12.07.2015 Views

EW M&S from Engineering to Campaign

EW M&S from Engineering to Campaign

EW M&S from Engineering to Campaign

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Bot<strong>to</strong>m Up V&VVerification & Validation– Employ V&V From Component <strong>to</strong> <strong>Campaign</strong> Predictions• Components with Specific Lab Tests– Important <strong>to</strong> Validate Components <strong>to</strong> Ensure Engagement Modeldoesn’t have Multiple Component Models Offsetting Each Other– Example» Optimistic Antenna Pattern – More Gain than Reality» Pessimistic <strong>EW</strong> System Model – Less Power Out than Reality• Engagement with Lab and Open Air– Development Test (DT) Events• Mission with Lab and Open Air– Operational Test (OT) Events• <strong>Campaign</strong> with Open Air• Must Engage Test Leads <strong>to</strong> Ensure Proper Data isCollected During EventsJuly 2009UNCLASSIFIED<strong>EW</strong> M&S – <strong>Engineering</strong> Builder <strong>to</strong> <strong>Campaign</strong> Overview

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!