12.07.2015 Views

Mohamad-Ziad Charif - Antares

Mohamad-Ziad Charif - Antares

Mohamad-Ziad Charif - Antares

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 3.13: ANTARES storeyStoreyThe role of the stories (Figure 3.13) in ANTARES is simply to provide a physicalsupport for the three OMs, and for the LCMs (Local Control Module).The purpose of the LCM is to house the electronics that is needed to powerthe OMs, processing of the signal, and finally link different stories together.The most important part of the LCM are:• The LPB or the Local Power Box which role is to deliver the power for theelectronics and the OMs of the storey.• The CLOCK board which has the role of relaying the synchronization clocksignal of the stories (ask again about this).• The ARS motherboard which does the processing and digitization of theanalogue signal sent from the PMTs, the output would be a digital signalcontaining the hit time and the hit charge.• The DAQ/SC board which mainly hosts the operating system and gathersthe data to be sent to the onshore for storage.• The COMPASS motherboard that hosts the local sensors that detect the yaw,pitch, and roll, the temperature and the humidity. In addition to the highvoltage control that is needed to power the PMTs45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!