new development abuts existing neighbourhoods,density, massing and lot frontages shall respond to the character <strong>of</strong> the existing condition.January 2012 16


15.8.3 Parking and Accessa) The linking <strong>of</strong> parking areas, driveways and access points should be encouraged tominimize the number <strong>of</strong> access points to arterial roads subject to applicable municipal bylaws.Mutual entrances will be encouraged and clearly identified.b) Offset intersections will be discouraged. Where possible, driveways and access points onopposite sides <strong>of</strong> the major street should be aligned.c) Appropriate parking provision shall be made to accommodate the disabled.d) Within commercial areas, smaller parking areas divided by landscaped islands and stripsshould be provided. The visual impact <strong>of</strong> parking lots should be s<strong>of</strong>tened through the use <strong>of</strong>berming and vegetation, where appropriate.e) Major loading and delivery areas and garbage enclosures should be screened or confined tothe rear <strong>of</strong> the building(s).f) Direct vehicular access to individual street townhouse units from collector roads shall bediscouraged.f) Municipal parking and/or commercial parking shall be considered and permitted within theMixed Use area.15.8.4 Views and Gatewaysa) In addition to the Views, Community Edges, Gateways and Landmarks policies <strong>of</strong> Section5.7, the entry point to Alcona North at the 9 th Line and Sideline 20 shall function as agateway within the urban pattern. Design <strong>of</strong> development at this location shall recognizethis function with a high quality <strong>of</strong> architectural and landscape development including entryfeatures in the street boulevard.b) Wherever possible, new development shall be designed such that parks and open spacesform terminus <strong>of</strong> views.c) Parks and parkettes are fundamental components <strong>of</strong> the neighbourhood structure in theAlcona North <strong>Secondary</strong> <strong>Plan</strong>. On this basis, these parks should assist in the identification <strong>of</strong>specific neighbourhoods through urban design and landscape architecture.15.8.5 Landscape Master <strong>Plan</strong>a) Landscape Master <strong>Plan</strong>s shall be prepared as a condition <strong>of</strong> draft plan approval, subject tothe approval <strong>of</strong> the <strong>Town</strong> with provision for development charge credit. The LandscapeMaster <strong>Plan</strong> shall address the landscape design <strong>of</strong> parks, parkettes, public street right <strong>of</strong>way, entrances and gateways and consider the urban design themes and elementsdeveloped in the Urban Design Guidelines.January 2012 17


15.9 DEVELOPMENT REVIEW15.9.1 Tree Preservation Studya) A Tree Preservation Study approved by the <strong>Town</strong> shall be required as a condition <strong>of</strong> draftplan approval in order to identify trees that are not part <strong>of</strong> a protected Natural EnvironmentalArea and explore opportunities for their protection and incorporation into the subdivisiondesign. Such study shall be considered as part <strong>of</strong> detailed grading design.b) The tree preservation study shall consider vegetation along the boundary <strong>of</strong> the subject landsand its role in upholding the urban design policies <strong>of</strong> the Official <strong>Plan</strong> together with providing forappropriate transition between new and existing development. Where appropriate to thesatisfaction <strong>of</strong> the <strong>Town</strong>, transitional lots along the periphery <strong>of</strong> the subject lands will incorporateexisting vegetation buffers for the purposes <strong>of</strong> tree preservation.15.9.2 Functional Servicing Studya) A Functional Servicing Study (FSS) shall be prepared, to the satisfaction <strong>of</strong> the <strong>Town</strong>, insupport <strong>of</strong> an application for draft plan <strong>of</strong> subdivision approval. The FSS will include apreferred servicing strategy based on an analysis <strong>of</strong> servicing requirements, in accordancewith the approved Master Servicing Study and shall also address:i) servicing design requirements;ii) existing developed areas and potential intensification areas;iii) internal and external drainage areas;iv) preliminary sizing <strong>of</strong> water and wastewater infrastructure;v) layout for roads and other transportation systems including trails;vi) preliminary costs <strong>of</strong> trunk infrastructure;vii) utility needs;viii) preparation <strong>of</strong> a Stormwater Management <strong>Plan</strong> which addresses the matters set out inSection 15.9.2 c);ix) identification and refinement <strong>of</strong> infiltration areas as well as mechanisms and measures,to increase infiltration in such areas and to maintain or improve the existing hydrologicfunction to the provincially significant wetland features and natural heritage features