12.07.2015 Views

Track Record 27, April to June 2006 - Public Transport Victoria

Track Record 27, April to June 2006 - Public Transport Victoria

Track Record 27, April to June 2006 - Public Transport Victoria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Track</strong> <strong>Record</strong>Vic<strong>to</strong>ria’s <strong>Public</strong> <strong>Transport</strong> ServicesTable 4 presents annual cancellation data for the eight-year period 1998–99 <strong>to</strong> 2005–06.Table 4. Financial year cancellations of trains, trams and buses as a % of services scheduled 151998- 1999- 2000- 2001- 2002- 2003- 2004- 2005-1999 2000 2001 2002 2003 2004 2005 16 <strong>2006</strong>17 18Metro trains 1.0 1.4 0.7 0.5 0.5 1.2 1.3 0.9V/Line Passenger 19 0.1 0.2 0.3 0.4 0.5 0.6 0.9 1.0Metro trams 1.5 1.2 0.7 0.4 0.4 0.4 0.6 0.3Metro buses 0.1 0.1 0.1 0.1 0.0 0.2 0.1 0.115 A reduction in services cancelled represents an improvement in performance. Please note that for the purposes of determining cus<strong>to</strong>mer compensation, franchiseesmay use different methodologies <strong>to</strong> calculate reliability (see Section 2.4).16 Financial Year on-time performance and cancellation figures for 2004 2005 include the impacts of a severe s<strong>to</strong>rm that hit the greater Melbourne area on 2, 3 and4 February 2005.17 Please note that metropolitan train and tram, and V/Line Passenger punctuality and reliability results are presented excluding the period of the CommonwealthGames (15 <strong>to</strong> 26 March <strong>2006</strong>). The Games period required significant service alterations (including the creation of new and merged routes, and additional services) andthere was significant disruption associated with high numbers of passengers using public transport <strong>to</strong> get <strong>to</strong> or from events.18 Due <strong>to</strong> data capture issues, the measure for trams excludes performance on 22 and 24 <strong>June</strong> <strong>2006</strong>. These measures will be updated on receipt of correctinformation.19 Refers <strong>to</strong> V/Line Passenger train services.11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!