GOVERNMENT OF INDIAMINISTRY OF ROAD TRANSPORT & HIGHWAYSDEPARTMENT OF ROAD TRANSPORT & HIGHWAYS(Project Zone – ong>10ong>)Parivahan Bhavan, 1, Sansad MargNew Delhi – 1ong>10ong>01.Fax Nos. 23719070, 23711165No. NH-12031/31/2005/Ar.P/ISC/NH-ong>10ong> Dated the 30 th March, 2007ToSub:The Commissioner (PWD),Government of Arunachal Pradesh,ITANAGAR-791111Construction of ong>10ong> numbers of Bridges of Dambuk-Paglam Road underInter-State Connectivity Schemes (ISC) in Arunachal Pradesh.( Job No. ISC-Ar.P-2006-07- 04 )Ref: Letter No. CEAP(EZ)/WTC/DBK-PAGLAM/05-06/3009 dated 25 thSeptember, 2006 from the Chief Engineer (EZ), PWD, Arunachal Pradesh,Itanagar – 791 111.Sir,I am directed to refer to letter No. CEAP(EZ)/WTC/DBK-PAGLAM/05-06/3009 dated 25 th September, 2006 from the Chief Engineer (EZ), PWD, ArunachalPradesh, Itanagar forwarding an estimate amounting to Rs. 1485.18 lakh on the abovenoted works and to say that the estimate has been examined in the Ministry andmodified to Rs. 14471.11 lakh in the light of the comments contained in the enclosedtechnical note.2. I am directed to convey the Administrative Approval, Technical Approval andFinancial Sanction of the President to the modified estimate to the extent of ong>10ong>0%amounting to Rs. 1447.11 lakh (Rupees Fourteen Crore Forth Seven lakhs and ElevenThousand only) for the above noted work.3. This ong>10ong>0% funds to this work is provided by this Ministry under the CentrallySponsored Schemes of State Roads of Inter-State Connectivity and EconomicImportance Fund.4. the work has been assigned (Job No. ISC-Ar.P-2006-07-04). This job No. maybe quoted in all future correspondence regarding this work.5. This approval is accorded subject to the following conditions:-(i) The State Government may accord the technical and financial sanction of theestimate in terms of Guidelines issued by this Ministry vide letter No. NH-17012/9/97-PL dated 14.3.2001.(ii) The funds would be release in two installments, first in April/Mau and secondin September/October. While the first installment would be released on thebasis of requirement to be communicated by the State Government, thesecond installment would be released on the basis of progress of the work andactual expenditure in the preceding half year and anticipated for the next halfyear. The release of funds for 50% financed works will be commensurate withthe expenditure proposed to be incurred from State’s own resources.

GOVERNMENT OF INDIAMINISTRY OF ROAD TRANSPORT & HIGHWAYSDEPARTMENT OF ROAD TRANSPORT & HIGHWAYS(Project Z<strong>on</strong>e – <str<strong>on</strong>g>10</str<strong>on</strong>g>)Parivahan Bhavan, 1, Sansad MargNew Delhi – 1<str<strong>on</strong>g>10</str<strong>on</strong>g>01.Fax Nos. 23719070, 23711165No. NH-12031/31/2005/Ar.P/ISC/NH-<str<strong>on</strong>g>10</str<strong>on</strong>g> Dated the 30 th March, 2007ToSub:The Commissi<strong>on</strong>er (PWD),Government of Arunachal Pradesh,ITANAGAR-791111C<strong>on</strong>structi<strong>on</strong> of <str<strong>on</strong>g>10</str<strong>on</strong>g> numbers of Bridges of <strong>Dambuk</strong>-<strong>Paglam</strong> <strong>Road</strong> underInter-State C<strong>on</strong>nectivity Schemes (ISC) in Arunachal Pradesh.( Job No. ISC-Ar.P-2006-07- 04 )Ref: Letter No. CEAP(EZ)/WTC/DBK-PAGLAM/05-06/3009 dated 25 thSeptember, 2006 from the Chief Engineer (EZ), PWD, Arunachal Pradesh,Itanagar – 791 111.Sir,I am directed to refer to letter No. CEAP(EZ)/WTC/DBK-PAGLAM/05-06/3009 dated 25 th September, 2006 from the Chief Engineer (EZ), PWD, ArunachalPradesh, Itanagar forwarding an estimate amounting to Rs. 1485.18 lakh <strong>on</strong> the abovenoted works and to say that the estimate has been examined in the Ministry andmodified to Rs. 14471.11 lakh in the light of the comments c<strong>on</strong>tained in the enclosedtechnical note.2. I am directed to c<strong>on</strong>vey the Administrative Approval, Technical Approval andFinancial Sancti<strong>on</strong> of the President to the modified estimate to the extent of <str<strong>on</strong>g>10</str<strong>on</strong>g>0%amounting to Rs. 1447.11 lakh (Rupees Fourteen