toensure no negative impact;x) demonstrate general conformity with the recommendations <strong>of</strong> the Master ServicingStudy and identify where deviations are warranted, if any;xi) methods and measures to maintain the hydrologic function to natural heritage features;andxii) incorporation <strong>of</strong> mitigation measures recommended in the EIS and HydrogeologicalStudy related to servicing, stormwater management, groundwater infiltration anddischarge, and grading.b) To assist in the review <strong>of</strong> the Functional Servicing Study, the <strong>Town</strong> may retain a peer reviewconsultant at the expense <strong>of</strong> the proponent.c) As part <strong>of</strong> the Functional Servicing Study, a Storm Water Management <strong>Plan</strong> shall beprepared which:January 2012 18


i) demonstrates general conformity with the recommendations <strong>of</strong> the Alcona North MasterDrainage <strong>Plan</strong>;ii) identifies where deviations are warranted, if any;iii) provides supporting technical analyses for appropriate location, sizing and design <strong>of</strong>proposed storm water management facilities;iv) provides further detail on water quality objectives set out under the Lake SimcoeProtection <strong>Plan</strong>;v) assesses downstream erosion criteria;vi) provides further detail on the recommended means to reduce downstream as set out inthe Master Drainage <strong>Plan</strong> and means <strong>of</strong> implementation by the developmentcommunity;viii) demonstrates how an integrated treatment train approach will be used to minimizestormwater management flows and reliance on end-<strong>of</strong>-pipe controls;ix) demonstrates how anticipated changes in the water balance between predevelopmentand post-development will be minimized, andiix) demonstrates how anticipated changes in phosphorous loadings between predevelopmentand post-development will be minimized.15.9.3 Master Hydrogeological Studya) A Master Hydrogeological Study shall be prepared, to the satisfaction <strong>of</strong> the <strong>Town</strong> inconsultation with the LSRCA, for the entirety <strong>of</strong> the <strong>Secondary</strong> <strong>Plan</strong> Area. It shall besubmitted for approval prior to submission <strong>of</strong> draft plan <strong>of</strong> subdivision applications and shallbe based on terms <strong>of</strong> reference approved by the <strong>Town</strong> in consultation with the LSRCA,which addresses, but is not limited to, the following matters:i) a pre and post development water budget based on the land use plan;ii) analysis <strong>of</strong> the impacts <strong>of</strong> soil compaction on groundwater recharge;iii) identification <strong>of</strong> infiltration areas and areas contributing to infiltration areas;iv) identification <strong>of</strong> mitigation measures to maintain pre-development infiltration anddischarge including an assessment <strong>of</strong> how the use <strong>of</strong> infiltration areas can bemaximized in the design <strong>of</strong> the draft plans <strong>of</strong> subdivision;v) assessment <strong>of</strong> potential dewatering requirements;vi) identification and evaluation <strong>of</strong> methods and mechanisms that work towardsmaintaining the hydrologic function to ensure the sustenance <strong>of</strong> and no negative impactto the adjacent provincially significant wetland;vii) assessment <strong>of</strong> the impact on the water table <strong>of</strong> other natural heritage features, as wellas base flow to watercourses and means to mitigate the impacts;viii) further assessment <strong>of</strong> the aquifer vulnerability in the secondary plan area in the context<strong>of</strong> the observed elevated nitrate level in the deep monitor BH6-1 and recommendationsfor reducing or eliminating the potential for groundwater contamination;ix) recommendations for a monitoring programme to address monitoring during and afterconstruction; andx) assessment <strong>of</strong> risk to the Stroud Municipal Wells for the northwestern edge <strong>of</strong> thesubject lands based on the land uses proposed for that area.January 2012 19


) To assist in the review <strong>of</strong> the Hydrogeological Study, the <strong>Town</strong> may retain a peer reviewconsultant at the expense <strong>of</strong> the proponent.c) Recommendations from the hydrogeological study shall be used as the basis <strong>of</strong> moredetailed hydrogeological analyses in the functional servicing plans in support <strong>of</strong> draft plans<strong>of</strong> subdivision. As part <strong>of</strong> the functional servicing plan, a detailed water balance updateshall be completed which takes into account the grading plan, site servicing details, on-sitesoil testing, and the lotting and density proposed in the draft plan <strong>of</strong> subdivision.d) Should dewatering and/or permanent lowering <strong>of</strong> the groundwater table be required forconstruction purposes, the anticipated impacts should be