110Effective stress increment at end of 9.5 months = 105.6 kN/m 2 (see Table D2.5)As only 97.3% pore water pressure is dissipated at end of 22 ndthereforemonth (see Table D2.7),ACT, v, z=0.5m, 22th month= 105.6 + (208.3 -105.6) x 0.973 - 205.5 kN/m 2From Equation 4.la, the primary consolidation settlement in the first layer (H = 1.0m foreach sub-layer) due to the loading of reclamation fill and surcharge preloading (with verticaldrains) is given by:, 22th month = HCR 1(3 g(^vn ! +Acr V7=0 _ 5ni _ 22lvO "^ ^,2=0.5m, 22nd month •'vO= 0.54m2.95<strong>The</strong> settlement for the primary consolidation settlement due to reclamation fill and surchargepreloading (with vertical drains) at the time of surcharge removal (end of the 22 nd month) forall the sub-layers are calculated as follows:Table D2.8Sub-layer12345678910z(mPD)-8.5-9.5-10.5-11.5-12.5-13.5-14.5-15.5-16.5-17.5Initialeffective stress(kN/m 2 )2.958.8514.7520.6526.5532.4538.3544.2550.1556.05Effective stressincrement(kN/m 2 )205.5198.9194.4192.5191.9191.9192.5194.4198.9205.5<strong>To</strong>talSettlement atthe end of 22 ndmonth (m)0.540.400.330.290.270.240.230.210.200.192.90<strong>The</strong> total consolidation settlement due to reclamation fill and surcharge preloading (withvertical drains) at the end of the 22 nd month is estimated to be 2.9 m.