Crore Forth Seven lakhs and ElevenThousand <strong>on</strong>ly) for the above noted work.3. This <str<strong>on</strong>g>10</str<strong>on</strong>g>0% funds to this work is provided by this Ministry under the CentrallySp<strong>on</strong>sored Schemes of State <strong>Road</strong>s of Inter-State C<strong>on</strong>nectivity and Ec<strong>on</strong>omicImportance Fund.4. the work has been assigned (Job No. ISC-Ar.P-2006-07-04). This job No. maybe quoted in all future corresp<strong>on</strong>dence regarding this work.5. This approval is accorded subject to the following c<strong>on</strong>diti<strong>on</strong>s:-(i) The State Government may accord the technical and financial sancti<strong>on</strong> of theestimate in terms of Guidelines issued by this Ministry vide letter No. NH-17012/9/97-PL dated 14.3.2001.(ii) The funds would be release in two installments, first in April/Mau and sec<strong>on</strong>din September/October. While the first installment would be released <strong>on</strong> thebasis of requirement to be communicated by the State Government, thesec<strong>on</strong>d installment would be released <strong>on</strong> the basis of progress of the work andactual expenditure in the preceding half year and anticipated for the next halfyear. The release of funds for 50% financed works will be commensurate withthe expenditure proposed to be incurred from State’s own resources.


(iii) In all the cases, the overall availability of budget provisi<strong>on</strong>s will be theprimary determining factor for allocati<strong>on</strong>s and the half-yearly payment wouldbe regulated accordingly. The expenditure by the State Government would,therefore, have to be c<strong>on</strong>fined to the allocati<strong>on</strong>s made for the work.(vi) The stipulati<strong>on</strong> made in Ministry’s Circular No. NH-17012/9/97-PL dated14.3.2001 may be strictly followed.6. The quarterly progress reports and m<strong>on</strong>thly statement of expenditure of worksshould be furnished to this Ministry with copy endorsed to Regi<strong>on</strong>al Office of theMinistry within <strong>on</strong>e m<strong>on</strong>th from the close of the quarter as per proforma (Annexure I, II& III) enclosed with Ministry’s letter No. NH-17012/9/97-PL dated 14.3.20017. The State Government should furnish completi<strong>on</strong> certificate duly vetted byaudit after completi<strong>on</strong> of work as per targets.8. The following physical and financial cumulative targets shall be achieveddepending up<strong>on</strong> the availability of funds:Financial Year Physical (%) Financial (Rs. In lakh)2006-2007 Preliminary 0.932007-2008 50 700.002008-2009 <str<strong>on</strong>g>10</str<strong>on</strong>g>0 1447.119. The expenditure is debitable under the major Head “3601” Grants-in-aid toState Govt. 04 Grant for Centrally sp<strong>on</strong>sored schemes - 04.<str<strong>on</strong>g>10</str<strong>on</strong>g>5 – Grants from Central<strong>Road</strong> Fund – 01- <strong>Road</strong>s of Inter-State and Ec<strong>on</strong>omic Important - 00.00.31 – Grant–in–aid under the Demand No. ‘85’ is Department of <strong>Road</strong> Transport & Highways for theyear 2006-2007.<str<strong>on</strong>g>10</str<strong>on</strong>g>. This sancti<strong>on</strong> issues with the c<strong>on</strong>currence of the Finance Divisi<strong>on</strong> videtheir U.O. No. 2570-TF-II/2006 dated 13.3.2007Yours faithfully,(H.K. Roy)Under Secretary to the Govt. of IndiaCopy, with a copy of he technical note forwarded to:1. The Chief Engineer (<strong>Road</strong>s), Arunachal Pradesh, Itanagar – 791 111 (Acopy of the approved estimate enclosed).2. Regi<strong>on</strong>al Officer, Ministry of Shipping, <strong>Road</strong> Transport & Highways,Department of <strong>Road</strong> Transport and Highways, Rajgarh <strong>Road</strong>, Guwahati–781 003.3. Accountant General, Government of Arunachal Pradesh-791 111.4. The Pay and Accounts Office, M/o Shipping, <strong>Road</strong> Transport & Highways,Department of <strong>Road</strong> Transport & Highways, Jam Nagar House, IDABuilding, New Delhi.


