12.07.2015 Views

(rfq) document for development of four laning of rewa ring road on ...

(rfq) document for development of four laning of rewa ring road on ...

(rfq) document for development of four laning of rewa ring road on ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RFQ <str<strong>on</strong>g>document</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>development</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> Four Laning <str<strong>on</strong>g>of</str<strong>on</strong>g> Rewa Ring Road <strong>on</strong> BOT (Toll + Annuity)basisApplicants must satisfy themselves that they are qualified to bid, andshould give an undertaking to this effect in the <str<strong>on</strong>g>for</str<strong>on</strong>g>m at Appendix-I.1.2.2 In the Qualificati<strong>on</strong> Stage, Applicants would be required t<str<strong>on</strong>g>of</str<strong>on</strong>g>urnish all the in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> specified in this RFQ. Only thoseApplicants that are pre-qualified and short-listed by the Authority shallbe invited to submit their Bids <str<strong>on</strong>g>for</str<strong>on</strong>g> the Project. The Authority is likely toprovide a comparatively short time span <str<strong>on</strong>g>for</str<strong>on</strong>g> submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Bids <str<strong>on</strong>g>for</str<strong>on</strong>g>the Project. The Applicants are, there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, advised to visit the site andfamiliarize themselves with the Project.1.2.3 In the Bid Stage, the Bidders will be called up<strong>on</strong> to submit theirfinancial <str<strong>on</strong>g>of</str<strong>on</strong>g>fers (the "Bids") in accordance with the RFP and other<str<strong>on</strong>g>document</str<strong>on</strong>g>s to be provided by the Authority (collectively the "BiddingDocuments"). The Bidding Documents <str<strong>on</strong>g>for</str<strong>on</strong>g> the Project will be providedto every Bidder <strong>on</strong> payment <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs.50,000.00 (Rupees fifty thousand<strong>on</strong>ly). The Bid shall be valid <str<strong>on</strong>g>for</str<strong>on</strong>g> a period <str<strong>on</strong>g>of</str<strong>on</strong>g> not less than 120 daysfrom the date specified in Clause 1.3 <str<strong>on</strong>g>for</str<strong>on</strong>g> submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> bids (the“Bid Due Date”).1.2.4 In terms <str<strong>on</strong>g>of</str<strong>on</strong>g> the RFP, a Bidder will be required to deposit, al<strong>on</strong>g with itsBid, a bid security equivalent to R s . 6 7 . 0 0 l a c s (the "BidSecurity"), refundable no later than 60 (sixty) days from the BidDue Date, except in the case <str<strong>on</strong>g>of</str<strong>on</strong>g> the selected Bidder whose Bid Securityshall be retained till it has provided a Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance Security under theC<strong>on</strong>cessi<strong>on</strong> Agreement. The Bidders will have an opti<strong>on</strong> to provide BidSecurity in the <str<strong>on</strong>g>for</str<strong>on</strong>g>m <str<strong>on</strong>g>of</str<strong>on</strong>g> a demand draft or a bank guarantee acceptable tothe Authority and in such event, the validity period <str<strong>on</strong>g>of</str<strong>on</strong>g> the demand draftor bank guarantee, as the case may be, shall not be less than 180 (<strong>on</strong>ehundred and eighty) days from the Bid Due Date, inclusive <str<strong>on</strong>g>of</str<strong>on</strong>g> a claimperiod <str<strong>on</strong>g>of</str<strong>on</strong>g> 60 (sixty) days, and may be extended as may be mutuallyagreed between the Authority and the Bidder from time to time.The Bid shall be summarily rejected if it is not accompanied by the BidSecurity.1.2.5 Generally, the Highest Bidder shall be the selected Bidder. The remainingBidders shall be kept in reserve and may, in accordance with the processspecified in the RFP, be invited to match the Bid submitted by theHighest Bidder in case such Highest Bidder withdraws or is not selected<str<strong>on</strong>g>for</str<strong>on</strong>g> any reas<strong>on</strong>. In the event that n<strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> the other Bidders match the Bid<str<strong>on</strong>g>of</str<strong>on</strong>g> the Highest Bidder, the Authority may, in its discreti<strong>on</strong>, invite fresh________________________________________________________________________________________________________________________________NIT No. MPRDC/BOT (T+A)/PQ/2012/ 7783 Bhopal, dated 27.09.2012 - 8 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!