12.07.2015 Views

Final Sec. 7 BOQ-Crystal IT Park Balance Work - Madhya Pradesh ...

Final Sec. 7 BOQ-Crystal IT Park Balance Work - Madhya Pradesh ...

Final Sec. 7 BOQ-Crystal IT Park Balance Work - Madhya Pradesh ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sn. Particulars Unit Qty.N FABRICATION WORKN-2 Supply & installation of GI chain linked fencing made from 8 gauge GI wire Mtr. 175with each chain block are of approx. 40mm 40 mm. (Width of fencing is 1800mm)O LIGHTNING CONDUCTORO-1 Supply, Installation, Testing & commissioning of earthing stations using Nos. 4600*600*3.15 mm CU plate as earth electrodes buried in layer of coke & salt at2 meter depth below ground level. The scope also includes excavation 0.9*0.9*2mtr. In all type of soil and back filling including preparing brick masonrychamber 200 mm thick and 450 mm deep with 1:4 cement mortar with 1:3plaster from inside the chamber 12 mm thick, fixing of 300 mm* 300mm CIcover (cover shall be of medium duty with weight not less than 10 Kg), funneletc. as per IS 3043/1966 revised up to date.O-2 Supply & installation of lightning conductor copper two mtr. long with 5 nos. Nos. 8110 mm long copper spokes with threaded attachement on copper sphere dia 50mm, EC grade copper tube dia 25 mm * 1.6 mm wall thickness, MS/GI clampswith 0.5 inch bolt (3 nos.) on insulated support complete.O-2 Supply & laying of CU strips 25 mm*5 mm with CU spacers & insulated Mtr. 500supports for lightning conductor on top of the ‐ building & over head tank as perdwg. Specifications. The jointing of CU strip shall be done by overlapping,welding on 3 sides & painting with anti corrosive bitumen paint including GIpipe 40 mm class B (TATA/SAIL Make) Protection up to 6 mtr. MS pipe railingin staircase and balconyP BUILDING MANAGEMENT SYSTEMP.1 Supply, installation, testing and commissioning of controllers for AHU Nos. 42comprising of various AI, DI, AO and DO confirming to data point summaryAHU's shall have individual dedicated controllers. The controllers shall belocked in a vandal proof, lockable and well secured MS cabinet, confirming toIP 55 standards.P.2 Supply, installation, testing and commissioning of controllers for Chillers,PUmps, CT's, Plumbing and electrical system comprising of various AI, DI, AOand DO confirming to data point summary AHU's shall have individualdedicated controllers. The controllers shall be locked in a vandal proof, lockableLot 1P.3 Supply, installation, testing and commissioning of Gateway/ network controlunitrs require for connecting CWS with LAN and for connectivity of the samewith all the controllers.P.4 Supply, installation, testing and commissioning of the central control stationconsisting of the following accessories.Lot 1Page 42 of 92

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!