12.07.2015 Views

Phase 1 System Requirement Specification - The Square Kilometre ...

Phase 1 System Requirement Specification - The Square Kilometre ...

Phase 1 System Requirement Specification - The Square Kilometre ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Roadmap to the SRRSPDO• Detailed review, refinement andnegotiation of the SKA 1 DRM• Develop Use Cases for each ofthe chapters of the SKA 1 DRM tounderstand and extract thetechnical requirements• Gather, refine and analyse thesystem requirements• Development and refinement ofthe science and supportOperations concepts• Derive environmental andregulatory requirements andconstraints• Continue to document therequirements and constraints inthe SKA 1 <strong>System</strong> <strong>Requirement</strong><strong>Specification</strong> under ChangeControl• Making them available to Domains on aplanned basis• Establish a lower level DocumentTree• Establish a preliminary VerificationPlan– This includes introducing specialbudgetary control requirements• Conduct Domain Concept DesignReviews• Consider the outputs of theDomain CoDRs at theObservatory level.– This will include models of aspectssuch as cost, performance, power,reliability etc.• Establish further Observatory levelcost models to assist convergenceon an outline full lifecycle cost• Develop the SKA 1 architecturaldesign document

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!