12.07.2015 Views

Guidelines for domestic marketing

Guidelines for domestic marketing

Guidelines for domestic marketing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.0 Components of AssistanceIn the backdrop of the above, the following areas have been identified <strong>for</strong> the development of<strong>domestic</strong> fish <strong>marketing</strong> system in the country:• Modernisation of wholesale markets• Cold chains of hygienic retail outlets of varying levels• Schemes under rural development <strong>for</strong> promoting women and weaker sections in<strong>domestic</strong> fish <strong>marketing</strong>2.1 Modernisation of wholesale marketsThe wholesale fish markets are generally located at strategic points where the fish and fisheryproducts arrive and distributed to different parts of the country. The trading is mainlybetween agents /intermediaries and also packing and repacking of fish take place in thesemarkets. Most of the wholesale markets in the country at present are in an unorganized way,without adequate facilities <strong>for</strong> fish handling and storage. For improving the wholesalemarkets, there needs to be adequate parking space <strong>for</strong> the vehicles, loading and unloadingfacilities including equipments. A well developed transportation system is an essentialcomponent of wholesale <strong>marketing</strong>. Development of motorable roads, connectivity withother retail and landing centres and interior markets should be established to facilitate easytransportation. Large scale storage facilities, cold storage, provision <strong>for</strong> ice, water,communication facilities and waste management system, etc. are to be established. Hygieneand sanitation as per prescribed standards should also be en<strong>for</strong>ced.2.1.1. Eligibility criteria• State Fisheries Departments, Local civic bodies such as municipal corporations,Fishermen Cooperative Societies, NGOs dealing with fishers, State fisheriesCorporations/State Fishermen federation.• The NGOs applying <strong>for</strong> funding should have atleast 3 years track record in theconcerned field and should be recommended by autonomous fisheries bodies of theconcerned states as State fisheries corporation/ State fishermen federation.• Modernisation of infrastructure will be provided at places where existing facilitiesrequire further development by way of construction and equipments• The proposal should be viable <strong>for</strong> contributing to additional income and employment2.1.2 RequirementsThe components <strong>for</strong> the financial assistance in the wholesale markets are as follows,where need-based financial support will be provided by the Board:• Sufficient parking space• Loading and unloading facilities• Cold storage facilities• Hygienic stalls with proper roofing and tiled flooring


• The proposal should be viable <strong>for</strong> contributing to additional income andemployment2.2.2 RequirementsThe components <strong>for</strong> the financial assistance <strong>for</strong> retail outlets are as follows, whereneed-based financial support will be provided by the Board:• Cold Storage facilities• Potable water and ice facility (flake ice)• Hygienic stalls with proper roofing and flooring• Portable display unit with facility <strong>for</strong> cutting, storage• Fish dressing unit• Unloading facilities• Waste management system• Transportation facility• Communication facilities• Restroom and toilet facility• Proper drainage, Compound wall with gate2.2.3 Type of AssistanceThe NFDB assistance would be in the <strong>for</strong>m of 20% subsidy of the investment.2.3 Small scale retail units2.3.1 Eligibility criteria• State fisheries corporations/ state fishermen federation, Fishermen CooperativeSocieties, SHGs and private entrepreneurs should have proven track record andshould be recommended by the respective state fisheries departments.2.3.2 RequirementsThe components <strong>for</strong> the financial assistance in the small scale retail units are asfollows, where need-based financial support will be provided by the Board:• Vending stalls with requisite equipments• Insulated fish boxes• Deep freezer <strong>for</strong> storage• Display arrangement• Electronic balance• Equipments <strong>for</strong> fish dressing and packaging• Any other suitable items


