12.07.2015 Views

Final Sec. 7 BOQ-Crystal IT Park Balance Work - Madhya Pradesh ...

Final Sec. 7 BOQ-Crystal IT Park Balance Work - Madhya Pradesh ...

Final Sec. 7 BOQ-Crystal IT Park Balance Work - Madhya Pradesh ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sn. Particulars Unit Qty.D Providing and Fixing premoulded bituminous filler of 25mm thick (Shalitex or Sqmt 133.113other equivalent approved make) for expansion joints including cuttingpositioning, supporting, scaffolding and filling with approved sealing(polysulphide 25x40 mm) compound all compete as per specifications ofmanufacturer and as directed by EICE Providing and Fixing covering sheet of aluminium 3mm thick and 150mm wide Sqmt 500over expansion joints including screwing, colouring as required, cuttingpositioning, supporting, scaffolding all compete as per specifications ofmanufacturer and as directed by EICF Providing and fixing in position hand railing up to 900 mm high above finish Rmt 630floor level over stair and landing consisting of cast iron (max 8kg) decorativevertical, powder coated (basic rate 50/kg) one number on alternate stepembedded In floor and each grouted with cement mortar and bolted on top a M.S40mm pipe with all required bends, caps and other accessories decorative typehand rail including painting of two coats of primer and approved make , shadeenamel paint & all material. and labour, complete.G Providing and fixing in position hand railing over stair and landing consisting of Rmt 380M.S 40mm pipe grouted with cement mortar in wall and bolted on top a ith allrequired bends, decorative type hand rail including painting of two coats ofprimer and approved make , shade enamel paint & all material and labourcomplete.H Providing and laying 1200mm wide plinth protection all around the building as Sqmt 700per following sequence.a. Excavation and disposal of black cotton soil to a depth of 500mm, Supplying,filling and consolidating murrum to the required level.b. Providing and laying 100microns thick black HDPE film over murrum.c. Providing and laying 100 mm thick PCC 1:2:4 using 20mm nominal sizecoarse aggregate including edge shuttering, making wire mesh impression at thetop, curing etc. all complete as directed by Site Engineer.I Breaking/cutting/making chases/Grooves in of Plain / Reinforced CementConcrete using the following method and disposing the same as directed by siteEngineer.a) Manually by chisel Cum 15J Breaking/cutting/making chases/Grooves in of brick work and disposing thesame as directed by site Engineer.Cum 15Page 14 of 92

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!