accounted for in a detailed waterbalance analysis and impact assessment. Recommendations for mitigation measuresshould be included in the detailed hydrogeological report to ensure maintenance <strong>of</strong> thehydrological function <strong>of</strong> the property and associated hydrological features. Suchrecommendations should be incorporated into the <strong>Draft</strong> <strong>Plan</strong> and Site <strong>Plan</strong>s whereapplicable.e) A well survey shall be conducted within and 500 metres <strong>of</strong> the boundaries <strong>of</strong> the <strong>Secondary</strong><strong>Plan</strong> area prior to draft plan approval. A subsequent well monitoring programme shall beestablished as a condition <strong>of</strong> draft plan approval.15.9.4 Archaeological StudyA Stage 2 archaeological survey (field based assessment) shall be completed by a registeredarchaeological consultant as a condition <strong>of</strong> <strong>Draft</strong> <strong>Plan</strong> <strong>of</strong> Subdivision approval to the satisfaction<strong>of</strong> the Ministry <strong>of</strong> Culture and Recreation. In the event that these surveys discoverarchaeological sites, a study, as a minimum, shall include an examination <strong>of</strong> the site, adescription <strong>of</strong> the artifacts discovered on site, an evaluation <strong>of</strong> the significance <strong>of</strong> any artifactsdiscovered on site, and recommendations for mitigative measures. Such measures mayinclude preservation by avoidance or mitigation by salvage excavation in advance <strong>of</strong>development.15.9.5 Conservation Authority RegulationsThe LSRCA has a Development, Interference with Wetlands and Alterations to Shorelines andWatercourses Regulation (Ontario Regulation 179/06) that replaces the former Fill Regulation.These areas are illustrated in Appendix C. These regulated areas include floodplains,watercourse meander belts, steep slopes, wetlands, and lands within 120 metres <strong>of</strong> ProvinciallySignificant Wetlands and 30 metres <strong>of</strong> other wetlands. The LSRCA requires a permit to beissued prior to development, site alteration, interference with wetlands and alterations towatercourses within the regulation limits.15.9.6 Noise and Vibrationa) Potential noise sources within the <strong>Secondary</strong> <strong>Plan</strong> area include but may not be limited to:i) The 20 th Sideroad;ii) The GO Rail line;iii) The Neighbourhood Commercial designation;iv) The Light Industrial Service designation; andJanuary 2012 20


v) The Mixed Use designation.b) Where residential development is located within proximity to the facilities listed in subsectiona), proponents will be required to undertake noise analysis reports prior to draft plan <strong>of</strong>subdivision approval. Such studies shall use recognized noise and prediction techniquesand incorporate appropriate mitigation measures to minimize impacts. The noise reportshall be prepared to the satisfaction <strong>of</strong> the <strong>Town</strong> in consultation with the railway whereapplicable.c) The Noise Analysis Report shall contain an assessment <strong>of</strong> noise levels to which theproposed uses will be subjected before and after abatement measures are installed, for theexisting and anticipated situation during both day time and night time hours.d) Where anticipated indoor and/or outdoor sound levels in a proposed development willexceed the Ministry <strong>of</strong> Environment noise level guidelines, tenants or purchasers shall benotified through a warning clause inserted within the registerable parts <strong>of</strong> plans <strong>of</strong>subdivision.e) Where noise mitigation is required, consideration shall be given to requirements for brickveneer, central air-conditioning, window treatment, berming, acoustic fences and separationdistances. However, along the 20 th Sideroad, reverse-fronting lots and acoustical barrierswill be discouraged and only permitted in limited circumstances where other possiblemitigation measures are not viable.f) Where acoustical barriers (fence and/or earth berming) are required, such barriers shall besolid. Any gaps at the base <strong>of</strong> the acoustic fence must be minimized and localized so as notto significantly affect the acoustical performance <strong>of</strong> the barrier. The construction material foracoustical barriers will be in accordance with the Ministry <strong>of</strong> the Environment’s guidelines.15.10 IMPLEMENTATION15.10.1 Municipal Services – Phasing and Allocationa) Development shall only proceed when full municipal services, water, sanitary sewer andstorm drainage facilities are or will be made available to serve all or parts <strong>of</strong> the <strong>Secondary</strong><strong>Plan</strong> Area, to the standards <strong>of</strong> the <strong>Town</strong>, and as provided in the <strong>Town</strong> Wide Water andWastewater Master Servicing <strong>Plan</strong> and the Alcona North Master Drainage <strong>Plan</strong>.b) The <strong>Town</strong> has conducted sufficient analysis to satisfy itself that the Lakeshore wastewatertreatment plant can reasonably be expected to be expanded to service development andinfill within the existing designated service area as well as the settlement expansion areas incompliance with the plant's current approved Certificate <strong>of</strong> Approval discharge quality limits.Alcona North is within the settlement expansion service areac) If sufficient servicing capacity is not available for all or part <strong>of</strong> the <strong>Secondary</strong> <strong>Plan</strong> Area atthe time <strong>of</strong> draft plan approval, such deficiencies shall be identified during the draft plan <strong>of</strong>subdivision review process. Allocation <strong>of</strong> servicing capacity shall be a condition <strong>of</strong> draft planapproval; registration shall proceed for only those plans or portions there<strong>of</strong> that haveallocation.January 2012 21


d) Municipal services shall be designed to meet the current standards in place at the time the<strong>Town</strong> reviews complete engineering submissions including detailed engineering drawings,reports and calculations.e) The overall phasing <strong>of</strong> new development within the <strong>Secondary</strong> <strong>Plan</strong> area will consider the<strong>Town</strong> Wide Water and Wastewater Master Servicing <strong>Plan</strong>, in order to achieve cost andservicing efficiencies when municipal services are built, upgraded or expanded.f) New development shall be deferred in the event that capacity is not available at theLakeshore Wastewater Treatment <strong>Plan</strong>t and/or at the Lakeshore Water Treatment <strong>Plan</strong>t.g) To address subsections e) and f) and where the <strong>Town</strong> has any concern regarding theavailability <strong>of</strong> services, development approval may be subject to a Holding “H” By-lawpursuant to Section 36 <strong>of</strong> the <strong>Plan</strong>ning Act, with provisions in that By-law that clearlyindicate the circumstances under which it will be lifted (i.e. certification <strong>of</strong> an engineer andapproval by the <strong>Town</strong> that services are or will be available).h) Where draft plan approval is to be granted, conditions <strong>of</strong> draft plan approval shall indicatethat no commitment to servicing allocation is provided until prior to registration; and that thesubdivision may not be registered if servicing capacity is not available. The plan may beregistered in phases, depending on servicing capacity. Allocation will be provided pursuantto Council Resolution.i) The subdivision agreement may require the owner not to apply for building permits untilcertification that services are available for the particular lot in question, and that the owneracknowledges that building permits are not required to be issued in such circumstance andadvise prospective purchasers.15.10.2 Cost Sharinga) To ensure that property owners in the Alcona North <strong>Secondary</strong> <strong>Plan</strong> Area contributeequitably towards the provisions <strong>of</strong> community and infrastructure facilities such ascommunity use lands, parks, and local infrastructure facilities or public works (i.e. oversizing) and including roads, sanitary, water and storm water facilities, financing and indexingadjustments, all property owners, within the <strong>Secondary</strong> <strong>Plan</strong> Area and interested indeveloping their lands, shall be required to enter into a cost sharing agreement as acondition <strong>of</strong> development approval for their lands, providing for the equitable distribution <strong>of</strong>the costs (including lands) <strong>of</strong> the aforementioned community and common public facilitieswhere such costs are not dealt with under the Development Charges Act.b) Prior to the approval <strong>of</strong> a development application within the <strong>Secondary</strong> <strong>Plan</strong> area, the <strong>Town</strong>shall require the landowner to enter into an agreement as set out in Section 15.10.2 a). Forthose facilities not <strong>of</strong> community wide benefit, costs will only be allocated to thoselandowners who are benefited by the specified work.c) The cost sharing agreement shall be prepared to the <strong>Town</strong>’s satisfaction and circulated tothe <strong>Town</strong> prior to finalization.d) It is recognized that the cost sharing agreement will establish rights for landowners toconnect to the services within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> area provided suchJanuary 2012 22