Table : 1Estimated Cost <strong>for</strong> Wholesale market (approx.) – above Rs. 1 CroreTotal area envisaged is 1 acre which is 43560 sq. feet.Sl.No.Particulars of investmentCost(Rs. Lakhs)01. Sufficient parking space 20.00Remarks20 trucks to be parked at onepoint of time (20 cents of land)02. Loading and unloading facility 5.00 5 Loading Plat<strong>for</strong>ms03. Cold Storage facility 45.00 3 no. (capacity 10 tons each)04.Modern civil structures withsufficient moving space / Hygienicstalls with proper roofing and tiledflooring (50 nos.)55.0005. Packing and transportation 7.005000 sq. feet @ 700 Rs. Andadditional 20000 sq feet @ Rs.1.00 per sq. feet.06. Ice, water and accessories 42.00 4 no. Flake ice units07. Communication facilities 2.0008. In<strong>for</strong>mation system 2.00Digital Display Board ofavailable products and prices09. Waste management system 25.00 Effluent Treatment Pants, etc.10. Resting room and toilet facilities 5.0011. Proper drainage 10.00 Plumbing12.13.Sufficient water supply withoverhead tankCompound wall with gate <strong>for</strong>protection5.0010.0014. Canteen 7.00With taps at vendor plat<strong>for</strong>ms,loading and unloading points,etc.15.Miscellaneous and un<strong>for</strong>eseencosts10.00TOTAL 250.00


Table : 2Estimated Cost <strong>for</strong> MAJOR RETAIL MARKET – Investment cost fromRs. 50 lakhs to Rs. 1 croreTotal area envisaged is 0.5acre which is 21780 sq. feet.Sl.No.Particulars of investmentCost(Rs. Lakhs)Remarks01. Cold Storage facility 15.00 2 nos.02. Portable water and ice facility 20.00 Flake ice machines03.04.Hygienic stalls with proper roofingand tiled flooring (20 nos.)Portable display unit with facility<strong>for</strong> cutting storage14.00 2000 sq. feet @ 700 Rs.10.0005. Fish Dressing facility 2.0006. Unloading facility 2.00Stainless Steel table @ 6 lakhs,Visi-coolerTemperature controlled roomwith suitable cutting tables,vessels, equipments, etc.2 Loading Plat<strong>for</strong>ms, withcleaning facility07. Packing and transportation 12.00Tarred approach road andcircling road <strong>for</strong> transport at Rs.400 per sq. m.08. Waste management system 8.00 Effluent Treatment Plants, etc.09. Resting room and toilet facilities 2.0010.Proper drainage, Compound wallwith gate <strong>for</strong> protection15.00TOTAL 100.00


Table : 3Estimated Cost <strong>for</strong> minor retail market – Investment costupto Rs. 50 lakhsTotal area envisaged is 0.25 acre which is 10890 sq. feet.Sl.No.Particulars of investmentCost(Rs. Lakhs)Remarks01. Cold Storage facility 7.50 1 no.02. Portable water and ice facility 10.00 1 Flake ice machines03.04.Hygienic stalls with proper roofingand tiled flooring (10 nos.)Portable display unit with facility<strong>for</strong> cutting, storage7.00 1000 sq. feet @ 700 Rs.5.0005. Fish Dressing facility 1.0006. Unloading facility 1.0007. Packing and transportation 6.00Stainless Steel table @ 6 lakhsVisi-coolerTemperature controlled roomwith suitable cutting tables,vessels, equipments, etc.1 Loading Plat<strong>for</strong>ms, withcleaning facilityTarred approach road andcircling road <strong>for</strong> transport at Rs.400 per sq. m.08. Waste management system 4.00 Effluent Treatment Plants, etc.09. Resting room and toilet facilities 1.0010.Proper drainage, Compound wallwith gate <strong>for</strong> protection7.50TOTAL 50.00


Table : 4Schemes under rural development <strong>for</strong> promoting women and weakersections – Investments cost <strong>for</strong> small scale units upto Rs. 10 LakhsFinancial sanction is to be provided <strong>for</strong> the entire unit or the sub-unit Scheme : Setting up ofunitsBoard retain its right to approve the scheme either in full or part on the basis of its merit.Sl.No.FacilityCost(Rs. Lakhs)01. Vending stalls with requisite equipment 1.00Remarks02. Kiosks and similar trading outlets 2.0003. Mobile selling units 5.00 Two / Three wheelers etc04. Insulated fish boxes 0.50 2 nos.05. Utensils <strong>for</strong> value addition 0.1006. Stove and cooking gas 0.1507. Refrigerator/ Deep Freezer 0.2508. Any other suitable items 1.00TOTAL 10.00


