12.07.2015 Views

Track Record 27, April to June 2006 - Public Transport Victoria

Track Record 27, April to June 2006 - Public Transport Victoria

Track Record 27, April to June 2006 - Public Transport Victoria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Track</strong> <strong>Record</strong>Vic<strong>to</strong>ria’s <strong>Public</strong> <strong>Transport</strong> ServicesSECTION 2.PUNCTUALITY AND RELIABILITY2.1 Performance moni<strong>to</strong>ringEvery train and tram service in the timetable is moni<strong>to</strong>red every day of the week.Delays, cancellations and other service failures are measured <strong>to</strong> the nearest 60 seconds and ‘weighted’ according <strong>to</strong> thenumber of people estimated <strong>to</strong> be travelling on the particular train or tram.The passenger weightings vary according <strong>to</strong> the time period, day of week and direction of travel. Delays <strong>to</strong> a heavily loadedpeak train or tram are given a greater value than delays <strong>to</strong> a lesser loaded off-peak train or tram. This detailed systemprovides a measure of operational performance expressed in ‘passenger weighted minutes’ of delay.‘Passenger weighted minutes’ in each month are checked against performance targets that were set in the partnershipagreements. Performance against these targets determines whether a bonus or a penalty applies for a particular opera<strong>to</strong>r.New performance targets were set in July 2005 which require a significant reduction in ‘passenger weighted minutes’ ofdelay, compared <strong>to</strong> those measured in 1998, before bonus payments are made. The required improvements in performancefor metropolitan tram and train services are:• 31 per cent for metropolitan trams; and• 36 per cent for metropolitan trains.As detailed in Section 3.2, effective 1 July 2005, the V/Line Passenger performance moni<strong>to</strong>ring system was modified <strong>to</strong>concentrate on the incidence of unplanned service cancellations and short services – matters which are largely withinV/Line control. The revised arrangement applies for periods where disruptions associated with major projects significantlyaffect the on-time delivery of V/Line Passenger services.Metropolitan bus services are not included in this performance regime. Bus opera<strong>to</strong>rs provide performance data for busservices (‘on-time’ running and cancellations) via monthly Key Performance Indica<strong>to</strong>r returns.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!