5. The Regi<strong>on</strong>al Pay and Accounts Officer (NH), M/o Shipping, <strong>Road</strong>Transport & Highways, Department of <strong>Road</strong> Transport & Highways,Hrishikeshayan, Hriday Ranjan Path, 6 th Byelane (W) R.G. Baruah <strong>Road</strong>,Guwahati – 781 003.6. The Principal Director of Audit, Ec<strong>on</strong>omic & Services Ministries, A.G.C.R.Building, New Delhi – 1<str<strong>on</strong>g>10</str<strong>on</strong>g> 002.7. The Director (NE-I), Ministry of Home Affairs (NE Divisi<strong>on</strong>), North Block,New Delhi w.r.t. their ID No. MHA.1/15/05-NEDC dated 25 th September,2006(H.K. Roy)Under Secretary to the Govt. of IndiaCopy with enclosure also forwarded to:-(i) P.S. to Minister, Shipping, <strong>Road</strong> Transport & Highways.(ii) CE(P-<str<strong>on</strong>g>10</str<strong>on</strong>g>) / SE(PL) / SE(M<strong>on</strong>) / EESG(P-<str<strong>on</strong>g>10</str<strong>on</strong>g>) / EE(P-<str<strong>on</strong>g>10</str<strong>on</strong>g>)-II/ Finance Wing /W&A Secti<strong>on</strong>/ Guard File.(Dhananjay Kumar)Secti<strong>on</strong> OfficerTeleph<strong>on</strong>e No. 237174


GOVERNMENT OF INDIAMINISTRY OF ROAD TRANSPORT & HIGHWAYS(DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS)No. NH-12031/31/2005/Ar.P/ISC/NH-<str<strong>on</strong>g>10</str<strong>on</strong>g> Dated: 30 th March, 2007TECHNICAL NOTE1. Name of work : C<strong>on</strong>structi<strong>on</strong> of <str<strong>on</strong>g>10</str<strong>on</strong>g> numbers of Bridges <strong>on</strong> <strong>Dambuk</strong>– <strong>Paglam</strong> <strong>Road</strong> under Inter-State C<strong>on</strong>nectivityScheme (ISC) in Arunachal Pradesh.(Job No. ISC – Ar.P-2006-07-04)2. State : Arunachal Pradesh3. Estimated cost(Rs. In lakhs): As forwarded by StatePWDAs modified in theMinistry1485.18 1447.114. Reference : Letter No. CEAP(EZ) / WTC / DBK-PAGLAM /05-06 / 3009 dated 25 th September 2006 from theChief Engineer (EZ), PWD, Arunachal Pradesh,Itanagar – 791 111.COMMENTS1. Scope of work:C<strong>on</strong>structi<strong>on</strong> of ten numbers of double-lane Bridges of spans varying from 12 mto 80 m across various Nallahs between chainages 33.360 amd 45.858 al<strong>on</strong>g withthe c<strong>on</strong>structi<strong>on</strong> of approaches <strong>on</strong> <strong>Dambuk</strong>-<strong>Paglam</strong> road in Arunachal Pradesh.2. Provisi<strong>on</strong>s:Broad features:2.1 Silting:The alignment plans for the road and nallahas have been enclosed with theestimates. The proposal of the State PWD to c<strong>on</strong>struct <str<strong>on</strong>g>bridges</str<strong>on</strong>g> <strong>on</strong> the proposedalignment has been agreed to. However, the Chief Engineer, State PWD, mayreview the siting of <str<strong>on</strong>g>bridges</str<strong>on</strong>g> as per clause <str<strong>on</strong>g>10</str<strong>on</strong>g>2.2 of IRC:5-1998 and get thesefinalized at his end.2.2 Span arrangement:Hydraulic particulars for evaluating waterways for the proposed <str<strong>on</strong>g>bridges</str<strong>on</strong>g> havebeen enclosed with the estimate. However, the span arrangement of <str<strong>on</strong>g>bridges</str<strong>on</strong>g> hasbeen proposed keeping in view the distance between the firm banks at HFL. Thesame is agreed to for estimate purpose. However, Chief Engineer, State PWD,may satisfy himself before executi<strong>on</strong>.2.3 Foundati<strong>on</strong> & Substructure:The subsoil investigati<strong>on</strong> at the Singking bridge site has reportedly been carriedout. Preliminary explorati<strong>on</strong> in general reveals sandy, same profile & soil typesand properties as the proposed <str<strong>on</strong>g>bridges</str<strong>on</strong>g> are <strong>on</strong> the right bank of Singking of riverwithin 1 to 5 km and most of the nallah <strong>on</strong> which <str<strong>on</strong>g>bridges</str<strong>on</strong>g> have been proposedjoins it i.e. are its tributaries. As per the soil report, the site has reportedly low