Table : 5Scheme <strong>for</strong> small scale retail units upto Rs. 2.0 LakhsBoard retains its right to approve the scheme either in full or part on the basis of its merit.Sl. No.FacilityCost(Rs. Lakhs)01. Vending stalls with requisite equipment 0.8502. Insulated fish boxes (2 Nos.) 0.1003. Deep Freezer <strong>for</strong> storage 0.4004. Display unit 0.3005. Electronic balance 0.0506. Equipment <strong>for</strong> fish dressing and packaging 0.2507. Any other suitable items 0.05TOTAL 2.00


FORM – DM- IApplication <strong>for</strong> Modernization of Wholesale MarketsSl.In<strong>for</strong>mation furnished byParticulars sought from the applicantNothe applicant(1) (2) (3)1.0 Name and address of the applicant/ firm/ association/ SelfHelp Group (IN BLOCK LETTERS):2.0 Address <strong>for</strong> communication (telephone/ mobile number):2.1 Details of registration in case of NGO/ Society etc.3.0 Details of Location of the market to be modernized /proposed to be taken up:a) State:b) District:c) Taluk/ Mandal:d) Revenue Village:e) Survey Number(s):f) Ownership (whether freehold or on lease):g) If on lease, duration of lease:h) Total land area (in ha):i) Area of present civil structure (Plinth area)j) Details of the proposed renovation/ repair works/modernization (Design details/engineering works tobe certified by the Department of Fisheries/ localbodies):k) Justification <strong>for</strong> modernization with expectedoutcome4.0 Details regarding assistance received earlier <strong>for</strong> theconstruction/ modernization of the market. Renovation, ifany carried out earlier may be mentioned along with theyear and amount incurred on such renovation:5.0 Whether the applicant is in default of payment to anyFinancial Institution/ State Government <strong>for</strong> loan/ assistanceavailed earlier. If yes, please provide the details and thereasons <strong>for</strong> default:


(1) (2) (3)6.0 Estimates regarding infrastructure: (Rs. Lakhs)a) Modern civil structure with sufficient moving spaceb) Parking spacec) Hygienic stalls with modern roofing and flooringd) Cold storage facilitiese) Loading and Unloading facilitiesf) Cost of HACCP norms implementationg) Ice, Potable water facilityh) Transportation costi) Insulated vans/ trucks/ other vehicles(No. and Cost)j) Drainage and waste management facility :k) Communication and networking systeml) Amenities <strong>for</strong> the workers and Publicm) Additional land (ha) adjacent to the existing marketneeded <strong>for</strong> modernization and the approx. cost <strong>for</strong>acquiring land7.0 Experience and technical competence of the applicant8.0 Details regarding economics of operation:9.0 Whether any financial tie up has been made <strong>for</strong> availingBank loan, if so please provide the details:10.0 Expected date of completion of the work and tentativeschedule of activities:11.0 Expect rate of return of investment12.0 Source and number of labour employed <strong>for</strong> renovation aswell as day-to-day activities and expected employmentgeneration out of the scheme


Declaration by the ApplicantI/ We……...................................…………………………………………..son/daughter/wifeof……………….............................................................……………………………Residingat................................... ………………………………………………………………………hereby declare that the in<strong>for</strong>mation furnished above is true to the best of my/ ourknowledge and belief. I am/ we are fully aware that if it is found that the in<strong>for</strong>mationfurnished by me/ we/ us is false or there is any kind of deviation/ violation of the conditionsunder which assistance is provided to me by the NFDB, any action as deemed fit <strong>for</strong>violation of this condition may be taken against me/ us.Date:Place:Signature of the applicant (s)Countersigned by the implementing AgencyDate:Place:Signature and seal of the authorizedrepresentative of the ImplementingAgency


