Annual Report 2010/11 - Sonova
Annual Report 2010/11 - Sonova
Annual Report 2010/11 - Sonova
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
worKinG<br />
– and communicating safely in tunnels<br />
A project of superlatives: at 57 kilometers long,<br />
the Gotthard Tunnel is the longest construction site in the world.<br />
The project, which in the future will allow travelers to get<br />
from Zurich to Milan in less than three hours, is scheduled<br />
to be completed by 2017.<br />
Strabag Switzerland received the contract to expand two<br />
20-kilometer sections of the tunnel – a huge project involving<br />
a number of challenges and high safety requirements<br />
for workers. In particular, workers’ hearing has to be protected<br />
in the tunnel. The drilling often generates sound levels<br />
of around 100 decibels, which can permanently damage<br />
the ear.<br />
Strabag sought a solution that would effectively protect<br />
hearing while still allowing the team to communicate<br />
with each other and with their foreman. Their search led<br />
them to the professional hearing protection solutions from<br />
Phonak: the customized Serenity System has a special filter<br />
that enables workers to talk to each other without removing<br />
their hearing protection – eliminating any risk to their hearing,<br />
even when jackhammers are in use.<br />
The workers quickly got used to their new hearing protection,<br />
which they wear for up to eight hours a day – while<br />
drilling, making group decisions and even during short breaks<br />
in the tunnel. Safety Manager Daniel Schäublin has thus<br />
come one step closer to realizing his goal of ensuring that<br />
all employees complete the project with their hearing intact.