01.12.2012 Views

OXFORD EMPLOYMENT LAND STUDY APPENDICES March 2006

OXFORD EMPLOYMENT LAND STUDY APPENDICES March 2006

OXFORD EMPLOYMENT LAND STUDY APPENDICES March 2006

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Development Site: Reference Area (ha)<br />

HYTHE BRIDGE STREET, <strong>OXFORD</strong> CITY<br />

CENTRE<br />

DS. 33<br />

0.88<br />

Criteria Comment Score<br />

(out of 5)<br />

Current Use Underused commercial Buildings<br />

Strategic Access<br />

Within City Centre 2-3km from Botley Interchange (A420) 2<br />

Local Road Access<br />

Public Transport Access<br />

Access to services &<br />

labour<br />

Proximity to incompatible<br />

uses<br />

Site characteristics<br />

Development constraints<br />

General attractiveness<br />

Planning Factors<br />

Suitability for Designated<br />

Uses<br />

[Scoring: 5 = best, 1 = worst]<br />

On busy, non-residential road which is congested at one end queues 2<br />

from the junction with Park End Street.<br />

Within City Centre location, with full range of bus routes of varying 5<br />

frequencies available<br />

Within close proximity to City Centre with full range of services, as 4<br />

well as residential areas<br />

Adjacent to other City Centre uses; limited residential uses nearby 4<br />

Level site, reasonably regular in shape. Good size 4<br />

No known constraints, other than Conservation Area nearby 4<br />

Prominent location on approach to City Centre. Poor quality and 3<br />

condition of premises and surroundings. Limited parking/access<br />

Designated development site for any of retail, A3, student 2<br />

accommodation, leisure, B1(a) uses. Street specific shopping<br />

frontage and within CCAA and adjacent to Conservation Area<br />

Unattractive secondary office area with some potential for small office units but<br />

much vacant space and designation for other uses gives no certainty office<br />

element would be developed<br />

TOTAL SCORE: 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!