12.07.2015 Views

LBB 1965/00 Plena Message Manager - WES Components

LBB 1965/00 Plena Message Manager - WES Components

LBB 1965/00 Plena Message Manager - WES Components

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Plena</strong> <strong>Message</strong> <strong>Manager</strong> | Installation and Operating Manual | Installation in racken | 112 Installation in rack<strong>Plena</strong> <strong>Message</strong> <strong>Manager</strong>Figure 2.1The message manager is delivered for tabletop use, but you can mount it in a 19" rack using the brackets suppliedwith the unit. In case of rack mounting, you must:• remove the 4 feet from the bottom of the unit. Without the feet, the unit is 1U high.• ensure that the ambient temperature of the unit in the rack does not exceed 55 °C.Bosch Security Systems | 2<strong>00</strong>3-09 | 9922 141 50502en

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!