02.12.2012 Views

Annual Report 2010/11 - Sonova

Annual Report 2010/11 - Sonova

Annual Report 2010/11 - Sonova

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

worKinG<br />

– and communicating safely in tunnels<br />

A project of superlatives: at 57 kilometers long,<br />

the Gotthard Tunnel is the longest construction site in the world.<br />

The project, which in the future will allow travelers to get<br />

from Zurich to Milan in less than three hours, is scheduled<br />

to be completed by 2017.<br />

Strabag Switzerland received the contract to expand two<br />

20-kilometer sections of the tunnel – a huge project involving<br />

a number of challenges and high safety requirements<br />

for workers. In particular, workers’ hearing has to be protected<br />

in the tunnel. The drilling often generates sound levels<br />

of around 100 decibels, which can permanently damage<br />

the ear.<br />

Strabag sought a solution that would effectively protect<br />

hearing while still allowing the team to communicate<br />

with each other and with their foreman. Their search led<br />

them to the professional hearing protection solutions from<br />

Phonak: the customized Serenity System has a special filter<br />

that enables workers to talk to each other without removing<br />

their hearing protection – eliminating any risk to their hearing,<br />

even when jackhammers are in use.<br />

The workers quickly got used to their new hearing protection,<br />

which they wear for up to eight hours a day – while<br />

drilling, making group decisions and even during short breaks<br />

in the tunnel. Safety Manager Daniel Schäublin has thus<br />

come one step closer to realizing his goal of ensuring that<br />

all employees complete the project with their hearing intact.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!