earing capacity and therefore deep foundati<strong>on</strong>s have been adopted. Keeping thisin view, well foundati<strong>on</strong> of 6m dia with 1 m steining thickness for abutments <strong>on</strong>both banks and <strong>on</strong>e intermediate pier for bridge over Singking river have beenproposed without carrying out subsoil investigati<strong>on</strong> for all <str<strong>on</strong>g>bridges</str<strong>on</strong>g>. The proposedwell foundati<strong>on</strong> has however been accepted for estimate purpose. However, thesubsoil investigati<strong>on</strong> for all <str<strong>on</strong>g>bridges</str<strong>on</strong>g> at proposed abutment/pier locati<strong>on</strong>s may becarried out before executi<strong>on</strong> and the design of foundati<strong>on</strong>/sub-structure may bed<strong>on</strong>e as per the soil type actually met at these locati<strong>on</strong>s, and got approved byChief Engineer, PWD at his end.2.4 Founding Level:Various founding levels proposed for <str<strong>on</strong>g>bridges</str<strong>on</strong>g> is accepted for estimate purpose.The State PWD is however, suggested to check scour depth calculati<strong>on</strong>s as persoil characteristics available during executi<strong>on</strong>. Further, the founding levels maybe reviewed in view of soil properties actually met with a founding level duringexecuti<strong>on</strong>.2.5 Superstructure:For all <str<strong>on</strong>g>bridges</str<strong>on</strong>g> except Singking bridge (2*40 m), superstructure have beenproposed as per Ministry’s Standard drawing of BD series (without footpath).The superstructure of bridge over Singking Nallah has been proposed as perMinistry’s Standard drawing of SD series. The carriageway of the proposed<str<strong>on</strong>g>bridges</str<strong>on</strong>g> is 7.50 m and overall width is 8.60 m. the arrangement as above has beenagreed to. The Chief Engineer, PWD may, however, satisfy himself about thestructural safety of the superstructure before awarding the work. The wearingcourse over the bridge has been accepted as proposed by PWD.2.6 Expansi<strong>on</strong> Joints:Elastomeric slab steel expansi<strong>on</strong> joints have been agreed to as proposed by StatePWD. It should be as per Ministry’s Specificati<strong>on</strong>s.2.7 Bearings:i). Rocker bearing and Roller – cum – rocker bearing proposed for Singkingbridge has been agreed to. This should c<strong>on</strong>form to the Ministry’sSpecificati<strong>on</strong> for <strong>Road</strong> & Bridge works and IRC:83.ii). For <str<strong>on</strong>g>bridges</str<strong>on</strong>g> of 12.50 m, 14.50 m & 24.75 m effective span, elastomericbearings have been proposed. The same is acceptable.2.8 General Arrangement Drawing (GAD):2.8.1 GAD for bridge have been enclosed but these are not exactly as per IRCSP-54:2000. It may therefore be suggested to PWD that properlydimensi<strong>on</strong>ed General Arrangement Drawing (GAD) for all the <str<strong>on</strong>g>bridges</str<strong>on</strong>g>showing details of elevati<strong>on</strong> & plan of the bridge, cross-secti<strong>on</strong> details ofsuperstructure/substructure/foundati<strong>on</strong>, besides other requisite details ofbridge as per clause 6.6.3 (viii) of IRC SP:54-2000 (Project Preparati<strong>on</strong>Manual for Bridges), based <strong>on</strong> detailed survey, sub-soil investigati<strong>on</strong>report etc. may be got prepared and approved by Chief Engineer, PWDArunachal Pradesh at his end and a copy of approved GAD may befurnished to this Ministry for reference and record.2.8.2 The vertical clearance proposed above HFL may be ensured by the StatePWD in accordance to stipulati<strong>on</strong>s vide clause <str<strong>on</strong>g>10</str<strong>on</strong>g>6.2.1 of IRC:5-1998.