FORM – DM- IIApplication <strong>for</strong> Retail Outlets (Major/ Minor/Small Scale Units)Sl.NoParticulars sought from the applicantIn<strong>for</strong>mation furnished bythe applicant(1) (2) (3)1.0 Name and address of the applicant/ firm/ association/ SelfHelp Group (IN BLOCK LETTERS):2.0 Address <strong>for</strong> communication (telephone/ mobile number):2.1 Details of registration in case of NGO/ Society etc.3.0 Details of Location of the proposed retail market <strong>for</strong> whichcold chain set up is to be taken up:a) State:b) District:c) Taluk/ Mandal:d) Revenue Village:e) Survey Number(s):f) Ownership (whether freehold or on lease):g) If on lease, duration of lease:h) Total land area (in ha):i) Area of present civil structure (Plinth area)j) Details of the proposed capacity of the cold storagerequired (Design details to be certified by theDepartment of Fisheries/ Local bodies):k) Justification <strong>for</strong> cold storage facility with expectedoutcomel) Quantum of fish handled per day presently (tonnes)m) Destination of commodities (with distance in Km)4.0 Details regarding assistance received earlier <strong>for</strong> the market<strong>for</strong> any type of civil work. Renovation, if any carried outearlier may be mentioned along with the year and amountincurred on such renovation:5.0 Whether the applicant is in default of payment to anyFinancial Institution/ State Government <strong>for</strong> loan/ assistanceavailed earlier. If yes, please provide the details and thereasons <strong>for</strong> default:


(1) (2) (3)6.0 Estimates regarding infrastructure: (Rs. Lakhs)a) Civil structure with sufficient moving spaceb) Parking spacec) Hygienic stalls with modern roofing and flooringd) Cold storage facilities along with capacitye) Loading and Unloading facilitiesf) Cost of HACCP norms implementationg) Ice, Potable water facilityh) Transportation costi) Drainage and waste management facility :j) Communication and networking systemk) Amenities <strong>for</strong> the workers and Public7.0 Experience and technical competence of the applicant8.0 Details regarding economics of operation:9.0 Whether any financial tie up has been made <strong>for</strong> availingBank loan, if so please provide the details:10.0 Expected date of completion of the work and tentativeschedule of activities:11.0 Expect rate of return of investment12.0 Source and number of labour employed <strong>for</strong> renovation aswell as day-to-day activities and expected employmentgeneration out of the scheme


Declaration by the ApplicantI/ We……………………...................................………………………..son/daughter/wifeof……………………………….......................................…………………………..Residingat……………………………………………………………………… hereby declare thatthe in<strong>for</strong>mation furnished above is true to the best of my/ our knowledge and belief. I am/we are fully aware that if it is found that the in<strong>for</strong>mation furnished by me/ we is false orthere is any kind of deviation/ violation of the conditions under which assistance isprovided to me by the NFDB, any action as deemed fit <strong>for</strong> violation of this condition maybe taken against me/ us.Date:Place:Signature of the applicant (s)Countersigned by the Implementing AgencyDate:Place:Signature and seal of the authorizedrepresentative of the ImplementingAgency


FORM-DM- IIINational Fisheries Development BoardForm <strong>for</strong> Submission of Utilization CertificateSl. No Letter No and date Amount Certified that out of Rs ___________sanctioned during the year_________ infavour of _______ under the NationalFisheries Development Board’s Letter Nogiven in the margin and Rs_____________ on account of unspentbalance of the previous sanction, a sum ofRs ___________ has been utilized <strong>for</strong> thepurpose of____________ <strong>for</strong> which it wassanctioned and that the balance of Rs___________ remains unutilized. Thesame will be adjusted towards the nextinstallment payable during theperiod________.Physical progress:Certified that I have satisfied myself that the conditions on which the funds weresanctioned by the National Fisheries Development Board have been duly fulfilled/ are beingfulfilled and that I have exercised the following checks to see that the money was actuallyutilized <strong>for</strong> the purpose <strong>for</strong> which it was sanctioned.Date:Place:Signature and seal of the authorizedrepresentative of the ImplementingAgency

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!