landowners pay their fair share <strong>of</strong> the expenses. Furthermore, it is recognized thatlandowners may seek to secure easement rights across adjacent properties in the<strong>Secondary</strong> <strong>Plan</strong> area in order to provide the necessary municipal services to adjacent lands.e) The provision and timing <strong>of</strong> municipal facilities and infrastructure will be at the <strong>Town</strong>’sdiscretion acting reasonably. The timing <strong>of</strong> municipal facilities and infrastructure that are tobe provided by individual property owners shall be set out in development agreements.The cost sharing agreement shall not fetter the <strong>Town</strong>’s ability or timing to obtain suchmunicipal facilities through the development agreements.f) The Cost Sharing Agreement(s) may be registered on title for each participating landownerand the covenants and obligations <strong>of</strong> the Cost Sharing Agreement survive any transfer inownership <strong>of</strong> a relevant parcel <strong>of</strong> land.g) As a condition <strong>of</strong> draft approval the approval authority will require a letter <strong>of</strong> clearance fromthe trustee <strong>of</strong> the cost share group confirming that the landowner is in good standing withrespect to their financial obligations under the terms <strong>of</strong> the cost sharing agreement.15.10.3 Development Agreementa) Prior to draft plan approval, the owners may be required to enter into one or moredevelopment agreements with the <strong>Town</strong> with respect to providing required <strong>Town</strong>infrastructure.15.10.4 Processing Development Applicationsa) Processing <strong>of</strong> individual plans <strong>of</strong> subdivision under Section 51 <strong>of</strong> the <strong>Plan</strong>ning Act will beundertaken in accordance with the policies set out in this <strong>Secondary</strong> <strong>Plan</strong>. Where anapplication for a new plan <strong>of</strong> subdivision is received on lands abutting a residential areaexisting on the date <strong>of</strong> approval <strong>of</strong> Section 15 <strong>of</strong> the Official <strong>Plan</strong>, the <strong>Town</strong> shall endeavourto notify the residents primarily affected as part <strong>of</strong> the process <strong>of</strong> considering the subdivisionplan.b) Prior to the draft approval <strong>of</strong> any plan <strong>of</strong> subdivision, the studies set out in this <strong>Plan</strong> as beingrequired prior to draft plan approval shall be prepared to the satisfaction <strong>of</strong> the <strong>Town</strong>including the delineation and staking <strong>of</strong> any Natural Environmental Area and the delineation<strong>of</strong> any floodplain within the plan <strong>of</strong> subdivision.c) The <strong>Town</strong> will process all development applications within the Alcona North <strong>Secondary</strong><strong>Plan</strong>; however, the issuance <strong>of</strong> final approval <strong>of</strong> any application will be subject to thephasing policies contained in Section 15.10.8 <strong>of</strong> this <strong>Plan</strong>.15.10.5 Zoning By-law Conformitya) Amendment(s) to the <strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> Zoning By-law will be required to implement thepolicies <strong>of</strong> this <strong>Secondary</strong> <strong>Plan</strong>.January 2012 23


15.10.6 Site <strong>Plan</strong> Requirementa) All development within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> area shall be subject to Site <strong>Plan</strong>Control under Section 41 <strong>of</strong> the <strong>Plan</strong>ning Act with the exception <strong>of</strong> single detached, semidetachedand duplex housing.15.10.7 Holding (H) Provisionsa) Lands within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> area may be subject to the Holdingprovisions under Section 36 <strong>of</strong> the <strong>Plan</strong>ning Act, and the Hold symbol maybe lifted inaccordance with the provisions <strong>of</strong> Section 3.7 and Section 15.10.8 c), including theavailability <strong>of</strong> sanitary and water treatment capacity and the requirements <strong>of</strong> Section15.10.1.15.10.8 Phasing <strong>Policies</strong>a) Development within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> may requiring phasing to ensure thatpopulation growth within the <strong>Town</strong> does not exceed the forecasts contained within theGrowth <strong>Plan</strong> for the Greater Golden Horseshoe.b) To implement Policy 15.10.8 a) above, the <strong>Town</strong> intends on preparing a Phasing andPopulation Allocation Policy for development applications. The <strong>Town</strong> recognizes thepotential that multiple applications may compete for population allocation under Schedule 7<strong>of</strong> the Growth <strong>Plan</strong>. For this reason, and until such time as the <strong>Town</strong>-wide Phasing andPopulation Allocation Policy is approved and in-effect, the following interim phasing policies,taken in part from Section 3.5.11 <strong>of</strong> the County Official <strong>Plan</strong>, will be used to evaluatecompeting applications. In addition, these policies will govern the issuance <strong>of</strong> final approval<strong>of</strong> applications within the Alcona North <strong>Secondary</strong> <strong>Plan</strong>:i) How the applications fall within the <strong>Town</strong>’s Settlement Hierarchy.ii)iii)iv)Whether municipal sewage and water capacity is available.Whether an Environmental Assessment, if required, has been completed for anyservicing proposal.Which application best contributes to developing the <strong>Town</strong> as a CompleteCommunity.v) Which proposal includes mixed use, with both residential and employment.vi)vii)viii)ix)Whether the applications represent Brownfield redevelopment.Whether the applications contain affordable housing units.Whether the applications protect natural heritage features and system, if anyfeatures are identified.Whether the applications reduce the financial burden on the <strong>Town</strong>.January 2012 24