2.8.3 Approach slabs of 3.50 m in length covering the entire width of roadway<strong>on</strong> both sides of <str<strong>on</strong>g>bridges</str<strong>on</strong>g> approach has been provided. The approach slabmay be provided as per Ministry’s circular No. 34015/2/86-S&R dated22.06.1994.2.8.4 The necessary provisi<strong>on</strong>s for carrying lighter utility services over thebridge may be made by providing hangers fixed <strong>on</strong> outer side of railingkerb as per guidelines vide Ministry’s circular No. RW/NH-34066/7/2003-S&R(B) dated 17.09.2003.2.8.5 Minimum mix of c<strong>on</strong>crete in various comp<strong>on</strong>ents of bridge structure shallbe c<strong>on</strong>sidered as per clause 1703 of Ministry’s Specificati<strong>on</strong> for <strong>Road</strong> &Bridge works (4 th Revisi<strong>on</strong>).2.9 Approaches:<strong>Road</strong>way width has been kept as 9.00 m for all bridge approach. The carriagewaywidth is 3.75 m with hard shoulders of 600 mm wide. The approach road beenagreed to for all <str<strong>on</strong>g>bridges</str<strong>on</strong>g> as proposed except for Sarku Nallah for which it hasbeen restricted to 150m. Approach filling <strong>on</strong> the both side approach maintaininga minimum gradient of 1:20 with a side slopes as 2:1 has been proposed to beprovided which has been agreed to.The following crust compositi<strong>on</strong> for the new pavement c<strong>on</strong>sidered in the <str<strong>on</strong>g>bridges</str<strong>on</strong>g>approaches has been agreed:Sub-base : WBM Grade-I - <str<strong>on</strong>g>10</str<strong>on</strong>g>0 mmBase : WBM Grade-II - 75 mm: WBM Grade-III - 75 mmWearing Course : PC & SC - 20 mm2.<str<strong>on</strong>g>10</str<strong>on</strong>g> Lead:The carriage cost of aggregates and other materials has been allowed as proposedby State for estimate purpose. However, while calling tender, the source may notbe indicated. The c<strong>on</strong>tractor shall be resp<strong>on</strong>sible to procure the materialsc<strong>on</strong>forming to the relevant Ministry’s specificati<strong>on</strong>s and IRC guidelines. Noprovisi<strong>on</strong> for extra lead during executi<strong>on</strong> of the work shall be allowed.2.11 Rates:The estimate has been prepared based <strong>on</strong> Arunachal Pradesh Schedule of Rates(APSR-2005) applicable in the State PWD.3. Cost of work:The estimate cost of the work, in the light of above comments works out to Rs.1447.11 lakhs including 1% quality c<strong>on</strong>trol, 1.5% work charged establishmentand 2.80% c<strong>on</strong>tingency.4. Targets for the work:The following physical and financial cumulative targets may be achieveddepending up<strong>on</strong> the availability of funds.Year of Phasing Physical Phasing (%) Financial progress (Rs. Lakhs)2006-2007 Preliminaries 0.932007-2008 50 700.002008-2009 <str<strong>on</strong>g>10</str<strong>on</strong>g>0 1447.11


6.7 During the course of executi<strong>on</strong> of work, traffic may be regulated inaccordance with the guidelines c<strong>on</strong>tained in Ministry’s letter No.RW/NH/33038/1/87-NH-Std. dtd 7-<str<strong>on</strong>g>10</str<strong>on</strong>g>-87. The display boards <strong>on</strong>development activities of the work shall be made as per guidelines videMinistry’s letter No. RW/NH-33044/<str<strong>on</strong>g>10</str<strong>on</strong>g>/2000-S&R dated 17.7.20016.8 The display boards <strong>on</strong> development activities of the work shall be made asper guidelines issued vide Ministry’s No. RW/NH-33044/<str<strong>on</strong>g>10</str<strong>on</strong>g>/2000-S&R(R) dated 12.08.2002(Rananjay Singh)Executive EngineerFor Director General (<strong>Road</strong> Development) & Special Secretary