12.07.2015 Views

(rfq) document for development of four laning of rewa ring road on ...

(rfq) document for development of four laning of rewa ring road on ...

(rfq) document for development of four laning of rewa ring road on ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RFQ <str<strong>on</strong>g>document</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>development</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> Four Laning <str<strong>on</strong>g>of</str<strong>on</strong>g> Rewa Ring Road <strong>on</strong> BOT (Toll + Annuity)basisBids from the remaining Bidders or annul the Bidding Process, as thecase may be.1.2.6 Du<str<strong>on</strong>g>ring</str<strong>on</strong>g> the Bid Stage, Bidders are invited to examine the Project ingreater detail, and to carry out, at their cost, such studies as may berequired <str<strong>on</strong>g>for</str<strong>on</strong>g> submitting their respective Bids <str<strong>on</strong>g>for</str<strong>on</strong>g> award <str<strong>on</strong>g>of</str<strong>on</strong>g> thec<strong>on</strong>cessi<strong>on</strong> including implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Project.1.2.7 As part <str<strong>on</strong>g>of</str<strong>on</strong>g> the Bidding Documents, the Authority will provide a draftC<strong>on</strong>cessi<strong>on</strong> Agreement and project report/ feasibility report preparedby the Authority/ its c<strong>on</strong>sultants and other in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> pertaining/relevant to the Project available with it.1.2.8 Bids will be invited <str<strong>on</strong>g>for</str<strong>on</strong>g> the Project <strong>on</strong> the basis <str<strong>on</strong>g>of</str<strong>on</strong>g> the lowest financialAnnuity (the "Annuity") required by a Bidder <str<strong>on</strong>g>for</str<strong>on</strong>g> implementingthe Project. The c<strong>on</strong>cessi<strong>on</strong> period shall be pre-determined, and willbe indicated in the draft C<strong>on</strong>cessi<strong>on</strong> Agreement <str<strong>on</strong>g>for</str<strong>on</strong>g>ming part <str<strong>on</strong>g>of</str<strong>on</strong>g> theBidding Documents. The Project shall be awarded to the Bidder quotingthe lowest Annuity.In this RFQ, the term “Highest Bidder” shall mean the Bidderis <str<strong>on</strong>g>of</str<strong>on</strong>g>fe<str<strong>on</strong>g>ring</str<strong>on</strong>g> the lowest Annuity.who1.2.9 The C<strong>on</strong>cessi<strong>on</strong>aire shall be entitled to levy and charge a predetermineduser fee from users <str<strong>on</strong>g>of</str<strong>on</strong>g> the Project under and inaccordance with the Toll Policy being followed in the State <str<strong>on</strong>g>of</str<strong>on</strong>g>Madhya Pradesh.1.2.10 Further and other details <str<strong>on</strong>g>of</str<strong>on</strong>g> the process to be followed at the BidStage and the terms there<str<strong>on</strong>g>of</str<strong>on</strong>g> will be spelt out in the BiddingDocuments.1.2.11 Any queries or request <str<strong>on</strong>g>for</str<strong>on</strong>g> additi<strong>on</strong>al in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> c<strong>on</strong>cerning thisRFQ shall be submitted in writing or by fax and e-mail to the<str<strong>on</strong>g>of</str<strong>on</strong>g>ficer designated in Clause below.The e nvelopes/communicati<strong>on</strong>s shall clearly bear the followingidentificati<strong>on</strong>/ title:________________________________________________________________________________________________________________________________NIT No. MPRDC/BOT (T+A)/PQ/2012/ 7783 Bhopal, dated 27.09.2012 - 9 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!