x) Whether the applications adversely affect the <strong>Town</strong>’s ability to achieve itsintensification target under the Growth <strong>Plan</strong>.xi)xii)Whether the application represents a logical progression <strong>of</strong> continuous development.Whether the application contains Low Impact Design features that minimize the size<strong>of</strong> stormwater management ponds and whether the stormwater design improvesdownstream flooding.c) Development <strong>of</strong> any parcel <strong>of</strong> land within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> area shall notreceive final draft approval until such time as storm water, sanitary sewer, water facilitiesand utilities necessary to serve the parcel are available or provision has been madesatisfactory to the municipality, to make them available.d) A Holding Zone provision (“H”) may be applied to ensure that construction <strong>of</strong> newdevelopment does not commence until the matters in Section 15.10.8 b) have beenaddressed for each sub-phase as required.e) The approval <strong>of</strong> specific development applications in the Alcona North <strong>Secondary</strong> <strong>Plan</strong> areashall be governed by the following principles:i) avoidance <strong>of</strong> scattered development;ii) sequential development <strong>of</strong> neighbourhood areas;iii) provision <strong>of</strong> school sites and parks;iv) sequential construction <strong>of</strong> collector roads and access to arterial and boundary roads;v) sequential construction <strong>of</strong> sanitary sewer and watermain extensions and electricaldistribution system and any sub-phasing as contemplated by Section 15.10.1 e); andvi) the adequacy <strong>of</strong> storm drainage.f) As per Section 2.5.14 and 2.5.15, development within any phase shall not occur until the<strong>Town</strong> Wide Water and Wastewater Master Servicing <strong>Plan</strong> is completed, an updatedDevelopment Charges By-law is approved, the studies outlined in Section 15.9 arecompleted , and that the servicing <strong>of</strong> the subject lands supports, or does not impede, theservicing <strong>of</strong> the <strong>Innisfil</strong> Heights Economic District Expansion Area and a financing strategyfor the <strong>Innisfil</strong> Heights Economic District to the satisfaction <strong>of</strong> the <strong>Town</strong>.g) Notwithstanding Section 2.5.14, 2.5.15, and 15.10.8f) development on lands designatedLight Industrial Service, Neighbourhood Commercial Area and Highway Commercial Area,may proceed subject only to the study requirements noted in Section 15.9.15.10.9 Development Chargesa) Works within the Alcona North <strong>Secondary</strong> <strong>Plan</strong> Area include both local services (i.e. to be adirect developer responsibility) and works that are considered shared and eligible for costrecovery through the Development Charge By-law (non-local).b) Prior to revising the Development Charges By-law, the <strong>Town</strong> shall determine, based on theapproved <strong>Town</strong> Wide Water and Wastewater Master Servicing <strong>Plan</strong>, those works andservices within the <strong>Secondary</strong> <strong>Plan</strong> Area which are local and which are non-local.January 2012 25


c) In the event that the Development Charges By-law funded infrastructure has not beeninstalled when a developer wishes to proceed, the <strong>Town</strong> and developers may enter int<strong>of</strong>ront end finance agreement(s) in order to secure development infrastructure in advance <strong>of</strong>the timing identified in the <strong>Town</strong>’s Capital Forecast.15.11 INTERPRETATIONa) The Alcona North <strong>Secondary</strong> <strong>Plan</strong> policies <strong>of</strong> Section 15 are intended to be consistent withthe goals, policies, provisions and the land use designations set out in other parts <strong>of</strong> this<strong>Plan</strong>. In the event <strong>of</strong> a conflict between other policies <strong>of</strong> the Official <strong>Plan</strong> and the policies <strong>of</strong>this Section 15, the policies, provisions and designations in this Section 15 shall prevail.b) All population and other statistics are approximate except those concerning the maximumdensities, and shall be regarded as flexible.January 2012 26